Forwards Corrective Action Program Insp Rept 50-382/98-02 on 980202-20.No Violations Noted.Requests Confirmation of Requlatory Commitment Re Rev to Procedure Instructing Medical Staff on Physical Exam within 30 Days
ML20248L867
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/20/1998
From: Harrell P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20248L869 List:
References
50-382-98-02, 50-382-98-2, NUDOCS 9803240321
Download: ML20248L867 (5)


See also: IR 05000382/1998002

Text

_ _ _ _ _ _ _ _ -

. _

. .

..

.

.

.

.

.

.

. . . . ,

w

/ga asc0c,I

UNITED STATES

~

t

NUCLEAR REGULATORY COMMISSION

,

, fg

REGION IV

g

611 RYAN PLAZA DRIVE. SUITE 400

0

AR LINGTON. TEXAS 760114064

.****

MAR 2 01998

. Charles M. Dugger, Vice President

Operations - Waterford 3

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

SUBJECT: NRC INSPECTION REPORT 50-382/98-02

Dear Mr. Dugger:

From February 2-20,1998, a corrective action program inspection was conducted at your

Waterford Steam Electric Station, Unit 3, reactor facility. Following the exit meeting, the results

of this inspection, related to the design-basis concems with the containment spray flow rate,

were discussed with Mr. Tim Gaudet of your staff. The enclosed report presents the scope and

results of that inspection.

,

l

Generally, this inspection found that your corrective action program and self-assessment

capabilities have improved.

]

!

!

During the exit meeting conducted on February 20,1998, the Director, Plant Support committed

'

to revise the procedure that instructed the medical staff on physical examination of plant _

personnel by May 30,1998. Specifically, the procedure would be revised to document that

personnel would be reminded of the need to obtain special eyewear, if needed, and a space

would be added for confirmation by the employee that they were informed. Please confirm this

regulatory commitment in writing within 30 days of the date of this letter.

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincere

/

,

)

1

P

. Harrell, Chief

Project Branch D

Division of Reactor Projects

\\

Docket No.:

50-382

License No.: NPF-38

Enclosure:

NRC Inspection Report

)

50-382/98-02

9803240321 980320

PDR

ADOCK 05000382

G

PDR

- _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - - _

. - _ - - _ _ _ _ _ _ _ - _ _ - - - _ - _ - - - - _ _ - .

.

..

Entergy Operations, Inc.

-2-

l

cc w/ enclosure:

l'

Executive Vice President and

l

Chief Operating Officer

!

Entergy Operations, Inc.

P.O. Box 31995

l

- Jackson, Mississippi 39286-1995

'

l

Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway -

P.O. Box 651

Jackson, Mississippi 39205

l

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

L

P.O. Box B

'

. Killona, Louisiana 70066

Manager- Licensing Manager

- Waterford 3 SES

Ente gy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Chairman

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

Director, Nuclear Safety &

Regulatory Affairs

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

William H. Spell, Administrator

,

Louisiana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

.

- .

.

. _ _ _ _ _ _ _ _ _ - _ - _ _ _ - _ - _ _ - - _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _

_ _ _ _ _ _ _

.

.

Entergy Operations, Inc.

-3-

Parish President

St. Charles Parish

'

P.O. Box 302

Hahnville, Louisiana 70057

Mr. William A.' Cross

Bethesda Licensing Office

3 Metro Center

Suite 610

Bethesda, Maryland 20814

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

!

I

l

1

l

I

l

___-___-____

i

-

t

.

Entergy Operations, Inc.

-4-

MAR 2 0 l998

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

l

E-Mail report to Document Control Desk (DOCDESK)

1

E-Mail report to Richard Correia (RPC)

l

E-Mail report to Frank Talbot (FXT)

l

l

bec to DCD (IE01)

bec distrib. by RIV:

-

Regional Administrator

Resident inspector

I

DRP Director

DRS-PSB

Branch Chief (DRP/D)

MIS System

Project Engineer (DRP/D)

RIV File

j

Branch Chief (DRP/TSS)

l

DOCUMENT NAME: R:\\_WAT\\WT802RP. GAP

To receive copy of document, Indicate in box:"C" = Qopy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:PE:pRM/Q , Q1

C:DRPA /,1A

GAPio6 \\ j(tpTJ

PHHak W /

3/W/98 )( T g

3/10/9%/

\\

/ 'pFICIAL RECORD COPY

l

_ _ _ _ _ _ _ _ _ _ _ _ -

.

_--___-_-__-______-_- _ _ _____ _ _____ _ _ -_

__

l*

MAR 2 01998

l

Entergy Operations, Inc.

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPAS)

l

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

Branch Chief (DRP/D)

MIS System

Project Engineer (DRP/D)

RIV File

l

Branch Chief (DRP/TSS)

l

.

!

,

t

!

l

DOCUMENT NAME: R:\\_WAT\\WT802RP. GAP

To receive copy of document. Indicate in box:"C" = Qopy without enclosures "E" = Copy with enclosures "N" = No copy

,

l

RIV;PE:pR8/Q , Q1

C:DRPA /,i]\\

i

GAPicG \\ VfLj

PHHakW/

3/W/98 )( V 8'

3/10/9lf\\7

\\

/ $FFICIAL RECORD COPY