ML20248L602

From kanterella
Jump to navigation Jump to search
PNO-78-025:on 780207,as Result of Planned Engineering Design Review Required by License Condition & Now Being Conducted by Licensee,Certain Welded Attachments Identified & Not Performed in Accordance W/Piping Code USAS B31.7
ML20248L602
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/07/1978
From: Klingler G, Nolan F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
PNO-78-025, PNO-78-25, NUDOCS 9806110262
Download: ML20248L602 (1)


Text

~Y$

$ f/k

[W$@b i

j PRELIMINARY NOTIFICATION February 7,1978

)

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-78-25 This preliminary notification constitutes EARLY notice of an event of i

POSSIBLE safety or public interest significance.

The information l

presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.

FACILITY:

Virginia Electric and Power Company North Anna, Unit No. 1 Docket No. 50-338 Louisa County, Virginia j

i

SUBJECT:

INCORRECT WELDS ON ATTACHMENTS TO CATEGORY I l

PIPING SYSTEMS I

As a result of the planned engineering design review required by license conditions and now being conducted by the licensee,.certain j

welded attachments were identified which were not performed in accor-EEns :

dance with piping code USAS B31.7.

Specifically, fillet we16s rather

{ bl than required full penetration welds were found on twenty seismic

/l

(

hangers and trunnions in Category I piping systems.

Approximately 39 i

additional supports are suspect.

The licensee is continuing both the I

evaluation of this problem and the overall engineering design review.

Four IE inspectors have been and are onsite reviewing the preliminary

[,

findings of the overall design review.

/2 01 There has been no media interest thus far but interest is expected.

-).

The Commonwealth of Virginia has been notified.

A news release is not, planned by the licensee.

NRC is considering a news release.

Region II (Atlanta) received notification of this occurrence by tele-phone from an IE inspector at 9:30 a.m. on February 7.

This information is current as of 1:00 pm on February 7.

Contact:

G.Klingler IE, x28019; F. Nolan, IE, x28019 Distribution:

Transmitted H St.?'. Y Y Chairman Hendrie Commissioner Bradford Commissioner Kennedy S. J. Chilk, SECY C. C. Kammerer, CA Commissioner Gilinsky (For Distribution)

MNBB 2.' @ / P B1dg 3, V f E. Vol jgen, IE Transmitted:

j!f7-L. V. Gossick, ED0 ~

E. G. Case, NRR Region y S. H. Hanauer, ED0

~

J. J. Fouchard, PA SS Bldg I D -

(MAIL)

R. Hartfield, MIPC C. V. Smith, NMSS R. J. McTiernan, DIA R. G. Ryan, OSP R. Minogue, SD H. K. Shapar, ELD 9806110262 780207 PRELIMINARY NOTIFICATION PDR IEE PNO-78-25 PDR f

'f