PRELIMINARY NOTIFICATION
~
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-78-24 i
This preliminary notification constitutes EARLY notice of an event or POSSIBLE safety or public interest significance.
The information presented is as initially received without verification or evaluation a_nd is basically all that is known by IE staff on this date.
Facility:
Boston Edison Company Pilgrim Unit 1 Brockton, Massachusetts (DN-50-293)
Subject:
PLANT SHUTDOWN FROM STORM As a result of the winter storm February 6,1978, the power transmission lines which connect the plant to the power grid were lost because of icing conditions.
The plant was shutdown at 7:00 p.m. February 6,1978.
Power for safety related systems is presently being supplied by the diesel generators.
No safety problems exist and the plant will remain on its diesel generators until offsite power lines are restored.
No estimate of time for this
+
P restoration has been established.
No operating problems are anticipated.
A press release is anticipated, by the licensee.
The State of Massachusetts
/
(
bas been informed.
Media interest is expected because of power shortages
/
experienced in the Northeast as a result of the snow storm.
!b NRC, Headquarters, obtained this information by telephone from the plant Shift Supervisor at 10:30 a.m. February 7,1978.
g g
Contact:
GKlingler, IE x28019 FNolan, IE x28019 JSniezek, IE x28019 2
Distribution:
Transmitted H St /l Vf' Chairman Hendrie Commissioner Bradford Commissioner Kennedy S. J. Chilk, SECY C. C. Kammerer, CA Commissioner Gilinsky (ForDistribution)
Transmitted:.MHBB /l3 0 P Bldg / T F E. Volge
, IE
~
L. V. Gossick, EDO E. G. Cise, NRR Region
/l>~T S. H. Hanauer, EDO t
J. J. Fouchard, PA SS Bldgi > 3 (MAIL)
R. Hartfield, MIPC C. V. Smith, NMSS T. J. McTiernan, DIA R. G. Ryan, OSP R. Minogue, SD H. K. Shapar ELD l
PRELIMINARY NOTIFICATION a O.
870061j0256790207 IE-7aFa*
1 I