PNO-78-024:on 780206,power Transmission Lines Which Connect Plant to Power Grid,Lost Because of Icing Conditions as Result of Winter Storm.Plant Shutdown & Power for Safety Related Sys Being Supplied by Diesel Generators
ML20248L588
Person / Time
Site: Pilgrim
Issue date: 02/07/1978
From: Klingler G, Nolan F, Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNO-78-024, PNO-78-24, NUDOCS 9806110256
Download: ML20248L588 (1)


Text

$0f .A N& )

f. W j ft a G q ,

Y

p. February 7,19 ;_

PRELIMINARY NOTIFICATION g ~ y\

~

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-78-24 ,

i This preliminary notification constitutes EARLY notice of an event or POSSIBLE safety or public interest significance. The information '

presented is as initially received without verification or evaluation a_nd is basically all that is known by IE staff on this date.

Facility: Boston Edison Company Pilgrim Unit 1 Brockton, Massachusetts (DN-50-293)

Subject:

PLANT SHUTDOWN FROM STORM As a result of the winter storm February 6,1978, the power transmission lines which connect the plant to the power grid were lost because of icing conditions.  :

The plant was shutdown at 7:00 p.m. February 6,1978. Power for safety related systems is presently being supplied by the diesel generators.

No safety problems exist and the plant will remain on its diesel generators until offsite power lines are restored. No estimate of time for this

+

restoration has been established. No operating problems are anticipated. P A press release is anticipated, by the licensee. The State of Massachusetts /

( bas been informed. Media interest is expected because of power shortages experienced in the Northeast as a result of the snow storm. /

NRC, Headquarters, obtained this information by telephone from the plant !b Shift Supervisor at 10:30 a.m. February 7,1978. g g

Contact:

GKlingler, IE x28019 FNolan, IE x28019 JSniezek, IE x28019 2 Distribution: Transmitted H St /l Vf' Chairman Hendrie Commissioner Bradford Commissioner Kennedy S. J. Chilk, SECY C. C. Kammerer, CA Commissioner Gilinsky (ForDistribution)

~

Transmitted: .MHBB /l3 0 P Bldg / T F E. Volge , IE L. V. Gossick, EDO E. G. Cise, NRR Region /l>~T S. H. Hanauer, EDO t _

J. J. Fouchard, PA SS Bldgi > 3 (MAIL)

R. Hartfield, MIPC C. V. Smith, NMSS T. J. McTiernan, DIA R. G. Ryan, OSP R. Minogue, SD H. K. Shapar ELD l