ML20248L425
| ML20248L425 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 05/29/1998 |
| From: | Robert Williams WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20248L427 | List: |
| References | |
| CON-NRC-98-020, CON-NRC-98-20 NUDOCS 9806110151 | |
| Download: ML20248L425 (1) | |
Text
[I W
GG'p Westing l louse Commercial Nuclear fuel Division Electric Corporation o,,,,,,
Columbia South Carolina 29250 1803) 26m NRC-98-020 May 29,1998 Chief, Licensing Branch Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555
Dear Gentlemen:
Subject:
Special Nuclear Material Physical Inventory Report l
Enclosed find one NRC Form 327, "SPECIAL NUCLEAR MATERIAL (SNM) PHYSICAL 1
INVENTORY
SUMMARY
REPORT," for the Material Balance Period ending April 5,1998 at the Columbia Fuel Fabrication Facility (CFFF).
The LEID, Active Inventory, Throughput, and associated Limits were recalculated according to critical procedure NMM-CP-490 due to significant changes in active inventory and variances of key material forms. The status of key measurement systems was re-evaluated. Isotopic analysis on all material forms, and % U and bulk for UF6, Rods and Uranyl nitrate comprised 95% of total variance of the LEID.
Ifyou have any questions concerning this submittal, please write to me at the above address, or telephone (803) 776-2610, Extension 3393.
1 Sincerely,
- WESTINGHOUSE ELECTRIC COMPANY I
- ~
Robert A. Williams Safeguards Coordinator i
Enclosure cc:
U.S. Nuclear Regulatory Commission J. B. Allen i
Region 11 D. L Colwell Atlanta Federal Center
/ O Attn: Mr. Edward J. McAlpine, Chief Fuci Facilities Branch
\\
Division of Nuclear Materials Safety 62 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415 jyv D 9906110151 990529 PDR ADOCK 07001151 C
- PDR,
_ - _ _ _ -