_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _
o -
- I Northern States Power Company l
Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch. Minnesota 55089 l
March 16,1998 10 CFR 50.55a l
U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos.50-282 License Nos. DPR-42 50-306 DPR-60 Unit 1 Inservice Inspection Summary Report Refueling Outage for Cycle No.19 During the 1997 Prairie Island Unit 1 refueling outage (Refueling Outage for Cycle No.
19), an inservice inspection (ISI) examination for the first period of the third interval was conducted. Attached for your information are four copies of the ISI examination Summary Report for this period.
The report identifies components examined, the examination methods used, the examination number, and summarizes the results. All anomalies were either corrected or an engineering evaluation was performed to accept "as is" conditions. A description of the corrective work and the corresponding work request numbers are provided in the ASME Section XI Repair / Replacement portion of the report.
1 This Summary Report is being submitted in accordance with the Prairie Island ASME i
Code Section XI Inservice Inspection Program and is intended to satisfy the inspection reporting requirements contained in IWA-6220 of the ASME Boiler and Pressure Vessel Code.
In this letter we have made no new Nuclear Regulatory Commission commitments.
yLO prwumgr nyppp m
I USNRC NORTHERN STATES POWEF, COMPANY f
March 16,1998 l
Page 2 l
Please contact Jack Leveille (612-388-1121, Ext. 4662) if you have any questions related to this letter.
/
oel P Sorensen Plant Manager Prairie Island Nuclear Generating Plant Regional Administrator - Region Ill, NRC (2 copies of attachment) c:
Senior Resident inspector, NRC NRR Project Manager, NRC J E Silberg (w/o attachment)
Chief Boiler inspector, State of MN P Fisher, Hartford Insurance
Attachment:
Unit 1 ISI Summary Report, dated March 10,1998 i
l U13SIRPT. DOC
_ _ - - - - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.