Forwards SE Accepting Licensee 971230 Request Re Approval to Resolve Concerns Raised Concerning Site Emergency Plan
ML20248H989
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/04/1998
From: Mckee P
NRC (Affiliation Not Assigned)
To: Bowling M
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20248H993 List:
References
TAC-MA0838, TAC-MA0839, TAC-MA0840, TAC-MA838, TAC-MA839, TAC-MA840, NUDOCS 9806080339
Download: ML20248H989 (4)


Text

Fi 4E Mr.' Martin L. ' Bowling, Jr.~ _ June 4, 1998.

Recovery Officer -Technical Strvices

( , I, Northe st Nuclear En:rgy Comprny .

=

c/o Ms. Patricia A. Loftus Dire,ctor- Regulatory Affairs P. O.' Box 128 Waterford, CT 06385

SUBJECT:

MILLSTONE NUCLEAR POWER STATION EMERGENCY PLAN, REVISION 24 SAFETY EVALUATION ( TAC NOS. MA0838, MA0839, AND MA0840)

Dear Mr. Bowling:

By letter dated December 30,'1997, Northeast Nuclear Energy Company submitted Revision 24 to the Millstone Nuclear Power Station Emergency Plan requesting the NRC staff's review and approval to resolve concems raised concoming the Site Emergency Plan as documented in l ~ Inspection Report Numbers 50-245/97-81,50-336/97-61, and 50-423/97-81.- Subsequently, the initial submittal was update 1 by letters dated March 24, April 15, and May 13,1998, which included changes 1 and 2, and revised change 2, respectively, to the Site Emergency Plan.

l The NRC staff has reviewed the requested changes tc the Site Emergency Plan and has

- . determined that the Millstone Nuclear Power Static'. Emergency Plan, Revision 24, provides an

! . adequate planning basi for an acceotable state of onsite emergency preparedness in accordance with the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50 and is, therefore, acceptable.

This completes all NRC staff actions related to the referenced TAC numbers.

/ Sincerely, Original signed by:

Phillip F. McKee Deputy Director for Licensing Special Projects Office Office of Nuclear Reactor Regulation Docket Nos. 50-245, 50-336, and 50-423

Enclosure:

Safety Evaluation -

cc w/ encl: See next page D18TRIBUTION:

C

" "E 8

WTrave s i PMcKee -

LBorry (I Ql i )

DMcDonald -.

T arris (e-mail SE only TLH3) e ygm ACRS

""Oa.

JDurr, 'RI

. DOCUMENT NAME: GAMCDONALD\MA0838.EP T. *. . . r .e m. r me m i. w.: c ~. copy wiihoui .it. chm.,3 i.nno.u . r . copy with .et. chm.ntioncio.or. u = No copy OFFICE - SPO-L:PM _ l _ SPO-L:LA c a) SPQ(jd $()

NAME DMcDonaldhRL) LBerry Eh PMUfeh i DATE 08V98 - N- 0$1/98 ' O 064f98 05/ /98: 05/ /98 OFFICIAL RECORD COPY i

s.

POR ADOCK 05000245

, F, _.

POR "

-4 x;

p* Cnu p t UNITED STATES s* j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30086 4 001

%,.....[ June 4,1998 Mr. Maitin L Bowling, Jr.

Recovery Officer -Technical Services Northeast Nuclear Energy Company c/o Ms. Patricia A. Loftus Director- Regulatory Affairs P. O. Box 128 Waterford, CT 06385

SUBJECT:

MILLSTONE NUCLEAR POWER STATION EMERGENCY PLAN, REVISION 24 SAFETY EVALUATION (TAC NOS. MA0838, MA0839, AND MA0840)

Dear Mr. Bowling:

By letter dated December 30,1997, Northeast Nuclear Energy Company submitted Revision 24 to the Millstone Nuclear Power Station Emergency Plan requesting the NRC staff's review and approval to resolve concerns raised conceming the Site Emergency Plan as documented in inspection Report Numbers 50-245/97-81,50-336/97-81, and 50-423/97-81. Subsequently, the initial submittal was updated by letters dated March 24, April 15, and May 13,1998, which included changes 1 and 2, and revised change 2, respectively, to the S;te Emergency Plan.

The NRC staff has reviewed the requested changes to the Site Emergency Plan and has determined that the Millstone Nuclear Power Station Emergency Plan, Revision 24, provides an adequate planning basis for an acceptable state of onsite emergency preparedness in accordance with the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50 and is, therefore, acceptable.

This completes all NRC staff actions related to the referenced TAC numbers.

Sincerely, F c/

Phillip F. 'Kee Deputy Director for Licensing Special Projects Office Office of Nuclear Reactor Regulatinn Docket Nos. 50-245, 50-336, and 50-423

Enclosure:

Safety Evaluation cc w/ encl: See next page

~~

7 -=

(.

Millstone Nuclear Power Station Unit 2 oc:

Lillian M. Cuoco, Esquire Mr. F. C. Rothen Senior Nuclear Counsel Vice President - Work Services Northeast Utilities Service Company Northeast Utilities Service Company

~ P. O. Box 270 P. O. Box 128 Hartford, CT 06141-0270 . Waterford, CT 06385 Mr. John Buckingham Emest C. Hadley, Esquire Department of Public Utility Control 1040 B Main Street Electric Unit P.O. Box 549 10 Liberty Square West Wareham, MA 02576 New Britain, CT 06051 Mr. John F. Streeter Mr. Kevin T. A. McCarthy, Director Recovery Officer - Nuclear Oversight Monitoring and Radiation Division Northeast Utilities Service Company Department of Environmental Protection P. O. Box 128 79 Elm Street Waterford, CT 06385

Har1 ford, CT 06106-5127 Mr. David B. Amerine Regional Administrator, Region i Vice President - Human Services U.S. Nuclear Regulatory Commission Northeast Utilities Service Comcany 475 Allendale Road P. O. Box 128 King of Prussia, PA 19406 Waterford, CT 06385 First Selectmen Mr. Allan Johanson, Assistant Director Town of Waterford Office of Policy and Management Hallof Records .

Policy Development and Planning 200 Boston Post Road. Division Waterford, CT 06385 450 Capitol Avenue - MS# 52ERN P. O. Box 341441 Mr. Wayne D. Lanning Hartford, CT 061341441 Deputy Director of Inspections Special Projects Office Mr. M. H. Brothers 475 Allendale Road Vice President - Operations King of Prussia, PA 19406-1415 Northeast Nuclear Energy Company P.O. Box 128 Charles Brinkman, Manager Waterford, CT 06385 Washington Nuclear Operations ABB Combustion Engineering Mr. J. A. Price 12300 Twinbrook Pkwy, Suite 330 Director - Unit 2 Rockville, MD 20852 Northeast Nuclear Energy Company P.O. Box 128 Senior Resident inspector Waterford, CT 06385 Millstone Nuclear Power Station clo U.S. Nuclear Regulatory Commission P.O. Box 513 Niantic, CT 06357

.= _.1. a:

Millstone Nuclear Power Station Unit 2 cc-Mr. B. D. Kenyon (Acting) . Attomey Nicholas J. Scobbo, Jr. _ .

Chief Nucler Officer- Millstone Ferriter, Scobbo, Caruso, Rodophele, PC Northeast Nuclear Energy Company 1 Bea. con Street,11th Floor P.O. Box 128 Boston, MA 02108 Waterford, CT 06385 Mr. J. P. McElwain Citizens Regulatory Commission Recovery Officer- Millstone Unit 2 ATTN: Ms. Susan Pony Luxton Northeast Nuclear Energy Company 180 Great Neck Road P. O. Box 128 Waterford, CT 06385 Waterford, Connecticut 06385 Deborah Katz, President Citizens Awareness Network P. O. Box 83 Shelbume Falls, MA'03170 The Honorable Tony Concannon Co-Chair Nuclear Energy Advisory Council Room 4035 Legislative Office Building Capitol Avenue Hartford, CT 06106 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Little Harbor Consultants, Inc.

Millstone -ITPOP Project Office P. O. Box 0630 Niantic, CT 06357-0630 Mr. Daniel L Curry Project Director Parsons Power Group inc.

2675 Morgantown Road Reading, PA 19607 Mr. Don Schopfer Verification Team Manager Sargent & Lundy 55 E. Monroe Street Chicago,IL 60603 l

\