ML20248F148

From kanterella
Jump to navigation Jump to search
Amend 118 to License NPF-43,revises TS SR 4.4.3.2.2.a for Leak Rate Test of Pressure Isolation Valves,Extending from Current 18-month Interval to 24-month Interval
ML20248F148
Person / Time
Site: Fermi 
Issue date: 05/28/1998
From: Kugler A
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20248F150 List:
References
NUDOCS 9806040121
Download: ML20248F148 (5)


Text

- _ _ - _ _ - _ _ _ _ _ _ - _ _ - _ _ - _ _ _ _. _ - _ - - _ _. _ - _ - _

a var 2

UNITED STATES g

g

]

NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 30088 4001 p

j l

DETROIT EDISON COMPANY I

DOCKET NO. 50-341 I

FERMI 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.118 License No. NPF-43 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Detroit Edison Company (the licensee) 1 deted January 28,1998, as supplemented on March 10,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; l

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and 1

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

l 1

1 l

l 9906040121 980528

[

PDR ADOCK 05000341 P

PDR l

i

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-43 is hereby amended to read as follows:

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 118, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. DECO shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance with full implementation within 90 days.

FOR THE NUCLEAR REGULATORY COMMISSION Andrew J. Kugler, Project Manager Project Directorate lil-1 Division of Reactor Projects -I!!/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance: May 28, 1998

I s

ATTACHMENTTO LICENSE AMENDMENT NO.11R FACILITY OPERATING LICENSE NO. NPF-43 DOCKET NO. 50-341 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain verticallines indicating the area of change.

REMOVE INSERT 3/4 4-11a 3/4 4-11a 3/4 4-11b 3/4 4-11b' l

l I

i I

t

  • Overleaf page provided to maintain document completeness. No changes contained on this page.

1 l

l

.,y 1tEACTOR COOLANT SYSTEM SURVEILLANCE RE0UIREMENTS (Continued) 4.4.3.2.2 Each reactor coolant system pressure isolation valve specified in Table 3.4.3.2-1 shall be demonstrated OPERABLE by leak testing pursuant to Specification 4.0.5 and verifying the leakage of each valve to be within the specified limit:

~

Itleastonceper24 months,and a.

8 b.

Prior.. to repair or, returning, the. valve :to service following maintenance, replacement work on the valve which could affect its leakage rate.

The provisions of Specification 4.0.4 are not applicable for entry into OPERATIONAL CONDITION 3.

4.4.3.2.3 The high/ low pressure interface valve leakage pressure monitors shall be demonstrated OPERABLE with alarm setpoints per Table 3.4.3.2-2 by performance of a:

CHANNEL FUNCTIONAL TEST at least once per 31 deys, and a.

b.

CHANNEL CALIBRATION at least once per 16 months.

~.

FERMI - UNIT 2 3/4 4-11a Amendment No. pp,118