Forwards Insp Rept 50-285/89-14 on 890306-10.No Violations or Deviations Noted
ML20248E417
Person / Time
Site: Fort Calhoun 
Issue date: 03/31/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20248E420 List:
References
NUDOCS 8904120239
Download: ML20248E417 (2)


See also: IR 05000285/1989014

Text

7,

+

,

-

y. s

y

+w

a

<

,

)

'

'

,;

4:

<

<

,,,

V

)

'

'

.

,

,

. ,

+

,

.

,

PAR 3 11989

't

'

>

-

.

,

In[ Reply. Refer To:.

"

Docket: 50-285/89-14

'

,7 ,

Omaha Public' Power District

.

.

' ATTN: Kenneth.J. Morris, Division Manager

.

Nuclear Operations

<

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

.This refers to'the inspection' conducted by Mr.'A. R. Johnson of this office

during the per'odLMarch 6-10, 1989, of activities authorized by NRC.0perating

License DPR-40'P r.the Fort'Calhoun Station, and to the discussion of-our

findings with-yoi ;and other members of your staff at the conclusion of the

inspection.

. Areas examined during the inspection. included'a--review of your Technical;

Specification required calibration program, and your program for. the

.

calibration of components associated with safety-related systems not addressed

in your Technical Specification. Within'these areas,1the inspection consisted

~

of selective examination' of procedures and representative. records, interviews

with personnel,'and observations by the NRC inspector. .The inspection: findings

are documented in.the enclosed inspection reportk

'Within the scope of the inspection,;no violations'or' deviations were

identified.

We have also examined actions you.have taken with regard to previously

identified inspection findihgs. The status of these items is identified in

paragraph 2 of the enclosed report.

Should-you have any questions concerning this t .pection, we will be p12ased to

discuss them with you.

Sincerely..

Ori Inal sipied By.

B. Beacli

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

.

.

Appendix - NRC Inspection Report'

50-285/89-14

cc

enclosure:

(see n 3t page)

4

,

M

DkPL

IV : I

.

C: $

D:

.

-AJohnson:1m

t tka

JLP11hoan

JCaylanL

h['

/89

p/89

{/3 /89

A./f89

8904120239 890331

E

'

'

PDR

ADOCK 05000285

D.

,

Q

PDC

'

'

"'

s

.

.

, _ _ , _ _ _ - _ - - _ _ _ _ _ ___

.

..

.

...

,

.

.,

-.

Omaha Public Power District

2

I

cc w/ enclosure:

Fort Calhoun Station-

ATTN:W. G. Gates Manager

P.O. box 399

q

Fort Calhoun, Nebraska 68023.

j

1

Harry H. Voigt, Esq.

LeBoeuf Lamb,.Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, D.C.

20036

Nebraska Radiation Control Program Director

bcc'toDMB(IE01)

'

bec distrib. by RIV:

  • R.D. Martin, RA.

.

. *RPB-DRSS

  • SectionChief(DRP/B)
  • MIS System-
  • RIV File
  • DRP
  • RSTS Operator

" Project Engineer, DRP/B

Lisa Shea, RM/ALF

  • DRS
  • P. Milano, NRR Project Manager-(MS:

13-D-18)

  • RRI
  • T. Stetka
  • A. Johnson
  • w/766

f

f

1

L

,

L

!'

i

.l