ML20248E417
| ML20248E417 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 03/31/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Morris K OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20248E420 | List: |
| References | |
| NUDOCS 8904120239 | |
| Download: ML20248E417 (2) | |
See also: IR 05000285/1989014
Text
7,
+
,
-
y. s
y
+w
a
<
,
)
'
'
,;
4:
<
<
,,,
V
)
'
'
.
,
,
. ,
+
,
.
,
PAR 3 11989
't
'
>
-
.
,
- In[ Reply. Refer To:.
"
Docket: 50-285/89-14
'
,7 ,
- Omaha Public' Power District
.
.
' ATTN: Kenneth.J. Morris, Division Manager
.
Nuclear Operations
<
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
.This refers to'the inspection' conducted by Mr.'A. R. Johnson of this office
during the per'odLMarch 6-10, 1989, of activities authorized by NRC.0perating
License DPR-40'P r.the Fort'Calhoun Station, and to the discussion of-our
- findings with-yoi ;and other members of your staff at the conclusion of the
inspection.
. Areas examined during the inspection. included'a--review of your Technical;
Specification required calibration program, and your program for. the
.
- calibration of components associated with safety-related systems not addressed
in your Technical Specification. Within'these areas,1the inspection consisted
~
of selective examination' of procedures and representative. records, interviews
with personnel,'and observations by the NRC inspector. .The inspection: findings
are documented in.the enclosed inspection reportk
'Within the scope of the inspection,;no violations'or' deviations were
identified.
We have also examined actions you.have taken with regard to previously
identified inspection findihgs. The status of these items is identified in
paragraph 2 of the enclosed report.
Should-you have any questions concerning this t .pection, we will be p12ased to
discuss them with you.
Sincerely..
Ori Inal sipied By.
B. Beacli
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
.
.
Appendix - NRC Inspection Report'
50-285/89-14
cc
enclosure:
(see n 3t page)
4
,
M
- DkPL
IV : I
.
C: $
D:
.
-AJohnson:1m
t tka
JLP11hoan
JCaylanL
h['
/89
p/89
{/3 /89
A./f89
8904120239 890331
E
'
'
ADOCK 05000285
D.
,
Q
'
'
"'
s
.
.
, _ _ , _ _ _ - _ - - _ _ _ _ _ ___
.
..
.
...
,
.
.,
-.
Omaha Public Power District
2
I
cc w/ enclosure:
Fort Calhoun Station-
ATTN:W. G. Gates Manager
P.O. box 399
q
Fort Calhoun, Nebraska 68023.
j
1
Harry H. Voigt, Esq.
LeBoeuf Lamb,.Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, D.C.
20036
Nebraska Radiation Control Program Director
bcc'toDMB(IE01)
'
bec distrib. by RIV:
- R.D. Martin, RA.
.
. *RPB-DRSS
- SectionChief(DRP/B)
- MIS System-
- RIV File
- DRP
- RSTS Operator
" Project Engineer, DRP/B
Lisa Shea, RM/ALF
- DRS
- P. Milano, NRR Project Manager-(MS:
13-D-18)
- RRI
- T. Stetka
- A. Johnson
- w/766
f
f
1
L
,
L
!'
i
.l