Text
..
.;y l
! FLOOD-
-REV '00
, q ;.
DATE'09/20/89-AP-1050 I
)-
/'
FLOODING 1.0 ENTRY CONDITIONS JE Flooding occurs, ItiE!! use this procedure.
M fl NPORM ATION 06. g g
)
C. R- (qoctoar _ ____.__. -
g g
p
~
L).
This Procedure Addresses Safety Related Components Approved'by NOS u.> N O M h DateOF - d Ff AP-1050 PAGE 1 of 7 FLOOD l
8910050090 8+0928 PDR ADOCK 05000302 jr PDC w__________-___
.~
<1-
- O i
BLANK PAGE i.
1 AP-1050 REV 00 PAGE 2 of 7 FLOOD l
r k
l
7 2.0 IMMEDIATE ACTIONS
/
U)' DETAILS' EE
-2.1 Determine source of flooding.
\\'
'm 1
(-)s
'w.
AP-1050 REV 00 PAGE 3 of 7 FLOOD 1
l l
l j.
I
'. A 4
I
{~
l}
9 BLANK PAGE
~
w AP-1050 REV 00 PAGE 4 of 7 FLOOD
d j
)
3.0 FOLLOW-UP ACTIONS ACTIONS J
DETAILS j
'3.1'
-E source of flooding can Trip applicable pumps.
'q be determined, IREN stop flooding.
6NQ GO TO Step 3.5 of this procedure.
Note i
RWP-2B control switch must be held in STOP position.until the DC control power switch in 4160V ES Bus 3B Unit 9 is turned off.
E9.12
.i Securing RW will. cause elevated temperatures of SW cooled components.
3.2
'E source of flooding can NOT o
Stop the following pumps:
be determined, AND is in the RWP-1 Auxiliary Building,.
RWP-2A IBER trip the reactor RWP '3 i
AND stop all' Raw Water pumps.
RWP-3A
.O RWP-3B o
CONCURRENTLY PERFORM AP-580, Reactor Trip.
3.3-E source of flooding can NOT o
Stop the following pumps:
be determined, AND is in the CWP-1A Turbine Building, CWP-1B IULN trip the reactor CWP-1C AND stop all Circ Water pumps.
CWP-ID o
CONCURRENTLY PERFORM AP-580, Reactor Trip.
3.4 E all Circ Water pumps' are o
Depress EFW Actuate
- tripped, pushbuttons for both A and B IEEH actuate EFIC channels.
AN_D stop all FW pumps.
o Trip both MFWPs and MFBPs.
o CONCURRENTLY PERFORM AP-450, Emergency Feedwater Actuation.
.AP-1050 REV 00 PAGE 5 of 7 FLOOD
7 r'
I j:
Q
~
4 l
1 1
u BLANK PAGE fs,
(
4 AP-1050 REV 00 PAGE 6 of 7 FLOOD
(
l l
3.0 FOLLOW-UP ACTIONS o '.
l
,r%
ACTIONS 1 ') DETAILS 3.5 Notify SOTA of plant conditions.
l 3.6 Determine equipment availability Flooded equipment should not be in affected area (s).
operated.
3.7 Re-start Raw Water and Cire Water pumps necessary for plant cooling which are known to have intact system piping and components.
3.8 Exit this procedure.
If plant conditions require
- cooldown, THEij GO TO OP-209, Plant Cooldown.
(h
-O
~
l
,e-AP-1050 REV 00 PAGE 7 of 7 FLOOD
_ _ _ _ _ _ _ - - _.