Confirms 890314 Telcon Re Enforcement Conference to Be Conducted on 890322 to Discuss Circumstances Re Misalignment of RHR Sys Valves Occurring During 890309 Check Valve Leakage Testing.Proposed Meeting Agenda Encl
ML20248D912
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/24/1989
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 8904120079
Download: ML20248D912 (3)


Text

_,-,

  • ' l n, u

n L.3

) h-MAR 2 4 1989 t

c q.

Docket No. 50-425 License No.-NPF-79.

Georgia Power Company j

ATTN: Mr. W. G. Hairston,~III Senior Vice President -

i-

. Nuclear. Operations P. 0. Box 1295 Birmingham, AL 35201 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING - V0GTLE ENFORCEMENT CONFERENCE

, This confirms the-telephone conversation between Mr. C. K. McCoy of your staff and Mr. A. R. Herdt.- of my staff on March 14, 1989, cor.cerning an Enforcement Conference to be conducted in the NRC Region II Office at 9:00 a.m. on t

March 22,1989.. This meeting is being held at our request' to discuss the circumstances concerning the misalignment' of residual heat removal system valves that occurred on March 9,1989 during check valve leakage testing. The details ' of this event will be discussed in this month's resident inspector report 425/89-12. A proposed meeting agenda is enclosed.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, 6

Stewart D. Ebneter Regional. Administrator

Enclosure:

Proposed Meeting Agenda cc w/ enc 1:

R. P. Mcdonald, Executive Vice President, Nuclear Operations P. D. Rice, Vice President, Project Director

)

C. W. Hayes, Vogtle Quality l

Assuro we Manager

, Jr., General Manager, G. Bo A '

Nuclear. s perations (cc w/ enc 1 cont'd - See page 2) 89043 324

'b OCY hhony zevr,

--___-_-_1

__v,-

.i y ' 3_

-y

. }.-

c7 Georgia Power Company.

_5

-MAR 2 4 1989 h

J. P.1Kane, Manager Licensing
cc w/ encl
and Engineering-J.'A. Bailey, Project Licensing Manager 18..W. Churchill, Esq. :Shaw, Pittman, Potts'and'Trowbridge D. Kirkland, III,' Counsel,

.0ffice of the Consumer's Utility-Council-D. Feig, Georgians Against Nuclear' Energy -

~ '

State of Georgia bec w/ encl:

~

E. Reis, OGC

J. Hopkins,: NRR LM. Sinkule, RII.

DRS Technical Assistant-NRC: Resident Inspector ~

Document Control' Desk t

i 1 '

'1 l

h lL RII RII RII R

RII R

OW e.,pCPatterson 6MMSinkule AHerdt L yes en ins MErnst 3/s /89 p /u /89 3/u/89 3/M /89 3/,tl /89 3/ /89

Ic

!. = ;,.4 6-,.

, *.6 J

._y.m<

?,p;

')

ENCLOSURE i

PROPOSED MEETING' AGENDA i

. Georgia Power Company

-1 Vogtle March 22, 1989, 9:00 a.m.'

q

.I 1

ENFORCEMENT CONFERENCE 1

.i I..

Opening Remarks S. D. Ebneter W. G. Hairston II. GPC Discussion of Misaligned Residual Heat GPC Removal Valves During Check Valve Leakage Testing lIII. General Discussion All-IV. Closing Remarks S. D. Ebneter W. G. Hairston 1