ML20248D200
| ML20248D200 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 03/24/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Morris K OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20248D203 | List: |
| References | |
| EA-89-064, EA-89-64, NUDOCS 8904110412 | |
| Download: ML20248D200 (3) | |
See also: IR 05000285/1989010
Text
_ _ _ _ _ _ _ _ - _ _
_ _ _ _ .
. _ _
_
,
i<
MAD ? 4 !999
.,
.
DOCUMENT CONTAINS
In Reply Refer To:
SAFEGUARDS INFORMATI)
Docket:
50-285/89-10
i
EA:
89-64
Omaha Public Power District
ATTN:
Kenneth J. Morris, Division Manager
Nuclear Operations
)
1623 Harney Street
Omaha, Nebraska 68102
l
Gentlemen:
This refers to the inspection conducted by Messrs. R. A. Caldwell and
A. B. Earnest of this office during the period February 27 - March 3,
1989, of activities authorized by NRC Operating License DPR-40 for the
Fort Calhoun Station, and to the discussion of our findings with you and
other members of your staff at the conclusion of the inspection.
i
The inspection reviewed certain areas of your physical security program.
'
-Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspectors.
The areas inspected and the inspection
findings are documented in the enclosed inspection report.
,
During this inspection, it was found that certain of yo'ur activities appeared
'to be in violation of NRC requirements. As discussed in a telephone
]
conversation on March 16, 1989, between Mr. Jerry Everett and Mr. Gary
j
Gates of your staff, we have scheduled an enforcement conference in our
office at 1:00 p.m. on April 12, 1989, to discuss'your understanding of
I
these apparent violations, the reasons fe* their occurrence, and your
j
corrective actions. We will also discus;
>y potential enforcement
j
options available to the NRC,'if appropric.
We have also' examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
i
paragraph 2 of the enclosed report.
The material enclosed herewith contains Safeguards InformationLas defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147.of the Atomic Energy Act of 1954, as amended.
Therefore, the
material with the exception of the report cover page which is'an inspection
j
summary, will n_ot be.placed in the Public Document Room.
]
'
RI 5 S:RPB
C:SE
C:RPB
- D
E
h RA aldewll;ap A
r est
RJEv
t
BMurray
RLBin
t
G
rn
l
3 // /
3# v8
3 &(/89
$
/8
6/p'/89
3 /jQ/89
C:
D:DR
T esterman
LJCal an
} / fly 89
3 /Wf89
ENCI.0SURE CONTAINS
)
g
'
s904110412 890324
SAFEGUARDS INFORMATION
ADOCK05oog5
UPON SEPARATION THIS
5 \\
o
PAGE IS DECONTR01.1.ED
,
OH
c
_
~
>
-1
- e
.-
.c . , .
.
.
Omaha Public Power District-
-2-
~
3
l
Should you have any questions concerning this inspection, we'will be pleased.to
discuss them with you,
i
l
Sincerely,
.
1
L. J. Callan, Director
l
Division of Reactor Projects
-j
Enclosure:
i
Appendix - NRC Inspection Report
50-285/89-10
y
cc w/ summary page only:
.
Fort'Calhoun Station
i
ATTN:
W. G. Gates,. Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
,
Harry H. Voigt, Esq.
,
LeBoeuf, Lamb, Leiby & MacRae
!
1333 New Hampshire Avenue, NW
Washington, D.C.
20036
Nebraska Radiation Control Program Director
bcc copy of enti're report:
RIV Security File
P. A.'Starcher, RSGB/NRR
R. D. Martin, RA
i
l
R. L. Bangart, DRSS
l
B. Beach
i
Chief, RPB
Section Chief, SEPS:RPB
Security Inspector
Resident Inspector
SEPS:RPB File
'
G. F. Sanborn, E0
.
,
D. M. Crutchfield, NRR
.
l
ENCLOSURE CONTAINS
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
,
_..
._._.____.__.___._._..___-._____,__.___________a
...
'
. . . .
..
.,
.
'.j
Omaha Public Power District
-3-
bec. copy lof' letter and inspection summary only w/766:
Lisa Shea, RM/ALF
Section. Chief, DRP/B
RIV' File-
,
MIS-
RSTS Operator
R. E. Hall, DRSS
.
.
.
Project Engineer, DRP/B.
bec' copy of letter and inspection' summary only w/out 766:
DMB IE-04
l
l.
P.: Milano, NRR. Project Manager
1
4
J
<
ENCLOSURE CONTAINS
SAFEGUARDS INFORMATION
UPON SEPARATION THIS -
PAGE IS DECONTROLLED
,
.\\
- _ _ _ _ _
- -.