ML20248C035
| ML20248C035 | |
| Person / Time | |
|---|---|
| Issue date: | 07/25/1989 |
| From: | Meehan B NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Marksberry D, Spessard R NRC, NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD) |
| Shared Package | |
| ML20248C040 | List: |
| References | |
| CON-FIN-L-10369, CON-NRC-26-89-291 NUDOCS 8908090421 | |
| Download: ML20248C035 (1) | |
Text
3
.O l
CONTRACT NUMBE R NRC (04M 2ss 4 50.T6.
NRC-26-89-291 1
a OlVISION OF CONTRACTS MODIFICATION NUMBER U.S. NUCLE AR REGULATORY CGMMISSION ONEw
)O)taOOtrtCATION
-l five (5)
WASHINGTON, D.C. 20555 OTH E R (Specifvl NOTIFICATION OF CONTRACT EXECUTION CONTRACT DASED ON:
To:
R. Lee Spessard, Director AuTHOn ZATION NUMBER (Titic]
AED-89-291 Division of Operational Assessment, AE0D nATE
'O'8* a" "'
5/2/89 & 6/2'8/89
'1 CONTRACT CHANGES PER THIS ACTION l
_ '- 5 A
k n,r I Al. 2 5 topo I
l rnou: h O M M (
i 1
fo,,,,
Extend period of performance,
)
Barbara Mghan. trator increase ceiling, provide
-j ontract minis incremen'tal funding.
4 I
Contract Administration Branch j
l Division of Contracts & Property Management, A0M I
CONTR ACTOR (Name E. Location /
EXECUTION DATE Science Applications International Corporation 1710 Goodridge Drive TYPE OF CONTRACT PO Box 1303 McLean.VA 22102 CPFF PROJECT TaTLE PERIOO OF PE R FORM ANCE l
11/15/88'- 7/10/89 Engineering Design Study for the New NRC eniNCirAt NvEsTicAToR Operations Center NRC AuTHORIZEO REPRESENTATIVE Z
Don Marksberfy, X24156 l
l nLR NU ABCft FIN NUMBER 31X0200.829 982-19-01-03-0 L10369 NEW NnC FUNOS S 3.029.00 ruNomc TOTAL FY 63 FUNDING s92,436.00 i
TOI Al NnC OBUG ATIONS 595,465.00 cO.<c au : n r rRo:s. n t y ATTAc.mtutist 8908090421 890725 Modification 5 1 COE PDR CONTR con s r- -ci noCour nT.
\\\\
NRC-26-e9-293 ppC unc rour ns
}
(10 76