Responds to Generic Ltr 89-08, Erosion/Corrosion Induced Pipe Wall Thinning. Util Has No Plans for Continuing Erosion/Corrosion Insps After End of Plant Operation on 900630
ML20248B776
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/21/1989
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-08, GL-89-8, P-89281, TAC-73418, NUDOCS 8908090328
Download: ML20248B776 (3)


Text

-

L.

y p

y Public Service'

?'a', # i.,..

P.O. Box 840 Denver co 80201- 0840 July 21, 1989 Fort St. Vrain l'

-Unit No. 1 A. Clegg Crawford P-89281

{ic*gi eg l,

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 Docket No. 50-267

SUBJECT:

Generic Letter 89-08 Erosion / Corrosion Induced Pipe Wall Thinning

REFERENCE:

NRC letter, Partlow to Licensees, dated May 2, 1989 (G-89179), Generic Letter 89-08 Gentlemen:

Public Service Company of Colorado (PSC) herein provides the response requested by Generic Letter 89-08, " Erosion / Corrosion Induced Pipe Wall Thinning", for Fort St. Vrain (FSV).

The program which presently addresses erosion / corrosion (E/C) within the single-phase systems at FSV consists primarily of Engineering Evaluation EE-ISI-002 which elaborates on how, what, and when to inspect and it complies with the intent of the NUMARC guidelines as provided in NUREG-1344.

This program utilizes the Regulatory Commitment Log for ensuring that the schedule for annual compenent reinspection is adhered to. The next schedulea date for reinspection of components associated with single-phase E/C is 12/1/89 and exists as Regulatory Commitment Log Item CL-1842B. The actual work is to be performed under Station Service Request (SSR) 89503522.

The program which presently addresses E/C within twc-phase systems consists 'primarily of Engineering Evaluation EE-ISI-001 which elaborates on how, what, and when to inspect and Non-Conformance Reports86-424,

_86-425 and 87-485 which provide additional information on what and when to inspect. The Regulatory Commitment Log is again utilized to ensure adherence to the schedule for annual component reinspection. The next scheduled date for reinspection of the components associated with two-phase E/C is also 12/1/89 and exists as Regulatory Commitment Log Items CL-1840C and CL-18410.

This work will be perfcrmed under SSR 89503523 and SSR 89503524.

T dk 8908090328 890721 h

PDR ADOCK 05000267 I

P

-PDC

P-89281 Page 2 July 21, 1989 Presently, FSV is scheduled for ending nuclear operation no later than June 30, 1990. Due to the operating parameters of the systems that will be in service after this time, E/C does not appear to be a significant concern. Therefore, there is no plan for continuing E/C inspections after the end of operation.

PSC feels that adequate procedural and administrative controls exist to ensure continued implementation of the E/C monitoring program during nuclear operations of FSV.

This program is adequate for detection of significant E/C induced piping and component degradation that may compromise the structural integrity of a system.

If there are any question regarding the information provided in this letter, please call Mr. M. H. Holmes at (303) 480-6960.

Sincerely, A. Clegg Crawford Vice President Nuclear Operations ACC/RLT:jlg cc:

Pegional Administrator, Region IV ATTN: Mr. T. F. Westerman, Chief Projects, Section B Mr. Robert Farrell Senior Resident Inspector Fort St. Vrain l

l l

; s.

8 I

i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

)

l

~

In the Matter

)

).

Public Service Company of. Colorado

)

Docket'No. 50-267 Fort.St. Vrain Unit.No. 1

)

1 AFFIDAVIT A.

Clegg Crawford,.being first duly sworn, deposes and says:

That he is Vice President, Nuclear Operations, of Public Service Company. of Colorado, the Licensee herein, that he has read the information presented in the attached letter and knows the contents thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

Y

~

A. Clegg Crawford '

Vice President Nuclear Operations i.

STATE OF COLORADO

)

)

. COUNTY OF DENVER

)

l Subscribe and sworn to before me, a Notary Public or, this 21st day of July

, 1989.