ML20248B430
| ML20248B430 | |
| Person / Time | |
|---|---|
| Site: | 07000036 |
| Issue date: | 07/28/1989 |
| From: | Rouse L NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Rode J ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| Shared Package | |
| ML20248B435 | List: |
| References | |
| NUDOCS 8908090234 | |
| Download: ML20248B430 (2) | |
Text
,
e 7
f,.
+
JUL 2 e gag.
Dock'et No '70-36 License No. SNH-33 Amendment No. 13 Combustion Engineering, Inc.-
~
ATTN: Mr. J. A. Rode, Plant Manager
. Hematite Fuel Manufacturing 1000 Prospect Hill Road Windsor, CT- 06095-0500 Gentlemen:
In accordance with the amendment application dated March 22, 1989, and' pursuant.
i to Title' 10 Code of Federal Regulations, Part 70, Materials License No. SNM-33:
'is hereby amended.to authorize the startup and testing of the new pellet production lines with depleted uranium and storage of licensed material;in',
Building 256-2. Accordingly, Condition 9 is revised to include the date of March 22, 1989.
All other conditions of the license shall remain the same.
. Revised License No. SNM-33 incorporating Amendment No. 13 and our Safety Evaluation Report are enclosed.
This amendment is issued following preparation of an Environmental Assessment related to the proposed action. Based on this assessment, a Finding of No Significant: Impact has been arepared and approved pursuant to 10 CFR Part 51.
Copies of this Finding, whic) was published in the Federal Register on May 24, 1989, and the supporting Environmental Assessment were forwarded to you on May 18, 1989.
4 4
890B090234 890728 6{
PDR ADOCK 0700 c
I
)( >S t 1
r-1 b
l.
.l
}
JUL 2 61389
')
i Mr. J.'A. Rode ~Please note that this amendment only authorizes the startup and testing phase with depleted uranium.
Your amendment application dated May 1,1989,
]
i requesting authorization for full scale production with enriched uranium has
.not been approved end is under consideration by NRC staff.
j FOR TI,lE NUCLEAR REGULATORY COMMISSION ongmisiredBr Leland C. Rouse, Chief fuel Cycle Safety Branch Division of Industrial and Medical Nuclear Safety, NMSS
Enclosures:
1.
Revised License No. SNM.33 2.
Safety' Evaluation Report cc w/ encis:
Mr. A. E. Scherer, Director Mr. C. B. Brinkman, Manager Nuclear Licensing Washington Nuclear Operations Dr. P. L. McGill, Vice President Mr. H. E. Eskridge, Supervisor Nuclear Fuel Licensing.. Safety and Accountability Distribution,w/ encl.
.. ~.. _.
LDocketsNo.270-36 RPDR1
'JtciFile[Centemy NMSS R/F IMUF R/F IMSB R/F VLTharpe.
DAMcCaughey
. Region III-GFrance, RIII DWeiss, LFMB DKasun, SGDB t
RGramann, SGIB SHO GHBidinger MHorn
.A 0FC : IMUF :f.D.. S., c.<...........IMUF :y.............../1TM.....I MS&t1.(;$,(q........
IMUF:
NAME:DAMcCaughe :mh:
VLTharpe:
GHBidinger:
LCRouse:
OFFICIAL RECORD COPY L
i