ML20248A738
| ML20248A738 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/22/1998 |
| From: | Wiggins J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bowling M NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20248A743 | List: |
| References | |
| 50-423-98-81, EA-98-206, NUDOCS 9806010032 | |
| Download: ML20248A738 (4) | |
See also: IR 05000423/1998081
Text
- - - _ _ - _ - _ _ - _ - _ - _ _
-
- _ _ _ _ - - _ _ _ - . .__
._ _ _ _ - - _
__
_ _ _ _
'
.
1
. ..;r
...
r
May 22, 1998
EA 98-208 -
r
. Mr. M. L. Bowling, Recovery Officer - Technical Services
C/o Ms. Patricia Loftus, Director - Regulatory
Affairs for Millstone Station
' NORTHEAST NUCLEAR ENERGY COMPANY
PO Box 128
Waterford, CT 06385
SUBJECT:
NRC INSPECTION REPORT NO. 50-423/98-81, NOTICE OF VIOLATION,
AND EXERCISE OF ENFORCEMENT DISCRETION
Dear Mr. Bowling:
This refers to the inspection conducted on March 2 - 31,1998, at the Millstone Unit 3
n
facility in Waterford, Connecticut. The purpose of the inspection was to evaluate the
readiness of the Fire Protection Program to support restart of Unit 3. The enclosed report
.
presents the results of this inspection. The results of the inspection were discussed with
,
'
members of your staff at a meeting conducted March 6,1998, at the site, and during a
l
conference call conducted March 30,1998,
l
'
Overall, we noted that significant improvements have been made to your fire protection
program. We noted improvements in your fire drill critiques, program controls, surveillance
testing of safe shutdown equipment, and implementation of licensing commitments. On
i
!
the basis of the improvements noted, we are closing Significant issues List item 42, Fire
Protection Program for Unit 3.
Notwithstanding your marked improvement, the NRC has determined that violations of NRC
)
requirements occurred. These violations are cited in the enclosed Notice of Violation
/
j
(Notice) and the circumstances surrounding them are described in detail in the subject
}
inspection report. T.he violations are of concern because the fire barrier degradation was
'
NRC identified, and the corrective actions for your identification of the multiple high
impedance fault susceptibility were judged to be inadequate.
The enclosed report also describes six issues which involved violations of NRC
requirements that could be considered for escalated enforcement action. After
consultation with the Director, Office of Enforcement, and the Director, Special Projects
Office, Office of Nuclear Reactor Regulation, I have been authorized to exercise
enforcement discretion pursuant to Section Vll.B.2 of the NRC's Enforcement Policy, and
not issue a formal Not!ce of Violation or propose any civil penalties because your facility
has been in an extended shutdown and the NRC has taken significant enforcement action
for the performance issues that led to the shutdown. The decision to exercise discretion -
was made considering the violations: 1) relating to past performance inadequacies which
. predate the current extended shutdown,2) were identified by you as part of your
'
'
9906010032 990522 ,
DR
ADOCK 0
4g
,
o
.
- _ _ _ - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ -
.
_ _ - _ _ _ _ _ _
. . _ _ _ _ _ - _ _ _ _ _ _ = _ _ _ _ _
.
,.
,
M. Bowling
2
comprehensive performance improvement programs,3) would not have been characterized
at a severity level higher than Severity Level ll, and 4) were not willful violations. Since
the restart of Millstone Unit 3 reactor requires NRC concurrence, the conditions of Section
Vll.B.2 of the Enforcement Policy are met.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,-
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
' n accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
i
and its enclosures will be placed in the NRC Public Document Room (PDR).
If you have any questions, please call me at (610) 337-5376.
Sincerely,-
ORIGINAL SIGNED BY:
James T. Wiggins, Director
Division of Reactor Safety
Docket No. 50-423
Enclosures:
NRC Inspection Report 50-423/98-81
Millstone Unit 3 - Fire Protection Program Assessments
l
l
I-
,
.'
. _ .
. _ _ - - _ _ _ - _ _ _ _ _ _ _ _ _ - -
.-
_
.
.
M. Bowling
3
cc w/ encl:
B. Kenyon, President and Chief Executive Officer - Nuclear Group
l
M. H. Brothers, Vice President - Operations
J. McElwain, Unit 1 Recovery Officer
J. Streeter, Recovery Officer - Nuclear Oversight
G. D. Hicks, Unit Director - Millstone Unit 3
J. A. Price, Unit Director - Millstone Unit 2
D. Amerine, Vice President - Human Services
E. Harkness, Director, Unit 1 Operations
F. C. Rothen, Vice President, Work Services
J. Cantrell, Director - Nuclear Training
L. M. Cuoco, Esquire
J. R. Egan, Esquire
V. Juliano, Waterford Library
J. Buckingham, Department of Public Utility Control
S. B. Comley, We The People
State of Connecticut SLO Designee
D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN
J. M. Block, Attorney, CAN
S. P. Luxton, Citizens Regulatory Commission (CRC)
Representative T. Concannon
E. Woollacott, Co-Chairman, NEAC
J. Althouse, Manager - Nuclear Training Assessment Group
S. J. Sherman, Audits and Evaluation
- _ . _ .
..
.
M. Bowling
4
Distribution w/ encl:
Region 1 Docket Room (with som of concurrences)
Nuclear Safety Information Center (NSIC)
PUBLIC
FILE CENTER, NRR (with Oriainal concurrences)-
SPO Secretarial File, Region i
NRC Resident inspector
J. Wiggins, DRS
L. Nicholson, DRS
OE (2)
H. Miller, RA/W. Axelson, DRA
B. Jones, PIMB/ DISP
W. Lanning, Deputy Director of Inspections, SPO, RI
W. Travers, Director, SPO, NRR
C. Miskey, DRS
. Distribution w/enci (VIA E-MAIL):
R. Zimmerman, ADPR, NRR
F. Davis, OGC
A. Nicosia, OGC
J. Lieberman, OE (OEMAIL)
D. Holody, EO, Rl
M. Callahan, OCA
R. Correia, NRR
B. McCabe, OEDO
E. Imbro, Deputy Director of ICAVP Oversight, SPO, NRR
<
P. McKee, Deputy Director of Licensing, SPO, NRR
H. Pastis, SPO, NRR (Employee Concerns Only)
S. Reynolds, Chief, ICAVP Oversight, SPO, NRR
D. Screnci, PAO
Inspection Program Branch (IPAS)
DOCDESK
DOCUMENT NAME: G:\\EEB\\FUHRMEIS\\ MIL 3988A. INS
Ta receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure
"E" = Copy with attachment /enolosure
"N" =
No copy
MuwgI
OFFICE
Rl/DRS
l@ Rl/DRS
[i- Pl/DRP
l C,
l hJ M .,{Ml 6
NAME
RFuhrmeister P WRulandt,)//[(
JDurr
p
JWigginslv
T.L uk A
DATE
04/17/98
05//3/98
05//f/98
05/7V98
05/f2/98
'
'
i
OFFICIAL RECORD COPY
W/
es kMg6
5