Forwards SER Accepting Resolution of Generic Ltr 83-28,Item 4.5.3, Reactor Trip Sys Functional Testing & Technical Evaluation Rept EGG-NTA-8341
ML20248A080
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/31/1989
From: Boyle M
Office of Nuclear Reactor Regulation
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20248A084 List:
References
GL-83-28, TAC-53999, NUDOCS 8906080054
Download: ML20248A080 (4)


Text

_y-. _ .. _ - _ _ _ _ _

Y -'

May 31, 1989 -

s.

Docket No. 50-245 DISTRIBUTION gDocket me BGrimes Mr. Edward J. Mroczka NRC T L3Eal~PDRs ACRS(10)

Senior Vice President Plant File SNewberry (7E12) '

Huclear Engineering and Operations SVarga Northeast Nuclear Energy Company BBoger P.O. Box 270 SNorris Hartford, Connecticut 06144-0270 MBoyle OGC j

Dear Mr. Mroczka:

EJordan 1

SUBJECT:

GENERIC LETTER 83-28, ITEM 4.5.3 - MILLSTONE NUCLEAR POWER STATION, UNIT NO. 1, (TAC NO. 53999) l The staff has completed its review of Salem ATWS Item 4.5.3, Reactor Trip  ;

System Functional Testing, for Millstone Unit 1. The staff's review, j documented in the enclosed safety evaluation and technical evaluation reports,  :

finds this item to be acceptably resolved. This completes our review under TAC 53999.  ;

Sincerely, l

/s/

i Michael L. Boyle, Project Manager Project Directorate I-4 Division of Reactor Projects I/II  ;

Office of Nuclear Reactor Regulation I

Enclosures:

As stated {

cc w/ enclosures:

See next page

[TACN0.53999]

PM:PDI-4h P( 4.

LA:PD,isI SNd M- MBoyle:cb JSt 5/JV89 5/3 /89 5/3[/8 S

y(h 8906080054 890531 PDR ADOCK 05000245 P PDC t

,, ,. May 31, 1989 hocketNo.50-245 DISTRIBUTION Docket File BGrimes Mr. Edward J. Mroczka NRC & Local PDRs ACRS(10)

Senior Vice President Plant' File SNewberry (7EI2)

Nuclear Engineering and Operations SVarga Northeast. Nuclear Energy Company BBoger

,P.O. Box 270 SNorris Hartford, Connecticut 06144-0270 MBoyle -

OGC

Dear Mr. Mroczka:

EJordan

SUBJECT:

GENERIC LETTER 83-28, ITEM 4.5.3 - MILLSTONE MllCLEAR POWER STATION, UNIT NO. 1 (TAC NO. 53999)

The staff has completed its review of Salem ATWS Item 4.5.3, Reactor Trip System Functional Testing, for Millstone Unit 1. The staff's review, documented in the enclosed safety evaluation and technical evaluation reports, finds this item to be acceptably resolved. This completes our review'under TAC 53999.

Sincerely,

/s/

Michael L. Boyle, Project Manager Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosures:

As stated cc w/ enclosures:

See next page

[TACNO.53999]

m LA:PD j!-* PM:PDI-4 PD:#DIw4.

SNdis MBoyle:cb JSt'o k '

5/jV89 . 5/5 /89 5/3[/89 O

h '

UNITED STATES y

~

g NUCLEAR REGULATORY COMMISSION 5 1 j CASHINGTON, D. C. 20555

/ May 31, 1989

. Docket No. 50-245 Mr. Edward J. Mroczka .

Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy. Company P.O. Box 270 Hartford, Connecticut 06144-0270

Dear Mr. Mroczka:

SUBJECT:

GENERIC LETTER 83-28, ITER 4.5.3 - MILLSTONE NUCLEAR POWER STATION, UNIT NO. 1, (TAC NO. 53999)

The staff has completed its review of Salem ATWS Item 4.5.3, Reactor. Trip System Functional Testing, for Millstone Unit 1. The staff's review, documented in the enclosed safety evaluation and technical evaluation reports,

finds this item to be acceptably resolved. This completes our review unoer TAC 53999. .

Sincerely, l

ichael L. B e, Project Manager Project Directorate I-4 Division of Reactor Pro.4ects I/II Office of Nuclear Reactor Regulation

Enclosures:

As stated cc w/ enclosures:

See.next page l

e g

y. , ,

4 Mr. Edward J. Mroczka- Millstone Nuclear Power Station. '

-Northeast Nuclear Energy Company Unit No. 1 Lec:.

Gerald. Garfield, Esquire  ; R. M. Kacich, . Manager' (Day, Berry and Howard Generation Facilities Licensing

' Counselors at Law' Northeast Utilities Service Company .

City Place .

. . Post Office Box 270 L LHartford, Connecticut 06103-3499 Hartford, Connecticut. 061al-0270 L

l W. D. Romberg :Vice President- D. 0. Nordquist.

Nuclear Operations- Manager of: Quality Assurance N cNortheast Utilities Service Company. Northeast Nuclear Energy Company 4 Post Office Box 270 Post Office Box 270-Hartford, Connecticut 06141-0270 Hartford,-Connecticut 06141-0270:

Kevin McCarthy, Director Regional _ Administrator:

Radiation Control Unit Region I

..- Department of Environmental Protection .U. S. Nuclear Regulatory Consission

' State Office Building-475-Allendale Road Hartford, Connecticut 06106 King of Prussia,' Pennsylvania 19406 Bradford S. Chase, Under Secretary First Selectmen -

Energy Division Town of Waterford

~ Office of Policy..and Management- ~ Hall of. Records 80' Washington Street 200 Boston Post Road Hartford, Connecticut - 06106 . Waterford, Connecticut' 06385 s

.S. E. Scace, Station Superintendent W.~ J. Raymond, Resident Inspector

- Millstone Nuclear Power. Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U. S.' Nuclear Regulatory Commission Post Office Box 128- . Post Office Box 811 iWaterford, Connecticut 06385 Niantic, Connecticut 06357 J. P. Stetz, Unit Superintendent Millstone Unit No. 1 Northeast Nuclear Energy Company Post Office Box 128 Waterford, Connecticut 06385 4

I m

J

. .m

- - _ . - - - - - - - - _ _ _ _ _ _