Forwards Insp Rept 50-458/89-11 on 890315-0430 & Notice of Violation
ML20247Q959
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/31/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20247Q966 List:
References
NUDOCS 8906070095
Download: ML20247Q959 (2)


See also: IR 05000458/1989011

Text

_ _ _

_ _ _ - _ _ _ - _ _ _ _ _ _ - _ - _ _ - _ _ _ _ _ _ _ _ - - _ - _ _ _ _

____

_ - _ _ -

,1

. -

,.

,

,-.

.

,

.

MAY 31 SS

-

-

.In Reply. Refer To:

Docket: 50-458/89-11

>

Gulf States Utilities-

ATTN: Mr. James C. Deddens

Senior Vice President (RBNG)

P.O. Box 220

St. Francisv111e, Louisiana 70775

4

I

Gentlemen:

This refers to the inspection conducted by Messrs. E. J. Ford and W. B. Jones

'

of this office during the period. March 15 through April 30, 1989, of activities

-

authorized by NRC Operating: License NPF-47 for River Bend' Station, and to the

discussion of our findings with>you and other members of your staff at the

conclusion of the inspection.

Areas' examined.during the inspection included followup of plant events.

operational safety verification.. monthly maintenance and surveillance

-observations, and refueling activities. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the NRC inspectors.

During this . inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph' 8 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

4

R

I

C RP

D

es

G

able

JCqllan

{

/E

7,f/70/89

T o/89

p/)\\/89

-

h

r/w/89

.'

8906070o95 890531

t(

{DR

ADOCK0500g8

_

--

--_-___-__-A

._

.

,

.

'

,

i

.

Gulf States Utilities

-2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Wani Signed By

2. 7~ Geker

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

1.

Appendix A - Notice of Violation

2.

Appendix B - Inspection Report

50-458/89-11

cc w/ enclosure:

Gulf States Utilities

ATTN:

J. E. Booker, Manager-

River Bend Oversight

P.O. Box 2951

Beaumont, Texas 77704

Gulf States Utilities

ATTN:

Les England, Director

Nuclear Licensing - RBNG

P.O. Box 220

St. Francisville, Louisiana 70775

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bcc distrib. by RIV:

  • DRP
  • RRI
  • R. D. Martin, RA
  • Section Chief (DRP/C)

Lisa Shea, RM/ALF

  • MIS System
  • RPB-DRSS
  • RSTS Operator
  • Project Engineer, DRP/C
  • RIV File
  • W. Paulson, NRR Project Manager (MS: 13-D-18)