Text
_
____
"
'
'
" ' '
APR
31989
-
q,,
..
.
'~
In Reply Refer,To:
Dockets: 50-313/89-04
50-368/89-04
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear-
Operations
P.O. Box 551
Little Rock. Arkansas 72203
Gentlemen:
This refers to the onsite inspection conducted' by . Messrs. P. C.- Wagner and '
~
R. V. Azua'of this office during the period February 6-17, 1989, and the
inoffice review conducted during the period February 20-24, 1989, of activities
authorized by NRC Operating Licenses DRP-51 and NPF-6 for Arkansas Nuclear One,'
Units 1 and 2.
Discussions of our findings were held with Mr. S. Quennoz and
other members of your staff, during and at the conclusion of the onsite
inspection, and in subsequent phone conversations during and following the
inoffice review.
Areas examined during the inspection included-the actions-taken in response to
the equipment malfunctions following the-reactor' trip on January 20, 1989, and ..
actions related to diesel fuel ofl.. Within these areas, the inspection consisted -
of selective examination of procedures.and representative records, interviews
with personnel, and observations by the NRC inspectors. The inspection
findings are documented in the enclosed inspection. report.
During this inspection, it was found that certain of your activities may be in
violation of NRC requirements. A Notice of Violation has not been enclosed
with this letter, but the details of the findings'are discussed in
paragraph 2.f of this report. We will schedule an enforcement conference in
our office at a later date to discuss your understanding of this apparent
violation, the reasons for occurrence, and your corrective ' actions. The time,
date, and agenda for this meeting will be promulgated separately.
We remain concerned about the controls utilized when modifications are
implemented.on the Integrated Control System (ICS).
Because of the importance
of limiting challenges to the plant's emergency systems, great care should be
.
exercised to ensure the proper operation of<the ICS. Therefore, we request
I
that you inform us, within 30 days of.your receipt of, this letter, of any
- /
corrective actions you will implement to preclude future wiring errors or
other problems.within the ICS similar. to'those discussed in paragraph 2.d of
.
this report.
o
,
RIV:RI*
RI*
C:PSS*
D: DRS '* -
D:DR
E0M
PWagner:lm
RAzua
TStetka
JLMilhoan
LJCal an
GShni orn
/ /89
/ /89
/ L/89
/ /89
/p/89
Q/3/89 -
'
- previously concurred
8904070214 9o0403
'
l
ADOOM 05000313
d.
"
Q
y
l
(.
,
{'
j
.
- _ - _ _ _ _ _ _ _ _ _ _ _ - _ - _
.-
,
,
- '
,,
.
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By
L 1. Callan
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
w/ Attachment
50-313/89-04
50-368/89-04
cc w/ enclosure:
Arkansas Nuclear One
ATTN:
J. M. Levine. Executive
Director, Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
q
- RRI
- R. D. Martin, RA
- RPB-DRSS
- SectionChief(DRP/A)
Lisa Shea, RM/ALF
- RIV File
l
- DRP
- MIS System
i
- RSTS Operator
- Project Engineer, DRP/A
'
- DRS
- R.
Azua
- C.Harbuck.NRRProjectManager(MS:
13-D-18)
- C. Poslusny, NRR Project Manager (MS:
13-D-18)
- P. Wagner
- T. Stetka
G. F. Sanborn, E0
NRR/P0EB
- w/766
i
1
I
i
1