Responds to Violation Noted in Insp Rept 50-219/89-04. Corrective Action:Technical Functions & Plant Operations Personnel Briefed & Reinstructed in Proper Application of Appropriate Procedures
ML20247Q581
Person / Time
Site: Oyster Creek
Issue date: 05/26/1989
From: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8906060470
Download: ML20247Q581 (2)


Text

-

.v.

GPU Nuclear Corporation Nuclear m'1;=r388 Forked River,New Jersey 08731-0388 609 971-4000 Writers Direct Dial Number:

May 26, 1989 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Mail Station Pl-137 Washington, DC 20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Response to Inspection Report 89-04 Notice of Violation In accordance with 10CFR 2.201, the enclosure provides GPUN's response to the violation identified in the subject Inspection Report.

Should you require any additional information, please contact Brenda DeMerchant, Oyster Creek Licensing Engineer at (609)971-4642.

Very truly yours, E. E. Fitz trick Vice President and Director Oyster Creek EEF/BD/dmd (0755A:1)

Enclosure cc: Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 omo E8' Mr. Alexander W. Dromerick, Project Manager

@f, U.S. Nuclear Regulatory Commission 20 Division of Reactor Proje::ts I/II l

L.

ox Washington, DC 20555 I

S8 oo NRC Resident Inspector

[

Oyster Creek Nuclear Generating Station

(

CO Q G

' \\

GPU Nuclear Corporation is a subsidiary of the General Public Utikties Corporation

r-

~

ENCL 0SURE VIOLATION Technical Specification 6.8.1 requires that written procedures be established, implemented and maintained that meet or exceed Regulatory Guide 1

1.33, Revision 2.

Regulatory Guide 1.33, Revision 2, endorses ANSI 18.7-1976, Section 5.2.2, which requires that procedures be followed.

Station Procedure 124, " Plant Modification Control", provides the instructions, guidelines and documentation required for the Oyster Creek Division...for control and acceptance for all modifications to the Oyster Creek facility.

Contrary to the above, a modification to the control room IRM range switch was made on January 14, 1989, without the controls and acceptance criteria such as instructions, guidelines and documentation required by Station Procedure 124.

RESPONSE

GPUN coreats with the violation as stated.

The modification was documented on March 3,1989. Technical Functions and Plant Operations personnel have been briefed and reinstructed in the proper application of the appropriate procedures and in the importance of recognizing when these procedures apply. This is an isolated instance.

Full compliance was achieved on March 3,1989 when Document Release Form 054478 containing the complete modification package was issued to ensure record retention.