'. ~ '~5 DPERA11NG DATA RLPOR1 DOCKET NO.

50-327 DATE 9-1-89 COMPLE1ED BY T. J. Hollomon TELEPHONE (615) 843-7528 OPERATING $TATUS INotes l

1. ' Unit Name:

Seouovah Unit One l'

l 9

'2.

Reporting Period:

Juiv 1989 l

l

- 3.

l.icensed 1hennal Power (Mdt): 3411.0 l

l' 4.

Nameplate Rating (Gross Mde): 1220.6 l

[

5.

Design Electrical Rating (Net Mde): 1148.0 l

l 6.

Maximum Dependable Capacity (Gross MWe): 1183.0 l

l 7.

Maximum Dependable Capacity (Net MWe); 1148.0 l

l

8. _ If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A i

9.

Power Level To Idhich Restricted, If Any (Nct PWe):

N/A

10. Reasons For Restrictions. If Any:

N/A This Month Yr-to-Date Cumulative

-11. Hours in Reporting Period 744.0 5.087.0 70.872.0 12.' Nudier of Hours Reactor Was Critical 744.0 5.038.0 29.863.0

13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0

- 14. Hours Generator On-Line 744.0 5.012.7 29.076.5

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0_

- 16. Cross Therns1 Energy Generated (MI) 2.522.672 16.779.193 94.356.130

17. Cross Electrical Energy Generated (MI) 864.540 5.770.130
  • 31.905.406 *
18. Het Electrical Energy Generated ( M 1) 834.517 5.571.844
  • 30.493.272 *
19. Unit Service Factor 100.0 98.5
20. Unit Availability Factor 100.0 98.5 41.0 41.0
21. Unit Capacity Factor (using MDC Net) 97.7 *-

95.4*

37.5

22. Unit Capacity Factor (Using DER Net) 97.7
  • 95.4*

37.5

23. Unit Forced Outage Rate 0.0 1.5 52.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

An ice condenser outage is scheduled in October 1989. with a duration of 12 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

  • Values' corrected from the July'1989 Monthly Operating Report.