ML20247P062
| ML20247P062 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/26/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dewease J LOUISIANA POWER & LIGHT CO. |
| References | |
| NUDOCS 8906060095 | |
| Download: ML20247P062 (4) | |
See also: IR 05000382/1989005
Text
c
.
_.
_.
_ _
_
_ - _ _ _ _
, T!
?
MAY 2 6;1989
.
.
'In' Reply R$fer To:
-Docket: 50-382/89-05
-
50-382/89-06
Louisiana Power & Light Company
. ATTN:
J. G. Dewease,. Senior Vice President
Nuclear Operations
'317 Baronne Street
New Orleans, Louisiana 70160
-Gentlemen:
This refers;to the Management Meeting conducted at Region IV's request in the-
NRC Region IV office on_May 8, 1989. -This meeting related to activities
authorized by NRC License No. NPF-38 for Waterford Steam Electric Station,-
Unit 3.
The subjects discussed at this meeting are discussed in the enclosed Meeting
Summary with the Attendance List attached.
It is our opinion that this meeting was beneficial and has provided for a
better understanding of the issues of two NRC inspections conducted
February 13-17, and 1-28,1989 (NRC Inspection Reports 50-382/89-05. and
50-382/89-06).
In accordance with Section 2.790.of,the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter
will be placed in the NRC's Public Document Room.
,
.
Should you have any questions concerning this matter, we will be' pleased to
discuss them with you.
Sincerely.
ORIGINAL SIGNED BY:
LJ. CALLAN
L. J. Callan, Director
Division of Reactor Projects
Enclosure:-
Meeting Summary
cc:
Louisiana Power & Light Company
' ATTN:
P,. P. Barkhurst, Vice President
Nuclear Operations
P.O. Box B
Killona, Louisiana 70066
- RIV:DRP/A
- C:DRP/A
D:DRP
'
h
ATHowell;df
DDChamberlain
LJCplan
5/ ./89
5/ /89
5/fy89
i(
'
8906060095 890526 I
DR
ADOCK 05000382
PNUp
_ _____ _ _ _ _ _
__
<
..
Louisiana Power & Light Company
-2-
4
.
Louisiana Power & Light Company
ATTN:
J. R.- McGaha, Jr. , Plant Manager
P.O. Box B
K111ona, Louisiana 70066
,
Louisiana Power & Light Company
ATTN:
R.-- F. Burski, Manager, Nuclear
Safety 8 Regulatory Affairs-
317 Baronne Street
,I
P.O. Box 60340
New Orleans, Louisiana 70160
Louisiana Power & Light Company
ATTN:
L. W. Laughlin, Site
Licensing Support' Supervisor
P.O. Box B-
Killona, Louisiana 70066~
Louisiana Power & Light Company
' ATTN:
G. M. Davis, Manager, Events
Analysis Reporting & Response
P.O. Box B
Killona, Louisiana 70066
Middle South Services
ATTN: Mr. R. T. Lally
P.O. Box 61000.
New Orleans, Louisiana 70161
Louisiana Radiation Control Program Director
bec to DMB (IE45)
bec distrib. by RIV:
RRI
R. D. Martin, RA
SectionChief(DRP/A)
RPB-DRSS
MIS System
Project Engineer (DRP/A)
RSTS Operator
RIV File
D. Wigginton, NRR Project Manager (MS:
13-D-18)
Lisa Shea, RM/ALF
p
-
.
.
.
,
L
MEETING SUMMARY
1
l
'
Licensee:-
Louisiana Power & Light Company
l
Facility:
Arkansas Nuclear One
License No.:
Docket No.:
50-382
Subject:
MANAGEMENTMEETING(NRCINSPECTIONREPORTS 50-382/89-05 AND
50-382/89-06)
On May 8, 1989, representatives of Louisiana Power & Light Company met with
Region IV personnel in Arlington, Texas, to discuss issues identified in two
NRC inspections conducted February 13-17 and 1-28,1989 (50-382/89-05 and
50-382/89-06).
The licensee's presentation addressed the conditions in which ITT Barton
pressure transmitters (Models 363 and 364) are used to detect level in the
containment sump. Additionally, the licensee discussed their understanding of
Technical Specification action statements and surveillance requirements
associated with safety-related equipment / systems when attendant support systems-
are taken out of service for maintenance.
Attachment:
Attendance List
,
~ _ _ . _ _ _ . _ _ _ . _ _ . _
_.
.
.
.
- _ - _ _ - _ _ _ - _
_-___
p
,
<
,.:6.
.
,
. , . . .
-
u+
p
ATTENDANCE LIST
, -
,
l
Attendance at the Louisiana Power & Light Company - NRC Management Meeting on
May 8, 1989,~at the NRC Region IV office:
t
Louisiana Power & Light Company -
^
~J. .G.' Dewease,L Senior Vice President - Nuclear
R. P. Barkhurst : Vice President - Nuclear -
J.lR.:McGaha, Plant Manager
D. Packer, Assistant Plant Manager - Operations and Maintenance
R. F. Burski, Nuclear Safety and Regulatory Affairs Manager '
G. M.-Davis, Event Analysis Manager
'
.D. W.~ Vinci, Maintenance Superintendent
.
,,
NRC Region IV-
R. D. Martin, Regional Administrator
!
L. J. Callan, Director, Division of Reactor Projects (DRP).
J. L. Milhoan, Director, . Division of. Reactor Safety'(DRS)
J. P. Jaudon, Deputy Director, DRS
1
D. D.- Chamberlain, Chief, Project Section A DRP
l
.
A. T. Howell, Project Engineer, Project.Section_A, DRP
j
.T. F. Stetka, Chief Plant Systems Section, DRS
-
W. F. Smith. Senior _ Resident Inspector, Project Section A, DRP
l
T. R. Staker, Resident Inspector,' Project Section A, DRP
.
P. C. Wagner, Reactor Inspector, Plant Systems Section', DRS
- NRC Office of Nuclear Reactor Regulation
l
.:D. Wigginton, Senior Project Manager, Project Directorate IV
j
K. K. Shaw, Senior Mechanical Engineer, EMEB
i
i
i
/
-.__.i__ _ _ . _ _ _ . _ . _ _ . .
_._
_
'