Informs of Completion of Review of Submitting Changes to Site Emergency Plan.Determined That Changes Are Acceptable & Condition S-3 of License SNM-1107 Will Be Updated in Future License Amend to Reflect Changes.Ser Encl
ML20247N756
Person / Time
Site: Westinghouse
Issue date: 05/08/1998
From: Weber M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Goodwin W
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20247N762 List:
References
TAC-L31030, NUDOCS 9805270219
Download: ML20247N756 (3)


Text

,

s

,p u p

4 UNITED STATES l

s j

NUCLEAR REGULATORY COMMISSION

%,..... /, 4 WASHINGTON, D.C. 20066-0001 l

May 8, 1998 Mr. W. L. Goodwin, Manager Regulatory Affairs Westinghouse Electric Corporation Commercial Nuclear Fuel Division l

Drawer R Columbia, South Carolina 29250

SUBJECT:

REVISED SITE EMERGENCY PLAN (TAC NO. L31030)

Dear Mr. Goodwin:

This refers to your letter dated November 6,1997, in which you submitted changes to your Site Emergency Plan (SEP). We have completed our review of the submitted changes, and have determined that these changes do not decrease the effectiveness of your SEP and are within the provisions of 10 CFR 70.32(i). Accordingly, the revisions to your SEP are acceptable and Safety License Condition S-3 of your License SNM-1107 will bo updated in a future license amendment to reflect these changes.

Enclosed is a copy of the SER.

In your April 7,1998, lettar in response to NRC's request for additional information, you

{

stated in Attachment A, item 4, that in the next revision of Emergency Procedure A-04, Revision 2, dated August 25,1997, the examples that were noted to be missing would i

be included. NRC expects this to be completed in a timely manner.

i in addition, as discussed in a May 6,1998, teleconference call between E. Flack of NRC and J. Heath of Westinghouse, Westinghouse agreed to provide annual evacuation training for all plant personnel which addresses: (1) the voice communications system, (2) manual fire alarm pull stations, (3) the criticality siren, (4) flashing blue beacon and message waming panels, (5) evacuation routes, (6) assembly

,; ; u O 1

1 I

b

$0 c

9805270219 980508

[DR ADOCK 07001151 PDR

\\

I i

1 Mr. W. L. Goodwin 2

I area locations, (7) the scan cut and accountability procedure, and (8) employees responsibilities during ernergency situations. Westinghouse also agreed to maintain documentation of this training.

Sincerely, I

l Original signed by:

{

Michael F. Weber, Chief l

Licensing Branch Division of Fuel Cycle Safety j

and Safeguards, NMSS I

Docket 70-1151 License SNM-1107 i

l Distribution: w/ encl. (Control No. 7GOS)(Closed)

Docket 70-1151 PUBLIC ^

NRC File Center -

Region ll l

FCLB R/F FCSS R/F NMSS R/F DSeymour, Ril PMDA&mW,6% [G:\\ west 7032.wpd] OFC FCLB FCLB FCLB FCLB C-FCLB A/ g NAME NNaik CGaskin

  • PShea #

MAdarN8 MWeber[ l DATE 5/s/98 5/ /98 5/ /98 5/8/98 5/#f/98 f $ce f(Edens Co rt c L< tre s1 c c i I i l l J l l l

Mr. W. - L. Goodwin 2 area locations, (7) the scan out and accountability procedure, and (6) ernployees responsibilities during ernergency situations. Westinghouse also agreed to maintain docurnentation of this training. Sincerely, iA Y Michael F. Weber, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-1151 License SNM-1107 i h l l}}