ML20247N665

From kanterella
Jump to navigation Jump to search
Environ Assessment & Finding of No Significant Impact Re Request for Exemption from 10CFR50,App A,GDC-4 Re High Energy Line Breaks.Exemption Needed to Permit Plant Operation Until Next Scheduled Refueling Outage
ML20247N665
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/1989
From: Berkow H
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20247N669 List:
References
NUDOCS 8906050419
Download: ML20247N665 (3)


Text

- __

l*D

/ esp-1.

a:

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION FLORIDA POWER CORPORATION DOCKET NO. 50-302 ENVIRONMENTAL ASSESSMENT AND.

e.:

l '

FINDING OF NO SIGNIFICANT IMPACT n

The U. S. Nuclear Regulatory Commission (the Conmission) is.considering L

issuance of an exemption from the requirements of Appendix-A to 10 CFR Part 50 to the: Florida Power Corporation (the licensee), for the Crystal River Unit 3 Nuclear 'Ge' nerating Plant, located in Crystal. River, Florida.

o ENVIRONMENTAL' ASSESSMENT Identification' n of Proposed Action:

The proposed exemption would allow temporary relief frcm the requirements

= of General Design Criterion-4 (GDC-4) for the Crystal River Unit 3 Nuclear Generating Plant with regard to high energy line breaks.

The Need for the Proposed Action:

The proposed exemption is needed in order to permit plant operation until the end of next scheduled refueling outage (Refuel 7).

Environmental Impacts of the Proposed Action:

The proposed exemption does not involve any measurable environmental impacts during normal operation since plant configuration and operation are not changed. The likelihood of a high energy line break which would affect equip-

' ment required to operate to avoid radiological impact is low. Thus, the proposed E

exemption will not significantly affect the probability or consequences of potential reactor accidents and would' not otherwise affect radiological plant effluents. Consequently, the Connission concludes that there are no significant radiological impacts associated with the proposed exemption.

g6050419g90531 p

ADOCM 050003op ",

PNu

^

1 With regard to potential non-radiological impacts, the proposed exemption involves features located entirely within the restricted area as defined in

~

10 CFR Part 20.

It does not affect non-radiological plant effluents and has no other environmental impact. Therefore, the Commission concludes that there are no significant non-radiological environmental impacts associated with the proposed exemption.

Alternatives to the Proposed Action:

Since the Commission concluded that there are no measurable environmental impacts associated with the proposed exemption, any alternatives with equal or greater environmental impact need not be evaluated. The principal alternative to the exemption would be to require literal compliance with GDC-4.

Such action would not enhance the protection of the environment, and would result in very high costs to the licensee as the plant could not restart from its current outage or continue to operate.

Alternative Use of Resources:

This action does not involve the use of any resources not previously considered in the Final Environmental Statement for the Crystal River Unit 3 Nuclear Generating Plant.

Agencies and Persons Consulted:

The NRC staff reviewed the licensee's request and did not consult with any other agencies or persons.

FINDING CF NO SIGNIFICANT IMPACT Based upon the foregoing environmental assessment, we conclude that the proposed action will not have a significant effect on the quality of the human env ironment. The Commission has, therefore, determined not to prepare an environmental impact statement for the proposed exemption.

e.

. For further details with respect to this acticr., see the application for exemption dated December 16, 1988, which is available for public inspection at the Commission's Public Document Room, 2120 L Street, N.W., Washington, D.C.

and at the Crystal River Public Library, 668 N.W., First Avenue, Crystal River, Florida 32629.

Dated at Rockville, Maryland, this 31st day of

May, 1989.

FOR Tf'E NUCLEAR REGULATORY C0FNISSION rk

~ h, w

H r ert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulatier 1

)

l

. _ _ _ - - _ - - - _ -