ML20247N561

From kanterella
Jump to navigation Jump to search
Forwards Rev 15 to UFSAR, (Filed in Category K) & Rev 10 to Fire Protection Program, (Filed in Category F).Encl UFSAR Rev 15 Also Contains QA Program Description Submitted IAW 10CFR50.54(a)(3)
ML20247N561
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/08/1998
From: Cotton J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247N565 List:
References
NUDOCS 9805270180
Download: ML20247N561 (3)


Text

T John 3.Citton 4*

Voe President 4

staton Support N

10CFR50.71(r)(4)

=r-10CFR50.54(a)(3)

PECO NUCLEAR ecco e"erov comne"v 965 Chesterbrook Blvd.

A Unit of PECO Energy gv)oP 087-5691 6

May 8,1998 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Submittal of Revision 15 of the Updated Final Safety Analysis Report and Revision 10 of the Fire Protection Program

Dear Sir / Madam:

In accordance with 10CFR50.71(e)(4) and 10CFR50.4(b)(6), this letter submits one original and ten copies of Revision 15 of the Updated Final Safety Analysis Report (UFSAR) and Revision 10 of the Fire Protection Program (FPP) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The enclosed copies are being provided to the NRC with a page revision listing that identifies the latest revision date of all current pages in accordance with 10CFR50.71(e)(1). We have also provided page replacement instructions for incorporating Revision 15 into the UFSAR and Revision 10 into the FPP. As required by 10CFR50.71(e)(5), each replacement page contains a bold vertical line in the margin adjacent to each area changed along with the date of the change. Revision 15 of the UFSAR and Revision 10 of the FPP reflect changes made up to a maximum of six raonths prior to this submittal in accordance with the requirements of 10CFR50.71(e)(4). As a result, the UFSAR Revision 15 and FPP Revision 10 reflect changes made to PBAPS, Units 2 and 3, under the provision of 10CFR50.59 at least up to December 31,1997.

The enclosed UFSAR Revision 15 also contains a revision to the Quality Assurance Program Description (QAPD) which is being submitted in accordance with l

10CFR50.54(a)(3). The revised QAPD (i.e., Appendix D of the UFSAR) reflects the l

transfer of responsibility from ANSI to ASTM for maintaining the standard for protective coatings applied to nuclear facilities. Replacing the commitment to Regulatory Guide 1.54 and ANSI N101.4-1972 with ASTM D3843-93 provides at least an equivalent level of commitment because the replacement standard meets or exceeds the existing standards.

~

9905270190 990509 PDR ADOCK 05000277 M

j x

PDR -

ti d

g-l May 8,1998 Page 2 As required by 10CFR50.71(e)(2)(l), I certify that to the best of my knowledge, Revision 15 of the UFSAR and Revision 10 o' the FPP accurately reflect information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above. In addition, as required by 10CFR50.71(e)(2)(ii), to this letter identifies changes made under the provision of 10CFR50.59, and included in Revision 15 of the UFSAR or Revision 10 of the FPP, but not previously submitted to the NRC.

If you have any questions or require further information, please contact us.

Very truly yours, M

l Enclosure Attachment cc: H. J. Miller, Administrator.*, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS j

l 1

i i

I J

ATTACHMENT 1 10CFR50.71(t)(2)(li) requires that revisions to the UFSAR include changes made under the provisions of 10CFR50.59, but not previously submitted to the NRC. Accordingly, the list below identifies these plant modifications and projects included in Revision 15 of the Peach Bottom Atomic Power Station (PBAPS),

Units 2 and 3, Updated Final Safety Analysis Report (UFSAR) or Revision 10 of the PBAPS Fire Protect!on Program (FPP) that were not previously submitted to the NRC. The list does nquepresent a complete list of UFSAR and FPP change packages incorporated.

Modification Unit Number Number Description 5210 3

Fire Protection and Safe Shutdown Program improvements.

P00231 0

Diesel Generator Enhancements.

P00240 2

Network Vibration Monitoring System.

F00350 3

Replacement of the Core Spray R

and RHR Pump Suction Strainers Located in the Torus.

P00400 2

Control Room and Drywell Chiller Upgrade.

P00513 2

Unit 2 Condensate Demineralized Control Upgrade.

P00720 3

Reactor Recirculation System Re-Rate, Unit 3.

P00722 C

Addition of Plant Equipment to Burn Station Waste OI: in the Plant Auxiliary Boilers.

P00734 C

Radwaste Service Enclosure / Security Enhancements.

ECR 97-00594 3

Replacement and Relocation of Restricting Orifice on Unit 3 HPCI Gland Seal Condenser.

_ _ _ _