MONTHYEARML20211G4771999-08-27027 August 1999 Notification of 990908 Meeting with Util in Rockville MD to Discuss License Termination Plan That Myap & Contractors Are Preparing as Part of Decommissioning of Myaps ML20210P1311999-08-11011 August 1999 Notification of 990823 Meeting with Maine Yankee Atomic Power Co in Rockville,Md to Discuss License Termination Plan That Util & Contractors Preparing as Part of Decommissioning of Maine Yankee Atomic Power Station ML20212H9551999-06-23023 June 1999 Notification of 990707 Meeting with Myap in Rockville, Maryland to Discuss License Termination Plan for Maine Yankee Atomic Power Station ML20196E1351999-06-23023 June 1999 Notification of 990707 Meeting with Util in Rockville,Md to Discuss License Termination Plan for Plant ML20207A6481999-05-19019 May 1999 Discusses Director Review of Plant Backfit Claim Re beyond- design-basis SFP Accidents & NRR Staff Response to Backfit Review Panel Findings ML20206H1571999-05-0606 May 1999 Notification of 990525 Meeting with Util in Rockville,Md to Discuss License Termination Plan That MYAPC & Contractors Preparing as Part of Decommissioning of Maine Yankee Atomic Power Station ML20207G2921999-03-0404 March 1999 Provides Status on Wits Item 9600184, Clarity & Intent of NRC Safety Guide 1, as It Related to Isat Insp of Maine Yankee Atomic Power Station ML20196D5271998-11-24024 November 1998 Notification of 981215 Meeting for Docket 7200030 with Myap in Rockville,Md,To Discuss Plans for General License to Store Spent Fuel at Onsite ISFSI ML20155C3891998-10-29029 October 1998 Notification of 981102 Meeting with Util in Rockville,Md to Discuss industry-wide Power Reactor Decommissioning Issues as Well as Status of Plant Licensing Action ML20195C3941998-10-28028 October 1998 Discusses Results of Backfit Review Panel Re Emergency Preparedness Requirements for Maine Yankee Panel Determined That Staff Not Imposed Backfit on Licensee.Other Issues, Which Arose During Panel Deliberations,Identified & Encl ML20154L1371998-10-14014 October 1998 Notification of 981109 Meeting W/Util to Present NRC Staff Overview of Mgt of Decommissioning of Maine Yankee Atomic Power Station,Including Proposed Schedule ML20237B3941998-08-11011 August 1998 Forwards Hg Brack s Re Grossly Careless NRC Oversight of Licensees.Copy of Response to Brack Ltr Will Be Provided ML20236V9151998-07-31031 July 1998 Notification of 980814 Meeting W/Util Re Proposed License Defueled Security Plan ML20237A7521998-07-31031 July 1998 Notification of Cancelled 980814 Meeting W/Util in Rockville,Md to Discuss Proposed Plant Defueled Security Plan ML20236F6531998-06-30030 June 1998 Notification of 980710 Meeting W/Maine Yankee in Rockville,Md to Provide Myap Opportunity to Discuss Appeal of NRC Backfit Determination Re Maine Yankee Emergency Preparedness Exemption Request ML20248M0341998-06-0909 June 1998 Informs of Appointment to Backfit Review Panel to Review 980506 Appeal Filed by Myap Re NRC Determination Involving Backfit Claim Made by Licensee Under 10CFR50.109.Util Requests for Exemption from EP Requirements Unwarranted ML20248A4391998-05-26026 May 1998 Notification of 980609 Meeting W/Util in Rockville,Md to Discuss Maine Yankee Spent Fuel Heatup Analysis in Support of Emergency Plan & Financial Protection Exemption Requests ML20247N3471998-05-0808 May 1998 Responds to 980126 Memo Requesting Action Taken as Result of Event Inquiry - Public Concerns W/Nrc Rept of Independent Safety Assessment at Plant ML20247N3001998-05-0505 May 1998 Responds to 980210 Memo Re Event Inquiry Involving Public Concerns W/Nrc Rept of Independent Safety Assessment at Plant ML20217K4941998-04-28028 April 1998 Notification of 980501 Meeting W/Licensee in Rockville,Md to Discuss Defueled Security Plan ML20217M6221998-04-28028 April 1998 Notification of 980501 Meeting W/Util in Rockville,Md to Discuss Util Defueled Security Plan.Meeting Cancelled ML20216C4421998-04-0808 April 1998 Notification of 980423 Predecisional Enforcement Conference W/Myap in King of Prussia,Pennsylvania to Discuss Apparent Violations Identified During Three Investigations Conducted by Oi,As Transmitted on 971219 to Myap ML20199B2621998-01-13013 January 1998 Notification of Significant Licensee Meeting 98-02 W/Util on 980128 to Discuss Licensee Approach to Upcoming Decontamination of Reactor Sys,Design for Sf Island Concept & Use of 10CFR50.59 for Sys Safety re-classification ML20198P7321998-01-12012 January 1998 Notification of 980121 Meeting W/Util in Rockville,Md to Discuss Proposed Plant Defueled Security Plan ML20199C2241997-11-12012 November 1997 Notification of 971125 Meeting W/Maine Yankee Atomic Power Co in Rockville,Md to Discuss Proposed Maine Yankee Atomic Power Station Defueled Technical Specifications ML20198S9401997-11-0606 November 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Proposed Myaps Defueled TSs ML20217G4061997-10-0707 October 1997 Notification of 971106 Meeting W/Licensee in Wiscasset,Me to Solicit Public Comments on Plant Post Shutdown Decommissioning Activities Rept.Meeting Agenda Encl ML20211G0331997-09-29029 September 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970609-12 IR 05000309/19970041997-09-29029 September 1997 Forwards NRC Operator Licensing Exam Rept 50-309/97-04OL (Including Completed & Graded Tests) for Tests Administered on 970609-12 ML20217E1631997-09-26026 September 1997 Revised Notification W/Agenda Change of 971007 Public Meeting in Wiscasset,Maine,To Brief Public on Regulatory Process for Decommissioning of NPP ML20217E2741997-09-24024 September 1997 Requests That Mk Webb Be Added to Site Access Authority.Site Access Were Completed & Thus Capable of Safe Conduct in Radiologically Restricted Areas ML20217C1381997-09-22022 September 1997 Notification of 971007 Meeting W/Public in Wicasset,Maine to Discuss Regulatory Process for Decommissioning of Npp. Meeting Held in Response to Recent Announcement by Myapco to Permanently Cease Operation of Myaps ML20217B0741997-09-0303 September 1997 Notification of 970903 Meeting W/Maine Yankee Atomic Power Co in Rockville,Md to Discuss Independent Sf Storage Installation Options Available to Maine Yankee for Storage of Sf.Notice Being Reissued to Revise Meeting Room Number ML20216A9881997-08-29029 August 1997 Notification of 970911 Meeting W/Util in Rockville,Md to Discuss Independent Spent Fuel Storage Installation Options Available to Plant for Storage of Spent Fuel ML20210Q7291997-08-21021 August 1997 Forwards OIG Audit Rept Entitled, NRC Needs Comprehensive Plan to Resolve Regulatory Issues. Rept Reflects Results of OIG Audit of Agency Response to Events at Plants ML20217K8121997-08-13013 August 1997 Notification of 970820 Meeting W/Util in Rockville,Md to Discuss Decommissioning Activities ML20148D1731997-05-23023 May 1997 Forwards Maine Yankee Restart Action Plan for Review & Approval in Accordance W/Nrc Inspection Manual Chapter 0350. RAP Contains List of Issues That NRC Will Inspect to Assess Licensee Compliance W/Applicable Requirements.W/O Encl ML20148D1701997-05-23023 May 1997 Notification of Significant Licensee Meeting 97-58 W/Util on 970606 in King of Prussia,Pa to Discuss Licensee Approach to Resolve Cable Separation Issues at Plant ML20236N2211997-05-0505 May 1997 Discusses Interpretation of Plant TS Re Acceptability of Grab Sampling on Leakage Detection Sys within Meaning of TS 3.14A ML20137U0031997-04-10010 April 1997 Forwards Proposed Response to Ltr from H Myers & Informs of No Need for Further Commission Review ML20137M6141997-04-0303 April 1997 Submits Documents Being Released to Public Re DSI-11, Operating Reactor Program Oversight ML20137E2041997-03-24024 March 1997 Requests Copy of Maine Yankee Restart Readiness Plan & 10CFR50.54(f) Response ML20137H4341997-03-24024 March 1997 Notification of Significant Licensee Meeting 97-30 W/Util on 970403 in Wiscasett,Me to Discuss Plant Restart Readiness Plan as Documented in to NRC ML20137H4361997-03-24024 March 1997 Notification of Significant Licensee Meeting 97-31 W/Util on 970403 in Wiscassett,Me to Discuss Plant Restart Readiness Plan as Documented in to NRC ML20136F9561997-03-13013 March 1997 Notification of 970320 Meeting W/Licensee to Discuss Proposed TS Change 194 Re Operation W/Reduced Reactor Coolant Sys Flow Rate ML20136F9651997-03-13013 March 1997 Notification of 970326 Meeting W/Licensee in Rockville,Md to Discuss SG Insp Plans & Contingencies ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20136F2431997-02-27027 February 1997 Notification of Significant Licensee Meeting 97-21 W/Util on 970311 to Discuss Apparent Violations Identified in Listed NRC Insp Repts ML20137M8101997-02-18018 February 1997 Informs That Paper Very Difficult to Get One Arms Around in Part Because It Tries to Deal Simultaneously W/Licensing, Insp & Performance Assessment in Each of Options & in Part Because Paper Implicit Assumption Ongoing Millestone. ML20134J9981997-02-10010 February 1997 Notification of 970212 Meeting W/Listed Attendees in Rockville,Md to Discuss Pending Phase I Mgt Svcs Agreement Between MYAPC & Nuclear Entergy,Inc 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211G4771999-08-27027 August 1999 Notification of 990908 Meeting with Util in Rockville MD to Discuss License Termination Plan That Myap & Contractors Are Preparing as Part of Decommissioning of Myaps ML20210P1311999-08-11011 August 1999 Notification of 990823 Meeting with Maine Yankee Atomic Power Co in Rockville,Md to Discuss License Termination Plan That Util & Contractors Preparing as Part of Decommissioning of Maine Yankee Atomic Power Station ML20212H9551999-06-23023 June 1999 Notification of 990707 Meeting with Myap in Rockville, Maryland to Discuss License Termination Plan for Maine Yankee Atomic Power Station ML20196E1351999-06-23023 June 1999 Notification of 990707 Meeting with Util in Rockville,Md to Discuss License Termination Plan for Plant ML20207A6481999-05-19019 May 1999 Discusses Director Review of Plant Backfit Claim Re beyond- design-basis SFP Accidents & NRR Staff Response to Backfit Review Panel Findings ML20206H1571999-05-0606 May 1999 Notification of 990525 Meeting with Util in Rockville,Md to Discuss License Termination Plan That MYAPC & Contractors Preparing as Part of Decommissioning of Maine Yankee Atomic Power Station ML20207G2921999-03-0404 March 1999 Provides Status on Wits Item 9600184, Clarity & Intent of NRC Safety Guide 1, as It Related to Isat Insp of Maine Yankee Atomic Power Station ML20196D5271998-11-24024 November 1998 Notification of 981215 Meeting for Docket 7200030 with Myap in Rockville,Md,To Discuss Plans for General License to Store Spent Fuel at Onsite ISFSI ML20155C3891998-10-29029 October 1998 Notification of 981102 Meeting with Util in Rockville,Md to Discuss industry-wide Power Reactor Decommissioning Issues as Well as Status of Plant Licensing Action ML20195C3941998-10-28028 October 1998 Discusses Results of Backfit Review Panel Re Emergency Preparedness Requirements for Maine Yankee Panel Determined That Staff Not Imposed Backfit on Licensee.Other Issues, Which Arose During Panel Deliberations,Identified & Encl ML20154L1371998-10-14014 October 1998 Notification of 981109 Meeting W/Util to Present NRC Staff Overview of Mgt of Decommissioning of Maine Yankee Atomic Power Station,Including Proposed Schedule ML20237B3941998-08-11011 August 1998 Forwards Hg Brack s Re Grossly Careless NRC Oversight of Licensees.Copy of Response to Brack Ltr Will Be Provided ML20236V9151998-07-31031 July 1998 Notification of 980814 Meeting W/Util Re Proposed License Defueled Security Plan ML20237A7521998-07-31031 July 1998 Notification of Cancelled 980814 Meeting W/Util in Rockville,Md to Discuss Proposed Plant Defueled Security Plan ML20236F6531998-06-30030 June 1998 Notification of 980710 Meeting W/Maine Yankee in Rockville,Md to Provide Myap Opportunity to Discuss Appeal of NRC Backfit Determination Re Maine Yankee Emergency Preparedness Exemption Request ML20248M0341998-06-0909 June 1998 Informs of Appointment to Backfit Review Panel to Review 980506 Appeal Filed by Myap Re NRC Determination Involving Backfit Claim Made by Licensee Under 10CFR50.109.Util Requests for Exemption from EP Requirements Unwarranted ML20248A4391998-05-26026 May 1998 Notification of 980609 Meeting W/Util in Rockville,Md to Discuss Maine Yankee Spent Fuel Heatup Analysis in Support of Emergency Plan & Financial Protection Exemption Requests ML20247N3471998-05-0808 May 1998 Responds to 980126 Memo Requesting Action Taken as Result of Event Inquiry - Public Concerns W/Nrc Rept of Independent Safety Assessment at Plant ML20247N3001998-05-0505 May 1998 Responds to 980210 Memo Re Event Inquiry Involving Public Concerns W/Nrc Rept of Independent Safety Assessment at Plant ML20217K4941998-04-28028 April 1998 Notification of 980501 Meeting W/Licensee in Rockville,Md to Discuss Defueled Security Plan ML20217M6221998-04-28028 April 1998 Notification of 980501 Meeting W/Util in Rockville,Md to Discuss Util Defueled Security Plan.Meeting Cancelled ML20216C4421998-04-0808 April 1998 Notification of 980423 Predecisional Enforcement Conference W/Myap in King of Prussia,Pennsylvania to Discuss Apparent Violations Identified During Three Investigations Conducted by Oi,As Transmitted on 971219 to Myap ML20199B2621998-01-13013 January 1998 Notification of Significant Licensee Meeting 98-02 W/Util on 980128 to Discuss Licensee Approach to Upcoming Decontamination of Reactor Sys,Design for Sf Island Concept & Use of 10CFR50.59 for Sys Safety re-classification ML20198P7321998-01-12012 January 1998 Notification of 980121 Meeting W/Util in Rockville,Md to Discuss Proposed Plant Defueled Security Plan ML20199C2241997-11-12012 November 1997 Notification of 971125 Meeting W/Maine Yankee Atomic Power Co in Rockville,Md to Discuss Proposed Maine Yankee Atomic Power Station Defueled Technical Specifications ML20198S9401997-11-0606 November 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Proposed Myaps Defueled TSs ML20217G4061997-10-0707 October 1997 Notification of 971106 Meeting W/Licensee in Wiscasset,Me to Solicit Public Comments on Plant Post Shutdown Decommissioning Activities Rept.Meeting Agenda Encl ML20211G0331997-09-29029 September 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970609-12 IR 05000309/19970041997-09-29029 September 1997 Forwards NRC Operator Licensing Exam Rept 50-309/97-04OL (Including Completed & Graded Tests) for Tests Administered on 970609-12 ML20217E1631997-09-26026 September 1997 Revised Notification W/Agenda Change of 971007 Public Meeting in Wiscasset,Maine,To Brief Public on Regulatory Process for Decommissioning of NPP ML20217E2741997-09-24024 September 1997 Requests That Mk Webb Be Added to Site Access Authority.Site Access Were Completed & Thus Capable of Safe Conduct in Radiologically Restricted Areas ML20217C1381997-09-22022 September 1997 Notification of 971007 Meeting W/Public in Wicasset,Maine to Discuss Regulatory Process for Decommissioning of Npp. Meeting Held in Response to Recent Announcement by Myapco to Permanently Cease Operation of Myaps ML20217B0741997-09-0303 September 1997 Notification of 970903 Meeting W/Maine Yankee Atomic Power Co in Rockville,Md to Discuss Independent Sf Storage Installation Options Available to Maine Yankee for Storage of Sf.Notice Being Reissued to Revise Meeting Room Number ML20216A9881997-08-29029 August 1997 Notification of 970911 Meeting W/Util in Rockville,Md to Discuss Independent Spent Fuel Storage Installation Options Available to Plant for Storage of Spent Fuel ML20210Q7291997-08-21021 August 1997 Forwards OIG Audit Rept Entitled, NRC Needs Comprehensive Plan to Resolve Regulatory Issues. Rept Reflects Results of OIG Audit of Agency Response to Events at Plants ML20217K8121997-08-13013 August 1997 Notification of 970820 Meeting W/Util in Rockville,Md to Discuss Decommissioning Activities ML20148D1731997-05-23023 May 1997 Forwards Maine Yankee Restart Action Plan for Review & Approval in Accordance W/Nrc Inspection Manual Chapter 0350. RAP Contains List of Issues That NRC Will Inspect to Assess Licensee Compliance W/Applicable Requirements.W/O Encl ML20148D1701997-05-23023 May 1997 Notification of Significant Licensee Meeting 97-58 W/Util on 970606 in King of Prussia,Pa to Discuss Licensee Approach to Resolve Cable Separation Issues at Plant ML20236N2211997-05-0505 May 1997 Discusses Interpretation of Plant TS Re Acceptability of Grab Sampling on Leakage Detection Sys within Meaning of TS 3.14A ML20137U0031997-04-10010 April 1997 Forwards Proposed Response to Ltr from H Myers & Informs of No Need for Further Commission Review ML20137M6141997-04-0303 April 1997 Submits Documents Being Released to Public Re DSI-11, Operating Reactor Program Oversight ML20137H4361997-03-24024 March 1997 Notification of Significant Licensee Meeting 97-31 W/Util on 970403 in Wiscassett,Me to Discuss Plant Restart Readiness Plan as Documented in to NRC ML20137E2041997-03-24024 March 1997 Requests Copy of Maine Yankee Restart Readiness Plan & 10CFR50.54(f) Response ML20137H4341997-03-24024 March 1997 Notification of Significant Licensee Meeting 97-30 W/Util on 970403 in Wiscasett,Me to Discuss Plant Restart Readiness Plan as Documented in to NRC ML20136F9561997-03-13013 March 1997 Notification of 970320 Meeting W/Licensee to Discuss Proposed TS Change 194 Re Operation W/Reduced Reactor Coolant Sys Flow Rate ML20136F9651997-03-13013 March 1997 Notification of 970326 Meeting W/Licensee in Rockville,Md to Discuss SG Insp Plans & Contingencies ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20136F2431997-02-27027 February 1997 Notification of Significant Licensee Meeting 97-21 W/Util on 970311 to Discuss Apparent Violations Identified in Listed NRC Insp Repts ML20138M2431997-02-21021 February 1997 Staff Requirements Memo Re Briefing by Maine Yankee & NRC on 970204 Concerning Status of Corrective Actions at Facility ML20137M8101997-02-18018 February 1997 Informs That Paper Very Difficult to Get One Arms Around in Part Because It Tries to Deal Simultaneously W/Licensing, Insp & Performance Assessment in Each of Options & in Part Because Paper Implicit Assumption Ongoing Millestone. 1999-08-27
[Table view] |
Text
_ _ _ . . _ _ .
t ej 3 May 8, 1998 1* &&
MEMORANDUM TO: Hubert T. Bell Inspector General OriginalSigned bY -
ShirleyAnnJackson FROM: Shirley Ann Jac'< son
SUBJECT:
EVENT INQUI'tY - PUBLIC'S CONCERNS WITH NRC REPORT :
OF INDEPENDENT SAFETY ASSESSMENT (ISA) AT MAINE I YANKEE ATOMIC POWER STATION (CASE NO. 97 03S)
This responds tc your January "6,1998, memorandum requesting action taken as a result of the above event inquiry. I note that your findings suoport the technical conclusions of the Maine Yankee independent Safety Assessment (ISA) report. However, the event inquiry identified that certain language used in the ISA report did not facilitate clear communication with the public. By this memorandum, I am fonwarding the stafs response to your report addressing the communication issues noted.
i Thank you for your efforts in this matter, j i
i
Attachment:
Memorandum to Chairman Jackson from L. Joseph Callan dated May 5,1998.
cc: Commissioner Dicus Commissioner Diaz Commissioner McGafgan OCFO C ,.
h5 O*f OClO OCA Distnbution-OPA HThompson AEOD R/F EDO Control G980087 g H. Miller, Rt PNorry IRD R/F SMcKelvin (#98-19) \ g L. Reyes, Rll JBlaha ER R/F JCrutchley (Blue #98-07) ,
A. Beach,111 SBURNS File Center E. Merschoff, RIV CMiller, RIF Public .
(O)
DISK / DOCUMENT NAME: h:Terb\ madison \chrmnitr.ig
- See previous concurrences )I To voceeve a cop ', indlcels: *C' = Copy mWo suechment enclosure; 'A' = Copp wem suechmenpendoeure; " Nae No cop r. NO MARK a NO COPYi OFC IRD:AEOD C D:lRD:AEOD N D:AEOD N D:NRR A RGN-1/D
. NAME ALMadison FJCongol TTMartin SCollins ARBloug DATE 03/09/98* 03/09/98* 03/11/98* 03/13/98* 03/16/98 i OFC A OEDO A A:DEDE EDO*- /'S/
NAME SPURNS ACThadani LJCallan O[*H DATE 03/16/98* 04/ /93 04/24/98 5/g/1g' OFFICIAL RECORD COPY ,
K
~ a - aw__ -
1 3 l MEMORANDUM TO: Hubert T. Bell Inspector General 1
FROM: Shirley Ann Jackson ,
SUBJECT:
EVENT INQUIRY - PUBLIC'S CONCERNS TH NRC REPORT OF INDEPENDENT SAFETY ASSESSME T(ISA) AT MAINE YANKEE ATOMIC POWER STATION ( SE NO.97-03S)
This responds to your January 26,1998, memorandum requestin action taken as a result of the above event inquiry. I note that your findings support the techn' I conclusions of the Maine Yankee Independent Safety Assessment (ISA) report. Howev , the event inquiry identified that certain language used in the ISA report did not facilitate clear mmunication with the public. By this memorandum, I am forwarding the staff's response to y ur report addressing the communication issues noted.
Thank you for your efforts in this matter.
Attachment:
Memorandum to Chairman Jackso rom L. Joseph Callan dated May 5,1998.
cc: Commissioner Dicus Commissioner Diaz Commissioner McGaffigan SECY OGC OCFO OClO OCA Distribution:
OPA HThompson AEOD R/F EDO Control G980087 H. Miller, RI PNorry IRD R/F SMcKelvin (#98-19)
L Reyes,Ril JBlaha ER R/F JCrutchley (Blue #98-07)
A. Beach, lll SBURNS File Center E. Merschoff, RIV CMiller, RIF Public DISK / DOCUMENT NA : h:\ erb \ madison \chrmnitr.ig -
- See previous concurrences To receive a cmp r. Indaulo: "C* a w/c attachment /endoeurs:'A's Copy with attachmuntlendoeure "N" = No cop r. NO MARK e NO COPYI OFC IRD:AEOf C D:lRD:AEOD lN D:AEOD lN D:NRR A RGN-1/D NAME FJCongel TTMartin SCollins ARBloug ALMadfon DATE 03/0h8* 03/09/98* 03/11/98* 03/13/98* 03/16/98 ,
OFC A:qdDO A A:DEDE EDO*
NAME ShURNS ACThadani LJCa!!an DATE 03/16/98* 04/ /98 04/24/98 OFFICIAL RCCORD COPY a____-_-__.____
MEMORANDUM TO: Hubert T. Bell inspector General FROM: Shirley Ann Jackson
SUBJECT:
EVENT INQUIRY - PUBLIC'S CONCERNS WITH NRC REPORT OF INDEPENDENT SAFETY ASSESSMENT (ISA) AT MAINE YANKEE ATOMIC POWER STATION (CASE NO.97-03S)
Having reviewed the referenced event inquiry, I would like to t k you and your staff for your prompt and professional work. I rrote that your findings sup rt the technical conclusions of the Maine Yankee Independent Safety Assessment (ISA) re .. However, you identified that certain language used in the ISA report did not facilitat ar communication with the public. By this memorandum, I am forwarding the staff's' respo to your report addressing the communication issues noted. ;
l Thank you for your efforts in this matter.
Attachment:
Memorandum to Chairma ackson from L. Joseph Callan dated ;
cc: Commissioner Dieus l Commissioner Diaz Commissioner McGaffiga SECY OGC OCFO :
1 OClO OCA Distnbution-OPA HThompson AEOD R/F EDO Control G980087 H. Miller, RI . PNorry IRD R/F SMcKelvin (#98-19)
L.Reyes,R JBlaha ER RIF JCrutchley (Blue #98-07)
A. Beach, 1 SBURNS File Center E. Merschoff, RIV CMiller, RIF Public !
l DISK / DOCUMENT NAME: h:\ erb \madisonichrmnitr.ig
- See previous concurrences To renews a cap r, hduto T = Copy udo omschment endoeure: *A* = Copy we anschmentiendoeure:"N" = No copr NO MMtK = NO COPYf OFC IRDAEOD C D:lRD:AEOD N DAEOD N D:NRR A RGN-1/D NAME ALMadison FJCongel' TTMartin SCollins ARBloug DATE 03/09/98* 03/09/98* 03/11/98* 03/13/98* 03/16/98 ;
OFC A OEDO A A:DEDE EDh NAME SPURNS ACThadani LJC M DATE 03/16/98* 04/' /98 0&fj)98 OFFICIAL RECORD COPY .
T MEMORANDUM TO: Hubert T. Bell Inspector General FROM: Shirley Ann Jackson
SUBJECT:
EVENT INQUIRY - PUBLIC'S CONCERNS WITH R[ REPORT OF INDEPENDENT SAFETY ASSESSMENT ( AT MAINE YANKEE ATOMIC POWER STATION (CAS .97-03S)
Having reviewed the referenced event inquiry, I would and yourlike staff to thank yot[/
for your prompt and professional work. I note that your findings support thyfechnical conclusions of the Maine Yankee Independent Safety Assessment (ISA) report. However, you identified that certain language used in the ISA report did not facilitate clear munication with the public. By this memorandum, I am forwarding the staff's response to yo report addressing the communication issues noted.
Thank you for your efforts in this matter.
Attachment:
Memorandum to Chairman Jackson from L. Joseph Callan dated
/
cc: Commissioner Dieus Commissioner Diaz j
/
Commissioner McGaffigan /
SECY ,
OGC /
OCFO '
OClO OCA Distribution:
OPA Thompson AEOD R/F EDO Control G980087 H. Miller, RI PNorry IRD R/F SMcKelvin (#98-19)
L. Reyes, Ril JBlaha ER R/F JCrutchley (Blue #98-07)
A. Beach, Rlll SBums File Center E. Merschoff, RIV '
CMiller, RIF Public
/
DISK / DOCUMENT NAME: h:Wrb\ madison \chrmnitr.ig
- See previous concurrences ;
To roosive a crip t, indicate 'C' = Copp w/o attachment /endosure: *A* a Copy with attachment /endoeure: *N* = No copr. NO MARK = NO COPYi OFC IRD:AEOD' C D:lRD:AEOD N D:AEOD N D:NRR A RGN-1/D NAME ALMadjson FJCongel TTMartin SCollins ARBloug DATE 03/09/98* 03/09/98* 03/11/98* 03/13/98* 03/16/98 OFC A; EDO A A:DEDE EDO I NAME SDums ACThadani LJCallan DATE / 03/16/98* ,
03/ /98 03/ /98 g c3 f
OFFICIAL RECORD COPY
. },
~ MEMORANDUM TO: Hubert T. Bell Inspector General FROM! Shirley Ann Jackson
SUBJECT:
EVENT INQUIRY - PUBLIC'S CONCERNS WITH NRC REPORT OF INDEPENDENT SAFETY ASSESSMENT (ISA) AT MAINE YANKEE ATOMIC POWER STATION (CASE NO.97-03S)
Having reviewed 'the referenced event inquiry, I would like to t k you and your staff for your prompt and professional work. I note that your findings sup it the technical conclusions of the Maine Yankee independent Safety Assessment (lSA) re However, you identified that certain language used in the ISA report did not facilitat ar communication with the public. By this memorandum, I am forwarding the staffs respo to your report addressing the communication issues noted.
Thank you for your efforts in this matter.
Attachment:
Memorandum to Chairma ackson from L. Joseph Callan dated cc: Commissioner Dicus '
Commissioner Diaz Commissioner McGaffiga SECY OGC OCFO ,
OClO !
OCA Distnbution-OPA HThompson AEOD R/F EDO Control G980087 ,
H. Miller, Rl PNorry - IRD R/F SMcKelvin (#98-19) ,
L.Reyes,R JBlaha ER R/F JCrutchley (Blue #98-07) ;
A Beach, i SBURNS File Center E. Merschoff, RIV CMiller, RIF Public l i
DISK / DOCUMENT NAME: h:\ erb \ madison \chrmnitr.ig
- See previous concurrences
- To sucehe a cop '. Indicals: 'C' = Copy afo anschmentfenclosure:"A" = Copy we suechmenWendoeure: 'tr = No cop t NO MMtK = NO COPY 1 OFC IRD:AEOD C ' D:lRD:AEOD N DAEOD N D:NRR A RGN-1/D l NAME ALMadison FJCongel TTMartin SCollins ARBloug <
DATE- 03/09/98* 03/09/98* 03/11/98* 03/13/98* 03/16/98 OFC A:OEDO A A:DEDE EDh NAME SPURNS ACThadani ~LJCal@
DATE- 03/16/98* 04/ /98 0&f))98 OFFICIAL RECORD COPY
T'
/ 'o
~,, UNITED STATES
! . NUCLEAR REGULATORY COMMISSION
$ $ WASHINGTON, D. C. 20655 May 8, 1998
%,*****,o/
CHAIRMAN MEMORANDUM TO: Hubert T. Bell inspector General FROM: Shirley Ann Jadson k
SUBJECT:
EVENT INQUIRY - PUBLIC'S CONCERNS WITH NRC REPORT OF 'NDEPENDENT SAFETY ASSESSMENT (ISA) AT MAINE YANKEE ATOMIC POWER STATION (CASE NO.97-03S)
This responds to your January 26,1998, memorandum requesting action taken as a result of the above event inquiry. I note that your findinga support the technical conclusions of the Maine Yankee Independent Safety Assessment (ISA) report. However, the event inquiry identified that certain language used in the ISA report did not facilitate clear communication with the public. By this memorandum, I am forwarding the staffs response to your report addressing the communication issues noted.
Thank you for your efforts in this matter.
Attachment:
Memorandum to Chairman Jackson from L. Joseph Callan dated May 5,1998.
cc: Commissioner Dieus Commissioner Diaz Commissioner McGaffigan SECY OGC OCFO 0C10 OCA OPA H. Miller, RI L. Reyes, Ril A. Beach, Rlli E. Merschoff, RIV
. T l p
,fmg% UNITED STATES g
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3066H001
$ 1 l
MEMORANDUM TO: Chairman Jackson FROM: L. Joseph Callan Executive Director s
SUBJECT:
EVENT INQUIRY - P BLIC'S CONCERNS WITH NRC REPORT OF INDEPENDENT SAFETY ASSESSMENT (ISA) AT MAINE YANK 5E ATOMIC POWER STATION (CASE NO.07-03S)
In resnonse to your memorandum dated February 10,1998, the subject OlG Event Inquiry Report has been reviewed. The report concluded, in part, that some misunderstanding and confusion resulted from the language used in the Maine Yankee Independent Safety Assessment Team (ISAT) report. While the staff constantly strives to communicate their findings clearly, misunderstandings may occur and should be resolved promptly. I believe the !
recommendations of the Communications Coordinating Committee in response to DSI-14 will assist in improving the communications issues identified in the OlG Event inquiry Report. Our ,
response to each finding is attachea.
Attachment:
As stated cc: Commissioner Dieus Commissioner Diaz Commissioner McGaffigan SECY OGC OCFO OClO
~
OCA OPA l 95[J963ClO3 _
l
.. ' ~
T I RESPONSES TO FINDINGS IN OlG EVENT INQUIRY - PUBLIC'S CONCERNS WITH NRC l
REPORT OF INDEPENDENT SAFETY ASSESSMENT (ISA) AT MAINE YANKEE ATOMIC POWER STATION (CASE NO.97-038)
- 1. FINDING: The OlG inquiry revealed that the significant deficiencies identified by the ISAT were either resolved by the iconsee during the ISA or were provided to NRC program offices for resolution. OlG learned that the ISAT considered the balance of the good and bad of the safety systems and programs reviewed to conclude that MYAPS was in general conformance with its licensing and design bases.
Additionally, the ISAT took into account MYAPS' defense-in-depth when it concluded that the plant posed no undue risk to public health and safety and was safe to operate.
RESPONSE: No response required. .
- 2. FINDING: The OlG inquiry found that several phrases such as " undue risk" and " adequate protection" to the public were used by the ISAT to describe the NRC's standard of )
i protection of public health and safety as applied to MYAPS. However, OlG l l leamed that these phrases are not clearly defined by th'e NRC.
RESPONSE: We recognize the need to communicate clearly with all stakeholder including the public. In response to DSI-14, the staff has developed recommendations on public communications initiatives. These initiatives are documented in the
" Report of the Communications Coordinating Committee With Recommendations on Public Communications initiatives," dated March 24, igg 8 (CCC Report).
Plans include making written and spoken language more understandable by, in part, explaining technical jargon, boilerplate language, acronyms, and regulatory findings in a balanced way so that the public can better understand what we are trying to convey. The CCC highlighted that the staff commonly uses terms in which there is not universal agreement, even within the agency, as to what each means. A recommendation by the CCC was for the agency's technical stuff to conduct a review of the glossary of nuclear expressions that recently was posted on the NRC Website and both expand and enhance it to include often used expressions with clear, agreed-upon definitions in plain English. This is a ;
1 complex task for many of the terms and phrases because they are rooted in l
l statutory language or judicial interpretations developed over some 40 years of nuclear regulebon The EC recommendation was that the qualitative objectives l of the CCC should be pumuod within the context of annual updates to the glossary of nuclear expressions.
- 3. FINDING: The OlG concluded that those not involved with the nuclear ir.dustry may have been confused with the ISAT's assessment of MYAPS using language normally found in SALP reports.
RESPONSE: While the choice to use language normally found in SALP reports ws: made to facilitate communications with the licensee, those not directly involved with the i
nuclear industry may have been confused. In response to DSI -14, the staff has developed recommendations on public communications initiatives. The recommendations in the CCC report include the development and adoption of a l
~ .
2-format for both technical reports and public meetings that includes a clear Executive Summary. This summary would state the problems and issues identrflod and NRC's findings in language the layman can comprehend.
- 4. FINDING: OlG learned that the ISAT resulted in MYAPS performing additional reviews of the plant and enhancing its self-assessment processes. The Suroweic 115 kV offsite power line, the thennal relief valves to protect the heat exchangers, and the cable separation issues were uncovered by the licensee as a result of MYAPS expanded self-assessment.
RESPONSE: No response required.
- 5. FINDING: OlG found that although the ISAT report contained language to suggest the ISAT
- made operability determinations, OlG determined that all operability determinations were conducted by MYAPS.
RESPONSE: We acknowledge that statements about MYAPS' operability in the ISAT report could confuse a reader. Clearly, at no time did anyone on the ISAT team conduct an operability determination. This finding again highlights the need for clear communications. The initiatives in the CCC Report should address these concems.