m.
y.. s I
- I i Duke Mer Comparty HuR %n U
PO Bax33198 - '
tice President
[
Charlotte, N U 2E242 Mclear PrMaction lL (TM)37M531 DUKEPOWER September 15, 1989 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 Requested Technical Specifications Changes NRC Differing Professional Opinion Concerns (T.S. 3/4.3.2)
(TACS 55435 and 55436)
Gentlemen:
Attached (pursuant to 10CFR50.4 and 50.90) are license amendment requests to Appendix A, Technical Specifications, of Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively. The requested amendments correct an inadvertent error and more adequately define an Engineered Safety Features Actuation System Instrumentation trip setpoint/ allowable value, add appropriate Engineered Safety Features response times, and revise an Engineered Safety Features response time. These changes result from certain concerns raised by the NRC in a Differing Professional Opinion (DPO) during review of the proposed original McGuire Units 1 and 2 combined Technical Specifications.
Attachment I contains the requested Technical Specification changes, Attachment 2 contains the justification and safety analysis to support the requested changes.
Pursuant to 10CFR 50.91, Attachment 3 provides the analysis performed in accordance with the standards contained in 10CFR 50.92 which concludes that the proposed amendments do not involve a Significant Hazards Consideration, and Duke is forwarding a copy of this amendment request application and No Significant Hazards Consideration Analysis to the North Carolina Department of Human Resources. The requested amendments have been reviewed and have been determined to have no adverse safety or environmental impact.
Note that these requested changes are in accordance with our June 10, 1986 response to the plant-specific NRC DPO concerns, which were subsequently concurred with by the NRC, and should resolve the relevant concerns. Please be advised that the FSAR revisions identified in the June 10th response (i.e.,
question nos. 4a&b, and 4c), which were also concurred with by the NRC, will be incorporated into the McGuire FSAR via the 1989 FSAR annual update. These requested Technical Specifications amendments and the upcoming FSAR update will complete all currently known Duke Power Company required actions regarding the DPO (other concerns contained in the DPO were either being considered by the NRC for generic resolution, had been closed by NRC internal review, or were still under review). It is anticipated that any other concerns will be addressed through McGuire implementation of the generic Technical Specification improvement l
efforts currently underway by industry (e.g., WOG MERITS /NRC TSIP).
8909260179 890915 PDR ADDCK 05000369 i t P
PNU j
t____________________
j
I-t'
[.;.,..
Document Control Desk Page 2.
September-15, 1989'
+
This matter was discussed with the NRC Resident Inspector and Mr. D.'S Hood of
.your staff at~the June 21, 1989 Duke /NRC Interface Meeting. Should there be any questions concerning these amendment requests or if additional information~is required, please advise.
Very truly yours,
- 4/
Y gge Hal B. Tucker PbN178/lcs Attachments xc:
(w/ attachments)
Mr. S. D. Ebneter Regional Administrator U. S. Nucle r Regulatory Commission Region II 101 Marietta St., hN, Suite 2900 Atlanta, Georgia 30329 Mr. Dayne Brown, Chief Radiation Protection Branch Division of Facility Services Department of Human Services 701 Barbour Drive Raleigh, North Carolina 27603-2008 Mr. Darl S. Hood Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D C.
20555 Mr. P. K. VanDoorn NRC Resident Inspector McGuire Nuclear Station J
L' i
h L
Document Control Desk
=
.Page 4 September. 15, 1989 l
Hal B. Tucker, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station Technical Specifications, Appendix A to Facility Operating License Nos. NPF-9 and NPF-17; and that all statements and matters set forth therein are true and correct to the best'of his knowledge.
~
Hal B. Tucker, Vice President Subscribed and sworn to before me this 15th day of September, 1989.
Notary Public My Commission Expires:
l
~
g.
.D
,. 4 'c
^,
4 ATTACHMENT 1 McGuire Unit 1 and 2 Technical Specifications Changes Requests i.
1
- - - - _. _ _ _ _ _ _ _ _ _ _,