Monthly Operating Repts for Aug 1989 for McGuire Nuclear Station
ML20247M824
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/31/1989
From: Moser S, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20247J211 List:
References
NUDOCS 8909260063
Download: ML20247M824 (10)


Text

.. _ -.

(;

n

=

l

\\

I l-DFERATING DATA REPORT I

f

(.

DOCKET ND 369 DATESepteder 15. 1989 DPERATING STATUS COMPLETED BY F.A. Williaes TELEPHCNE 704-373-5987

1. Unit Name: McGuire 1
2. Reporting Feriod: August 1,1929-August 31,1989
3. Licensed Thersel Power (MWt):

3411

4. Nameplate Fating (Bross MWe):

1305*

Notes

  • Nameplate Rating
5. Design Electrical Rating (het MWe):

1100 (Bross MWe) talculated as

6. Marious Pependable Capacity (Bross MWe):

1171 1450.000 MVA x.90 power

7. Ifax: sus Dependable Capacity (Net MWeh

!!29 fattor per Page iii, B. If Chan;es Ottur in Capacity Ratings (Items Nt.eber 3 Through 7) Since Last NUREB-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason For 6 restrictions, If any:

I I

This honth Yr.-to-Date Cusulative 11.' Hours in Reporting Period 744.0 5831.0 67943.0 J

12. Nuaber Cf Hours Reatter Was Crititel 699.3 4281.2 47929.1 1
13. Featter Feserve Shutdown Ho?.rs

--0--

- --0--

14. Hours Benerator On-Line 691.5 4260.0 47369.9
15. Unit Reserve Shutdewn Hours

--0--

--0--

--0--

16. Srcss Thettal Energy Generated (MWH) 2300333 1394!909 141470434
17. Sress Electrital Energy Generated (MWH}

766512 4722001 4SB20958 l

19. Net Electrical Energy Generated IMWH) 733794 4522623 46576231
19. Unit Service fatter 92.9 73.1 69.7
20. Unit Availability factor 92.9 73.1 69.7 l

l

21. Unit Capacity Factor tusing MDC Net) 87.4 68.7 59.0 EE. Unit Capacity Fatter (Usirig DER Net) 32.6 65.7 59.1
23. Unit Fcrted Outage Rate 7.1 26.9 13.0
24. Shutdewn Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh Nnno

)

25. If Shut Dcwn At End Of Feport Feriod. Esticated Date of Etartu;:

E6' Units In Test Status (Prict to Cosmercial Operation):

Forecast Achieved l

INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL GFEEATION I

l 1

8909260063 890915 PDR ADOCK 05000369 R

PNV k

j

.)

m,c'

...e.g

-p.

'0FERATING DATA REPORT DOCKET ND 50-369 UNIT McGuire 1 DATEsecteeber 15, 1999 COMPLETED By F.A. Williaes TELEPHONE 704-373-5987 L:

MONTH Aucust. 1999 CAY AVERASE DAILY PDWER LEVEL -

EAY AVERABE DAILY F0WER LEVEL (MWe-Net)

(MWe-Neti 1!

1097 17 1092

'2 1089 1B 1091 L.

.3'

'10B8 19 109P 4-1092 20 1093

~

5 1092 21 1096 6'

1099 22 1104 7

1085 23 1108

~

'B-1082 24

!!03 b

9 1087-25 1100 10 1067 26 410 11 '

1069 27 0

h 12 1092 28 89 13 l 1032 29 674 n

14 1092 30 1100 15 1092 31 1095 16-1091

~;__

IllIlll H

]

1l ll1ll!ll llJ i

c nas e

. [,_ ;_

ot n c

iae r

,[ ;_

_2 tDc u

_6 T

c i

o

~

_ ;7 N

A ufL)

S

[ _R5 A

I ro R)

- ~

_E -

L t

.rE1 e

[ _S3 R

O' snoL6 m

~

_9_O 7 E

O O

noF( 1 a

E 8_ M_3 0

S E

H C

T I i 95L V

E C

t st -

6[5 t)

I C

T ER E

- at rG 3U_1 W4 T

N A

SO U

reoE

_0 C

E P

LT DS G a e pR h L_

I 7

E R

S AC M

pheU 0 C 9_

ROR I

FA EE t eSRN t

5 E__O_S_(

~

RTU D

E SL i r

(

i O

C OR AB b P yt b

rne

.EEYE CNE R

T EO i

i OMTBN OR E

W RR hrt el h

NAA O

DI P

EO CP xonvi x

E EfEEF NDDH NTT UL N

)

)

T EP ACN N

D I P 4

5 ET TE AE O

F M

(

(

CN

.EL E

V I

PO RU KI.

LE S

E T

I EP OU PT U

R C

RN W

D M

A P

U TO OR O

C D

I PE m)

C ET RT T

an RS OA DA ri E

TC EW mca DU CI W TD aSl AQ ADO LE r

p OE ENL AE ccx LR RI F HF

.SiE t(

l l a S

aamr N

O T

duuoe I

N 2

U X

onnth E

2 R

X h aaut T

)

C 9

5 NE 2

T P

t MMAO OD 2

S M

e-U 8

(

M1 234 D

9 PO 2

N U

)

MC 2

I P

3 E

1 R

O

(

t C

R s

n E

u E

o SMD Z

A H

W g

i

)

H t

O u

4 YEO Z

I STC a

A_

P

(

n i

D N

m A

E a

S T

x S

NTR E

N ENO e

W H

CEPO

)

O T

I VEN n

s D

N LER i

n T

. O a

e

)

l c

n U

M H

TN p

ni i

TD UWX x

oL a

S T

)

R 3EOFHO/

3 E

i l

( t t&

p T

O MHOSDR

(

I P

s c

x ee ig E

N E

)

U R

2 F

A A

rt rn

(

REASON u

ti

)

(

l r snern i o eivoi N

0 a

Raira Fe rt rl O

5 c

yT a E p I S TR 2

t ngr r

x AU 5

nanort rE RO enit oso(

UH mel ati t pt el anar D

ninuurire ouifgemeh sqaeepd pt

)

aEMRROAOO 1

TYPE S

F F

e-(

RABCDEFGH

)

2 3

6 8

(

1 2

2 E

8 8

8 d

T e

A l

D 9

9 9

d u 8

8 8

ed ce rh P

P oc FS 8

4 9

NO FS

)

1 1

1 8

(

jl IllllI!I!

l!

w 4

DOCKET NO:

50-369 UNIT:

McGuire 1 DATE:

09/15/89 NARRATIVE

SUMMARY

Month: August 1989 McGuire Unit 1 began the month of August operating at 100% full power. At 0146 on 8/13, the unit began a power decrease to 81% per Dispatcher. At 0855 on 8/13, the unit commenced' power increase and reached 100% full power at 1400 on 8/13. The unit operated at or near 100% full power until 8/26 at 0934 when an automatic Reactor trip occurred due to a false indication of low reactor coolant flow. The Reactor reached criticality at 0713 on 8/27. At 1404 on 8/28, the Generator was on-line and the unit commenced power increase. The power increase was halted at 38% at 2100 on 8/28 due to Feedwater Heat Pump "1A" problems.

Power increase commenced at 1202 on 8/29, and the unit reached 100% full power at 2048 on 8/29. The unit operated at 100% full power for the remainder of the month.

Prepared by:

S. W. Moser Telephone: 704-373-5762 1

l l

l

!L- _____- _.

r-L t-

[

t.

MONTHLY REFUELING INFORMATION REQUEST l'

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown: March 1990 3.

Scheduled restart following refueling: May 1990

'4.

Will refueling or resumption of operation thereafter require a techr.ical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, i

unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool: 369 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present l

licensed capacity: August, 2010

)

l l

j DUKE POWER COMPANY DATE:

September 15, 1989 Name of

Contact:

J. A. Reavis Phone: 704-373-7567 1

4

a 1

c.

q N'

\\

'OPERATINS DATA REPDRT L

D0CLET ND 50-370 L

COMPLETED BY P.A. Williams DATE[!eierbst 15; 1989 t

OPERATINS STATUS TELEPHDNE 704-373-59B7,_

1. Unit liase: McBaire 2

'2. Reporting Feriod: August 1, 1929-August 31,1920-3.' Licensed Thettal Pener (MWt):

3411

4. Nameplate R4 ting (Bross MWe):

1305*

Notes *Wateplate Rating-

' 5. Design Electrical Rating (Net MWe):

1180 (Bross MWel calculated as.

6. Maximus Dependable Capacity (Stoss NWe):

1171 1450.000 MVA x.90 power--

L

7. h ximus Dependable Capacity (Net MWe):

1129 factor per Page lii, 8.1f Changes Occur in Capacity Ratings (Iteas Natber 3 Through 71 Since Last NURES-0020.

Repert. Sive Reasons:

9. Pcwer Level.ie Which Restricted, If Any (Net MWe):
10. Reasen For Restrictions, If any:

this Menth Yr.-to-Date Cueulative

11. Hours In Feperting Period 744.0 5831.0 45239.0
12. Number Of Hours Geactor Was Critical 0.0 4416 0 36175.4
13. Eeacter Eeserve Shutdcwn Hours

--0--

--0--

- 14. Hours Ber.erator On-Line 0.0 43B2.8 35441.6

15. Unit Reserve Shutdtwn Hours.

--0--

--0--

16. Gross Thersal Energy Generated (MWH)

'O 13846264 115161968

17. Gross Electrical Energy Eenerated (MWH) 0 464854B 40302430
18. Net Electrical Energy Benerated (MWH)

-5545 4651369 3B641494

19. Unit Service Facter -

0.0 75.E 73.5 20.' Un:t Availability Fatter 0.0 75.2 73.5

21. Unit Capacity factor (Using MDC Net) 0.0 70.7 69.4
22. Unit Capacity Facter (Using DER Net) 0.0 67.8 67.9
23. Unit Forced Dutage Rate 0.0 1.4 10.8
24. Shutcewn Scheduled Over Next 6 Months (Type, Date, and Duratien cf Each):

Nnno

25. If Shut Down At End Of Report Feriod. Estisated Dats of Startup: Spotember 16.14RQ E6. Units In Test States (b ior to Cescercial Operation):

Forecast Achieved INITIAL CElTICALITY INITIAL ELECTRICITY COMMERCIAL 0?ERAi!DN

.m s.

.- +.

1 J,

t, r

. :m g~ ;p< u c, a

=0FERATING.DATAREPORT-

\\ :.

.r

. DOCKET NO

$0-370 p

J UNIT McGuire 2 DATE Sectester 15,1989 C0hPLETED BY ' R. A. Williams

.. TELEPHONE 704-373-5987 l'v.d r,

iMONTH Avaust,1969 l:

_Rj AVERABE DAILY POWER. LEVEL

.. If AVERAGE DAILY PDWER LEVEL LD (MWe-Net)

(MWe-Net).

1 0

17 0

-2<

0-

.1B 0-3' 0

19 0-

.i.-

14-0 20

'0 f

0 21 0

t6

' 0' E2 0'

7 0

23 0

B-0 24 0

9-0 25 0

10 0

26 0

11.

0 27 0

12-0 EB 0

13 0

29 0

14 0

30 0

i5 --

0 31 0

16-0-

..m___.L_m_.-____

_2________.

5 h_0

)

I C

- at rG 7I 4_

T N

G reoE 3U1

- QL C

E N

G a e pR 0C9 2,

E~

R I

ph eU 5 M_O_S_i_

ROR L

t eSRN RTU E

i r

(

O C

U b P 'y t rne

.EEYE CNE F

i OMTBN OR E

h rt el NAA O

DI R

xonvi NDDH NTT EfEEF

)

TL EP ACN 5

4 ET TE AE

(

kI E L E

V E

CN L E S

E L

OU P T U

R C

M A

P Y

D -

O C

C m)

C an F

ri O

mt a aSl D

r-p N

ccx E

SiE

.t(

S l l a aamr N

O T

d uuoe I

N X

onnth E

X h aaut T

)

C 9

5 NE L

t MMAO U

8 OD E

e-(

M1 234 D

9 PO U

)

MC F

3 E

1 R

O

(

t C

L

~

R s

E u

E W

g S MD C

i

)

O u

4 Y EO R

t S TC A_

P

(

D i

N A

E S

T S

NT R E

N EN O W

H CE PO

)

O T

I V EN n

D N

LE R i

T O

a U

M l

H T N p

ni TD - U WX x

oL S

T

)

E R

3EOFH O/

1 i

( t t &

T O

MHOS DR

(

I P

s c

ee ig N

E

)

U R

2 C

rt rn REASON u

ti

~

(

l r sn io ei N

0 a

Ra O

0 Fe c

yTa I S TR 4

t ngr AU 4

nanort r RO 7

enit oso(

UH mel ati pt el anar D-ninuurire ouif gemeh sqaeepd pt

)

1 TYPE S

aEMRROAO e-(

RABCDEFGH

)

2 1

(

E 8

d T

e A

l D

9 d u 8

ed ce rh oc FS NO 4

FS

)

1

(

l I

t DOCKET NO:

50-370 UNIT:

McGuire 2 DATE:

09/15/89 NARRATIVE

SUMMARY

Month: August 1989 McGuire Unit 2,was out of service for the entire month of August for its End of Cycle 4 Refueling Outage.

1 l

Prepared by:

S. W. Moser Telephone: 704-373-5762 l

g k:

r.-.

b I

.]

MONTHLY REFUELING INFORMATION-REQUEST i

1,, Facility:name: 'McGuire, Unit 2 D

- 2..DScheduled next~ refueling shutdown:

Currently Refueling

3, Scheduled restart following refueling

September 1989

. 4.

Will. refueling'or resumption of-operation thereafter require a technical

~ specification change or other license amendment? N_oo

.If yes, what will these be?

If no,lha's reload design and, core configuration been reviewed by Safety Review. Committee regarding unreviewed safety questions? N/A

- 5. : Scheduled date(s) for!. submitting proposed licensing. action and supporting

~

-information: N/A.

6.

,Important licensing considerations (new or different design or supplier,

-unreviewed design or performance analysis methods, significant changes in

. design or'new operating procedures).

. 7.

Number. of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool:

590 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

- 9.

Projected date' of last refueling which can be accommodated by present licensed capacity: August, 2010 l

DUKE POWER COMPANY DATE:

September 15, 1989 Name of

Contact:

J. A. Reavis Phone: 704-373-7567 a

-_ _ _ _. _ _ - - _