ML20247M818
| ML20247M818 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/16/1989 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20247M823 | List: |
| References | |
| NUDOCS 8904060130 | |
| Download: ML20247M818 (2) | |
See also: IR 05000321/1989003
Text
_ _ _ _ . _
_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _
e
"
.
MAR 161989
Docket Nos. 50-321, 50-366
Georgia Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 1295
Birmingham, AL 35201
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-321/89-03 AND 50-366/89-03
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
David Ward on February 13-17, 1989.
The inspection included a review of
1
activities authorize ('
for your Hatch facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
,
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
i
Sincerely,
CIA 1tw. G Mc
6%}4% y
.
Caudle A. Julian, Chief
!
Engineering Branch
l
Division of Reactor Safety
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
g4060130g90316
ADOCK 05000321
O
PNU
l i
S/
, _ _ _ _ _ _ _ _ _ _ _
. _ _ _ _ _ - - _ _ _
_
__ .
_ _ _ .
.
'
MAR 16 :888
.
Georgia Pow'er Company
2
cc w/ enc 1:
R. P. Mcdonald, Executive Vice President,
Nuclear Operations
J. T. Beckham, Vice President, Plant Hatch
H. C. Nix, General Manager, Plant Hatch
0. M. Fraser, Site Quality Assurance
Manager
L. T. Gucwa, Manager, Nuclear Engineering
and Licensing, Plant Hatch
S. B. Tipps, Manager of Nuclear
Saf'ty and Compliance
State of Georgia
bec w/ encl:
L. P. Crocker, NRR
M. V. Sinkule, RII
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
f
A. Krasopolis, RI
J. Ulie, RIII
J
J. Singh, RIV
i
C. Ramsey, RV
I
,
- s,
RIIgyp,
RII
RI
j
ipDWard:tj
TConlon
MSinkule
I 03/p/89
03g /89
03/p(/89
_-
._ _- ___ .__- - _____ A