ML20247M204
| ML20247M204 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/19/1998 |
| From: | Murray B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Randolph G UNION ELECTRIC CO. |
| Shared Package | |
| ML20247M210 | List: |
| References | |
| 50-483-98-10, NUDOCS 9805260199 | |
| Download: ML20247M204 (5) | |
See also: IR 05000483/1998010
Text
_ _ - _ _ _ _ _ _ _ _ _ - - _ . _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ - - _ _ _
l-
!
I
/j D" "' %
f
g
,
.\\
NUCLEAR REGULATORY COMMISSION
.
l
'
REGION IV
8
611 RY AN PLAZA DRIVE. SUITE 400
, .*
1
' *
.8
AR LINGTON, TE X AS 76011 8064
9 '****
May 19, 1998
Garry L. Randolph, Vice President and
Chief Nuclear Officer
Union Electric Company
,
P.O. Box 620
'
Fulton, Missouri 65251
SUBJECT: NRC INSPECTION REPORT 50-483/98-10
Dear Mr. Randolph:
From April 28-30,1998, an announced, reactive inspection was conducted at your Callaway
Plant reactor facility. The enclosed report presents the scope and results of that inspection.
Following the emergency preparedness inspection of March 24-26,1998, you initiated a
contingency plan to correct problems identified with emergency response organization staffing
and response times. The purpose of this inspection was to review the implementation of your
contingency plan with special emphasis on training and qualification of your emergency
response organization.
!
It is our understanding that during the exit meeting on April 30,1998, you stated Union Electric
Company will verify that no credit was given for requalification for personnel evaluating /
controlling drills and exercises unless they performed this function for their assigned emergency
{
response position or a functionally equivalent position. This verification will be completed for
each duty section (team) prior to the 30-45 minute response personnel assuming interim duty
responsibilities.
3
in addition, you stated that Union Electric Company willincorporate the enhancements
discussed in Section P5. Please confirm these regulatory commitments in writing within 30 days
of the date of this letter.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
!
Sincerely,
!
h
Blaine Murray, Chief
k
Plant Support Branch
Division of Reactor Safety
9805260199 980519
ADOCK 05000403
G
pyg
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- _ -
- _ _ _ _ - _ _ - _ _ _ _
. - _ _ _ _ _ _ - -
_
_ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ .
.
.
Union Electric Company
-2-
Docket No.:
50-483'
License No.: NPF-30
l
Enclosure:
NRC inspection Repost
50-483/98-10
cc w/ enclosure:
Professional Nuclear Consulting, Inc.
19041 Raines Drive
Derwood, Maryland 20855
Gerald Charnoff, Esq.
Thomas A. Baxter, Esq.
Shaw, Pittman, Potts & Trowbndge
2300 N. Street, N.W.
Washington, D.C. 20037
l
H. D. Bono, Supervising Engineer
Quality Assurance Regulatory Support
Union Electric Company
,
l
P.O. Box 620
!
Fulton, Missouri 65251
Manager- Electric Department
i
Missouri Public Service Commission
301 W. High
P.O. Box 360
,
'
Jefferson City, Missouri 65102
- Ronald A. Kucera, Deputy Director
l
Department of Natural Resources
l
P.O. Box 176
Jefferson City, Missouri 65102
Otto L. Maynard, President and
Chief Executive Omcer
i
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
)
Burlington, Kansas 66839
1
I
,
I
l
.
_-
__ _ _ _ _ _ _ _ - .__ . _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
___ ______
.
.
Union Electric Company
-3-
Dan 1. Bolef, President
Kay Drey, Representative
Board of Directors Coalition
for the Environment
6267 Delniar Boulevard
University City, Missouri 63130
Lee Fritz, Presiding Commissioner
Callaway County Court House
10 East Fifth Street
Fulton, Missouri 65151
Alan C. Passwater, Manager
Licensing and Fuels
AmerenUE
One Ameren Plaza
1901 Chouteau Avenue
P.O. Box 66149
St. Louis, Missouri 63166-6149
J. V. Laux, Manager
Quality Assurance
Union Electric Company
P.O. Box 620
l
Fulton, Missouri 65251
l
!
l
!
l
l
,
-
- - _
_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ .
_
_ _ _ _
_ _ _ _ _ .
- - - - - - _ - . - - _ - - - - _ _ - - - - - _ _ - - - _ - - - - - - - _ . _ - , - _ _ _ - - - _ _ - - _ _ _ - - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _
___
. _ _ _
i -
l
'
.
I
Union Electric Company
-5-
!
'
i
i
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
DCD (IE35)
bec distrib. by RIV:
Regional Administrator
Callaway Resident inspector
DRS Director
DRS Deputy Director
DRP Director
DRS-PSB
,
Branch Chief (DRP/B)
MIS System
Project Engineer (DRP/B)
RIV File
Branch Chief (DRP/TSS)
DRS Action item (98-G-79)(Goines)
'
l
J
l
DOCUMENT NAME: R:\\ _CVWCW810RP.THA
To receive copy of document, Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
,
.
l
RIV:PSB
E
C:DRP\\B
C:DRS\\PSR
THAndrews:nh ,Nk WBJohnsot)
BMurray D
05/#98
05/gV98
056498
"
OFFICIAL R$ CORD COPY
(
w
_ - _ _ _ _ _ _ - _ _ - _ _ - _ _ _ _ _ _ - _ _ _ - _
. _ _ _ _ - _ _ _ _
_ _ _ _ _ _ _ _ - _ _ _ _
.
!
.
Union Electric Company
-5-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
DCD (IE35)
bec distrib. by RIV:
Regional Administrator
Callaway Resident inspector
DRS Director
DRS Deputy Director
DRP Director
DRS-PSB
Branch Chief (DRP/B)
MIS System
Project Engineer (DRP/B)
RIV File
Branch Chief (DRP/TSS)
DRS Action item (98-G-79)(Goines)
l
l
l
l
I
l
DOCUMENT NAME: R:\\._CVWCW810RP.THA
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" a No copy
.
RIV:PSB
E
C:DRP\\B I
C:DRS\\PS 5
THAndrews:nh ,% WBJohnsor)
BMurray W
l
"
05/p/98
05/gV98
056498
OFFICIAL 4aCORD COPY
l
>G0005
/
J