ML20247M102
| ML20247M102 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/18/1998 |
| From: | Murray B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hutchinson C ENTERGY OPERATIONS, INC. |
| References | |
| NUDOCS 9805260171 | |
| Download: ML20247M102 (4) | |
Text
_ _ _ _ _ _
19 "80 UNITED STATES 9I y
, ;; g NUCLEAR REGULATORY COMMISSION
-g REGION IV
,f 611 RYAN PLAZA DRIVE. Sulf E 400
+9
/
AR LINGTON, T E X AS 760114064 fiay 18,1998 C. Randy Hutchinson, Vice President Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, Arkansas 72801-0967
SUBJECT:
EMERGENCY PLAN CHANGES
Dear Mr. Hutchinson:
This letter acknowledges receipt of Emergency Plan Implementing Procedure 1903.010,
" Emergency Action Level Classification," Revision 34 PC-1, submitted under the provisions of 10 CFR 50.4 and 10 CFR Part 50, Appendix E.,Section V.
S?
During a phone call on May 13,1998, Mr. Randy Gresham confirmed that your review determined that the changes did not reduce the effectiveness of the emergency plan. Based on your determinations thatthe changes do not decrease the effectiveness of your emergency plan, and that the plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to Part 50, NRC approvalis not required. Our initial review of these changes indicates that the changes are in accordance with 10 CFR 50.54(q). Implementation of these changes will be subject to inspection to confirm that they have not decreased the effectiveness of your emergency plan and continue to meet regulatory requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.
Should you have any questions conceming this letter, please contact Mr. Tom Andrews of my staff at (817) 860-8242.
Sincerely, Blaine Murray, Ciief f
Plant Support Branch
(_.,
l Division of Reactor Safety /
Docket Nos.: 50-313 50-368 License Nos.: DPR-51 i
I NPF-6 9805260171 980518 PDR ADOCK 05000313 PDR I
Entergy Operations, Inc. cc:
Executive Vice President
& Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995
' Jackson, Mississippi 39286-1995 i
Vice President Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286 i
Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn 1400 L Street, N.W.
Washington, D.C. 20005-3502 David D. Snellings, Jr., Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, Arkansas 72205-3867 Manager Rockville Nuclear Licensing Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852
Entergy Operations, Inc. DISTRIBUTION:
DMB (AO45)
Regional Administrator ANO Resident inspector DRS Director DRS Deputy Director DRP Director 4
Branch Chief (DRP/C)
Project Engineer (DRP/C)
DRS-PSB Branch Chief (DRP/TSS) l MIS System I
RIV File DRS Action item File (2)(98-E-0022)(Hodges)
DOCUMENT NAME: G:\\DRSLTRS\\EP.MLD%N9804EP. LOO TAC #X03437 To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PSB E
C:DRS\\PSB THAndrews:nh % BMurray h 05A9(98 05/GQ8 W
OFFICIAL RECORD COPY
l l
t s
Entergy Operations, Inc. l D STrintITION:
f
$31$5) 13.5 Regiona! Administrator ANO Resident inspector DRS Director DRS Deputy Director DRP Director Branch Chief (DRP/C)
Project Engineer (DRP/C)
DRS-PSB Branch Chief (DRP/TSS)
MIS System RIV File DRS Action item File (2)(98-E-0022)(Hodges)
[
-l
/
.,O 1
l DOCUMENT NAME: G:\\DRSLTRS\\EP.MLD\\AN9804EP.L00 TAC #X03437 To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PSB E
C:DRS\\PSB THAndrews:nh % BMurray h 05M98 05/QQ8 W
OFFICIAL RECORD COPY
' GOC 1A e
__