ML20247L178

From kanterella
Jump to navigation Jump to search
Informs That Author Writing to Confirm B&Wog Participation in 980612 Briefing in Rockville,Md to Brief Commissioners About Owners Groups,Organization,Budget,Objectives, Activities & Recent Successes
ML20247L178
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/15/1998
From: Sheron B
NRC (Affiliation Not Assigned)
To: Hutchinson C
BWR OWNERS GROUP, ENTERGY OPERATIONS, INC.
References
NUDOCS 9805220330
Download: ML20247L178 (6)


Text

_ _ _ _ _ _ _ _ _

goneuqk UNITED STATES p

g j

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2006H001

%...+/

fty 15,1998 C. Randy Hutchinson, Chairman B&WOG Executive Committee Vice President Operations Arkansas Nuclear One Entergy Operations, Inc.

1148 S.R. 333 P.O. Box 1439 Russellville, AK 72801-0967

Dear Mr. Hutchinson,

I am writing to confirm the Babcock & Wilcox Owners Group (B&WOG) participation in a forthcoming briefing to the Commissioners of the U.S. Nuclear Regulatory Commission, and to provide background and guidance for the briefing.

The briefing is currently scheduled for 10:00 - 11:30 on June 12,1998, in the Commissioners' Conference Room on the first floor of the White Flint One building.

As I discussed with you, the purpose of the briefing is to inform the Commissioners about the Owners Groups, their organization, budget, objectives, activities, recent successes, relationship with other Owners Groups, NEl, etc., and your presentations should address these areas as appropriate.

Although I am writing to you in your position as chairman of the B&WOG, I recognize that your Owners Group organizational structure provides for executive oversight, etc. Hence, I will leave it up to each Owners Group to select the one individual who will represent them at the briefing table. I would encourage you to talk with your counterparts in the other Owners Groups to ensure consistency in the level of representation from each Owners Group, as well as presentation information. Enclosure 1 is a list of the other Owners Group Chairmen for your j

information.

This Commission briefing is scheduled to be completed in 1% hours. I will be at the briefing table and will give about a 10-12 minute presentation on the NRC's perspective. I suggest that

}-

each Owners Group representative plan on a briefing of no more than about 10-12 minutes 3

duration each (this translates to about 5-6 slides). This should allow about 30 minutes for questions and answers.

I am enclosing as Enclosure 2 for your information and use, guidelines for presentations to the Commission. Note that you should identify the speaker by May 26,1998, and provide 20 copies of your slides by June 5,1998.

tb h[hf C/hP $ ' I O bfbJ gag a.

9805220330 980515 PDR ADOCK 05000313 P

PDR

C. Hutchinson !

I appreciate your willingness to take time out of your schedule to participate in this briefing. I believe that the Owners Groups are playing an increasingly important role in proactively addressing potential safety issues that arise, and I believe it is appropriate that the Commission be informed of these activities.

f if you have any questions, please feel free to call me at (301) 415-1274 or e-mail me at bws@nrc. gov. I will probably contact you regarding any last minute details prior to the meeting.

Sincerely, I

d4A AfA %

Brian W. Sheron, Acting Associate Director for Technical Review Office of Nuclear Reactor Regulation

Enclosures:

As stated cc: Mr. R. B. Borsum, Manager Rockville Licensing Operations Framatome Technologies, Inc.

1700 Rockville Pike, Suite 525 Rockville, MD 20852-1631 l

l l

m*

s

i LC. Hutchinson,

l' appreciate your willingness to take time out of.your schedule to participate in this briefing. I believe that the Owners Groups are playing an increasingly important role in proactively addressing potential safety issues that arise, and i believe it is appropriate that the Commission be informed of these activities. L if you have any questions,' please feel free to call me at (301) 415-1274 or e-mail me at bws@nrc. gov. ' I will probably contact you regarding any last minute details prior to the meeting.

. Sincerely, Orginial' signed by.

Brian W. Sheron,~ Acting Associate Director for Technical Review Office of Nuclear Reactor Regulation

Enclosures:

As stated cc: Mr. R. B. Borsum, Manager Rockville Licensing Operations Framatome Technologies, Inc.

1700 Rockville Pike, Suite 525 Rockville, MD 20852-1631 Distribution Central File PUBLIC PGEB R/F -

OPA ACRS OGC SCollins FMiraglia BSheron BBoger JRoe DMatthews - TEssig FAkstulewicz JBirmingham WHill, SECY JBlaha, EDO GTracy, EDO Document Name: g:\\jlb\\comm-mtg.ltr Office PGEB fjf. A PQEgV,A/

(A)C:PGEB (A) y (A)AbT)RR -

3

^

Name.

JBirmin[am[sw-Edgflewicz TEssig /@6 JRok BShe@

l i

Date 5/ 7 /98-SP//98 5/7/98 5A /98 5//[/98 l

' OFFICIAL OFFICE COPY l

1 OWNERS' GROUP _ CHAIRMEN cc:

Lou Liberatori, Chairman WOG Steering Committee Consolidated Edison Co. Of NY Indian Point Unit 2 Broadway & Bleakley Avenue Buchanan, NY 10511 (914) 734-5676 David Piimer, Chairman CE Owners Group San Onofre Nuclear Generating Station 14300 Mesa Road San Clemente, CA 92672 (714) 368-1486 Thomas J. Rausch, Chairman Boiling Water Reactor Owners' Group Commonwealth Edison Company Nuclear Fuel Services 1400 Opus Place,4th Floor ETWill' Downers Grove, IL 60515 (630) 663-3020 C. Randy Hutchison, Chairman B&WOG Executive Committee Vice President Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 P.O. Box 1439 Russellville, AK 72801-0967 (501) 858-4888 l

l l

l.

I

1.

GulDELINE&EORERESENTATIONSJOJHE. COMMISSION l.

This Commission meeting is scheduled for approximately 1% hours. Since there will be several other speakers and the Commission prefers time for questions following each presentation, please limit your prepared presentation to 10 to 12 minutes. If your formal statement would require more time, please submit it in writing for the record and summarize it within 10 to 12 minutes.

If someone other than yc'Jrself is the principal speaker, please provide his or her name and title to Mr. William Hill of th'. Gfice of the Secretary by Tuesday, May 26. Bill Hill can be reached at 301-415-1661, facsimile 301-415-1672, or e-mail wmh@nrc. gov.

The Commission meeting facility has a sophisticated television graphics system. For optimum use, please follow the enclosed guidelines for preparing your briefing visuais. The system is unique, and you should follow the enclosed instructions closely. Should you require additional information on the fosmat for your view graphs, please contact us. Our experience suggests i

i that it is desirable to preview your visuals on our system several days prior to the meeting if possible.

Normally we anticipate that a member of your party famili3r with your presentation will be in our Audiovisual Room to display your visuais. If this is not possible, we require a copy of your full written presentation and visuals as discussed below. One set of the text and visuals should be appropriately marked to indicate when your speaker desires each visual to be displayed. Your cooperation in this matter is requested so we can provide smooth coordination between the speaker and the graphics display.

Please provide 20 advance copies of your prep:: red statements, outlines, viewgraphs, and handouts by Friday, June 5. This should be proviud to Bill Hill of the Office of the Secretary, if possible, you may send an eledronic version (Power Point version 4 (black and white only),

Wordperfect, etc.) via e-mail to Mr. Hill. We also require approximately 90 copies of your material at the meeting for members of the public. If you are ur.sbie to provide these copies, or would like help with them, please advise us.

l As you may be aware, our office is located adjacent to the White Flint Motro Station on Rockville Pike. There is reserved visitor parking for Commission guests in the building garage.

Entrance is at the rear of the building. Please check with the security staff at the entrance to the garage when you arrive. If you plan to use the reserved parking, it would be helpful if you notify us in advance.

l l

lE____._________________________

4 4

GENERAL GUIDELINES FOR VIEWGRAPHS 1.

Arrange all visuals in a 3 by 4 configuration (e.g.,3 units in the y-axis and 4 units in the x-axis). This will confirm your visuais to the 3 by 4 te;evision monitors.

2.

Limit your alphanumeric script to 13 lines ve.; cal and 40 characters horizontal per lines.

r 3.

Type sizes are BOLD 30-point fcr titles and no less than BOLD 20-point for body text.

Use no less than BOLD 24-point for body text if tower case letters are used.

4.

Maximum image area of 6-(vertical) by 8-inch (horizontal) on 8.5 x 11 sheet of paper.

5.

It may be helpful to number the viewgraphs.

i l

t 1

- - - - - - - -