Forwards Insp Repts 50-317/98-02 & 50-318/98-02 on 980315-0418 & Nov.Violations Re Failure to Ensure That Spare EDG Governor Was Properly Stored in Warehouse
ML20247L137
Person / Time
Site: Calvert Cliffs  
Issue date: 05/14/1998
From: Doerflein L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20247L141 List:
References
50-317-98-02, 50-317-98-2, 50-318-98-02, 50-318-98-2, NUDOCS 9805220321
Download: ML20247L137 (3)


See also: IR 05000317/1998002

Text

N

,*

.-

May 14, 1998

Mr. Charles H. Cruse

Vice President - Nuclear Energy

Baltimore Gas and Electric Company (BGE)

Calvert Cliffs Nuclear Power Plant

1650 Calvert Cliffs Parkway

Lusby, MD 20657-4702

SUBJECT:

NRC REGION 1 INTEGRATED INSPECTION REPORT NOS. 50-317/98-02

. AND 50-318/98-02 AND NOTICE OF VIOLATION

Dear Mr. Cruse:

This report transmits the findings of the safety inspection conducted by NRC inspectors at

the Calvert Cliffs Nuclear Power Plant from March 15,1998 to April 18,1998. The

enclosed report presents the results of that inspection. At the conclusion of the

inspection, these findings were discussed with Mr. Katz and others of your staff.

Overall, the NRC concluded that your facility was operated in a safe manner. During the

period, good control of plant operations was observed. A Unit 1 reactor shutdown and

cooldown for a refueling outage were completed in a well controlled, conservative manner. , _

Unit 1 was taken to the reduced inventory condition for installation of steam generator

nozzle dams in a careful, deliberate manner with good attention to safety. Thorough and

detailed pre-evolution briefings were a strength of the observed operations.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice)

and the ' circumstances surrounding it are described in detail in the subject inspection

report. ' The violation was identified by the NRC and involved a failure to ensure that a

spare emergency diesel generator governor was properly stored in the warehouse. The

failure of the governor when installed in the 1B emergency diesel generator contributed to

Unit 1 exceeding a Technical Specification Limiting Condition for Operations.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notica when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

i

I

'

5220321 980514

p

G

05000317

!

A

PDR

,

220053

,

0FFICIAL RECORD COPY

IE:01-

I

l.

_ _ _ _ _ _ _ _ _ _ _ _

_-

.-

.

Charles H. Cruse

2

[

In accordance with 10 CFR 2.790 of the NRC's "Ruies of Practice," a copy of this letter,

!

its enclosure (s), and your response will be placed in the NRC Public Document Room

(PDR).

Sincerely,

Original Signed by:

Lawrence T. Doerflein, Chief

Projects Branch 1

Division of Reactor Projects

Docket / License ?bs.:

50-317/DPR-53

50-318/DPR-69

Enclosures

1. Notice of Violation

2. N9C Region 1 Integrated Inspection Report Nos. 50-317/98-02

and 50-318/98-01.

cc w/encis:

T. Pritchett, Director, Nuclear Regulatory Matters (CCNPP)

R. McLean, Administrator, Nuclear Evaluations

J. Wa!ter, Engineering Division, Public Seivice Commission of Maryland

K. Burger, Esquire, Maryland People's Counsel

R. Ochs, Maryland Safe Energy Coalition

State of Marylend ;2)

!

_ - - _ _ _ _ _ - _ _ _ _ - - _ _ _ _ _ - _ _

_ _ _ _ _

..

'

,

Charles H. Cruse

3

Distribution w/encis:

H. Miller, RA/W. Axelson, DRA (1)

Nuclear Safety information Center (NSIC)

PUBLIC

NRC Resident inspector

Region i Docket Room (with concurrences)

L. Doerflein, DRP

R. Junod, DRP

Distribution w/encis: (VIA E-MAIL)

B. McCabe, RI EDO Coordinator

S. Stewart - Calvert Cliffs

S. Bajwa, NRR

A. Dromerick, NRR

M. Campion, RI

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

F. Talbot, NRR

DOCDESK

1

DOCUMENT NAME: G:\\ BRANCH 1\\CC980202. INS

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment / enclosure

"E" = Copy with attachment / enclosure

"N" = No copy

OFFICE

Rl/DRP

Rl/DRP

f

NAME

SStewart y74) & LDoerflein ,97h)

DATE

05/14/98

U

05/aq/98

OFFICIAL RECORD COPY

!