ML20247L128

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/89-10 on 890327-0406.No Violations or Deviations Noted
ML20247L128
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/23/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20247L132 List:
References
NUDOCS 8906020093
Download: ML20247L128 (2)


See also: IR 05000458/1989010

Text

. _ . _ .

>

,

i,

..

e

,

MAi 2 31989

In Reply Refer To:

l

Docket: 50-458/89-10

,w

Gulf States Utilities

ATTN: Mr. James C. Deddens

Senior Vice President (RBNG)

P.O. Box 220

.

St. Francisville, Louisiana 70775

s

.

Gentlemen:

,

,

This refers to the-inspectfon conducted by Messrs. H. W. Kerch, R. H. Harris,

and M. A. Oliveri of the our Region I office during the period March 27

&

through April 6,1989, of activities authorized by NRC Operating License NPF-47

for River Bend Station, and to the discussion of our findings with you and

,

other members of your staff at the conclusion of the inspection,

u

Areas examined during the inspection included independent measureneents using

the mobile nondestructive examination laboratory of inservice inspection and

plant modification activities. Within this area, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The A pecticn findings cre

documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were identified.

One unresolved item involving quality surveillance of nondestructive examination

contractors.is identified in paragraph 3.0 of the enclosed inspection report.

The inspection also identified a concern about the high radiation levels around

the biological shield wall.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with~you.

Sincerely.

0AA

YSIELV

L. J. Callan, Director

Division of Peactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-458/89-10

$

I, N

cc w/ enclosure:

(seenextpage)

)

yW)

/Mi

RIV:RI:MQP

-

C:MQPS-

Dt0R$j

D: RP

LGilbert/c

IBarn s

/NL911hoan

LJCallan

f/%/89

f#4/89

f/f/89

8 /JS/89

BC"

8906020093 870523

PDR

ADOCK 05000458

,(

G

PNU

- . - _ .

_ _ - _ _

-

. _ _ _ -

--

..

.

- . -

_

,

.

.

.

p.

<

.(.+

L

LGulf States Utilities

-2-

cc w/ enclosure:

-g

Gulf-States Utilities

~

'

ATTN:

J. E. Booker, Manager-

a

'

River Bend Oversight

P.O. Box 2951

Beaumont, Texas 77704

'

Gulf States Utilities

.

ATTN:

Les England, Director

Nuclear Licensing - RBNG

P.O.- Box 220

St..Francisville, Louisiana 70775

Louisiana State University,

Government Documents Department

Louisiana-Radiation Control Program Director

bec to DMB (IE01)

bec.distrib. by RIV:

  • DRP
  • RRI
  • R. DL Martin, RA
  • Section Chief (DRP/C)

List Shea,RM/ALF

  • MIS' System
  • RPB.DRSS-
  • RSTS Operator
  • Project Engineer (DRP/C)
  • RIV File
  • W. Paulson, NRR Project Manager (MS:

13-D-18)

  • DRS
  • L. Gilbert
  • I.

Barnes

l

T. Martin, RI

l

H. Kerch, RI

  • w/766

l

l

l

l

l

_ _ _ _ _ _ _ _ _ _ - - _ _ _ .