ML20247K964
| ML20247K964 | |
| Person / Time | |
|---|---|
| Site: | 07000925 |
| Issue date: | 01/31/1989 |
| From: | Wical S OAK RIDGE ASSOCIATED UNIVERSITIES |
| To: | France G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20247K899 | List: |
| References | |
| NUDOCS 8904050362 | |
| Download: ML20247K964 (1) | |
Text
I 1
1 i
Oak Ridge f.iarpowe' Ecuca' c^
Associated Post Office 80x 117 Resea cn ac T anng Universities Oak Ridge. Tennessce 37831-0117 D,v'sion January 31, 1989 i
l
,Mr. George France Region III i
Nuclear Regulatory Commission 799 Roosevelt Road 1
Glen Ellyn, Illinois 60137 i
Subj ect:
INTERIM REPORT CONFIRMATORY SURVEY OF PORTIONS OF THE SEQUOYAH FUELS CORPORATION CIMARR0N PLANT
Dear Mr. France:
i
)
Enclosed is a copy of the interim report for our survey of 6 areas of the l
l Plutonium Facility and Former Burial Ground Area at the Sequoyah Fuels J
l Corporation Cimarron Plant. This data covers the portion of the property surveyed in August 1988; the remainder of the property will be surveyed as decontamination is completed and the final survey data are developed by the licensee. As evident from this report there are small areas of residual contamination, which we feel warrant further attention.
Questions concerning this information should be referred to me at FTS 626-5073 or James Berger at FTS 626-3305.
Sincerely, k
Scott A, Wical Health Physics Team Leader Radiological Site Assessment Program SAW: mec cc:
L. Rouse, NRC/6H3 l
D. Hurt, NRC/6H3 l
D. Tiktinsky, NRC/6H3 C. LaRoche, NRC/6H3 A. Davis, NRC/ Region III l
4 I
i
?>$9[ SAMU C
i