ML20247K895

From kanterella
Jump to navigation Jump to search
Forwards Oak Ridge Assoc Univs Interim Rept on Confirmatory Survey of Pu Facility & Burial Ground Area at Cimarron Site
ML20247K895
Person / Time
Site: 07000925
Issue date: 03/24/1989
From: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Stauter J
CIMARRON CORP.
Shared Package
ML20247K899 List:
References
NUDOCS 8904050345
Download: ML20247K895 (1)


Text

.

l, 1 MAR 2 4 Igsg Docket No. 70 925 Cimarron Cooperation ATTH: Dr. J. C. Stauter, Director  ;

Huclear Licensing and Regulation '

P.O. Box 25861 Kerr.ficGee Center Oklahoma City, OK 73125 Gentlemen:

l Our contractor, Oak Ridge Associated Universities, has prepared an  !

interim report on their confirmatory survey of the Plutonium Facility and the f burial ground area at the Cimarron site. A copy of the report is enclosed for- 1 i

your information, j Sincerely, j

Grismi Sisud b Leland C. Rouse, Chief Fuel Cycle Safety Branch i Division of Industrial and 1 Medical Nuclear Safety I Office of Nuclear Material.

Safety and Safeguards

Enclosure:

ORAU~ Interim Report cc: Dale McHard, Oklahoma State Department of Health l "is li>ui. iun; W/ enc i . ,, l Docket No: 70 925 PDR NRC File Center MAF R/F IMSB R/F w/o bcl'.: JJSwift LCRouse GFrance, RIIJ Ptoysen RDHurt JBerger(0RAU) FLBrown GCComfort

.. m n n su 0FC :- IMAF g / :IAI l- :I[ J._ ep : IM NAME: RDHi.rt:lg  :

rown :j$difd  : b DATE: 03/23 /89 :03/ 9 :03hW88 :03 /89 0FFICIAL RECORD COPY s 89040so345 890324 '

{DR ADOCK 0700o925 ,

PDC l