ML20247K895

From kanterella
Jump to navigation Jump to search
Forwards Oak Ridge Assoc Univs Interim Rept on Confirmatory Survey of Pu Facility & Burial Ground Area at Cimarron Site
ML20247K895
Person / Time
Site: 07000925
Issue date: 03/24/1989
From: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Stauter J
CIMARRON CORP.
Shared Package
ML20247K899 List:
References
NUDOCS 8904050345
Download: ML20247K895 (1)


Text

.

l, 1

MAR 2 4 Igsg Docket No. 70 925 Cimarron Cooperation ATTH: Dr. J. C. Stauter, Director Huclear Licensing and Regulation P.O. Box 25861 Kerr.ficGee Center Oklahoma City, OK 73125 Gentlemen:

l Our contractor, Oak Ridge Associated Universities, has prepared an interim report on their confirmatory survey of the Plutonium Facility and the f

1 burial ground area at the Cimarron site. A copy of the report is enclosed for-i your information, j

Sincerely, j

Grismi Sisud b Leland C. Rouse, Chief Fuel Cycle Safety Branch i

Division of Industrial and 1

Medical Nuclear Safety I

Office of Nuclear Material.

Safety and Safeguards

Enclosure:

ORAU~ Interim Report cc: Dale McHard, Oklahoma State Department of Health l

"is li>ui. iun; W/ enc i.

l Docket No: 70 925 PDR NRC File Center MAF R/F IMSB R/F w/o bcl'.: JJSwift LCRouse GFrance, RIIJ Ptoysen RDHurt JBerger(0RAU)

FLBrown GCComfort n

su m n l-0FC :- IMAF g /

IAI
I[

J._ ep : IM b

j$difd NAME: RDHi.rt:lg rown DATE: 03/23 /89
03/

9

03hW88
03

/89 0FFICIAL RECORD COPY s

89040so345 890324

{DR ADOCK 0700o925 l

PDC

,