ML20247K779
| ML20247K779 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/11/1989 |
| From: | Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20247F581 | List: |
| References | |
| MP-13493, NUDOCS 8909220017 | |
| Download: ML20247K779 (1) | |
Text
-
i 1
a l
ST UTILITIES o.ner.i otrice.. s.ieen sir.et. Berlin, Connecticut l
THE COss'dChcVT MO.4f AsvD 80*E' COMPA*ev J
mre
.n c arves necta.c cou a' P.o. Box 270
.avas mana.owa co**"'
HARTFORD. CONNECTICUT 06141-0270 L
L J C,', "jU.,
,'5",',',
(203) 665-5000 2
l 1
September 11, 1989 l
MP-13493 V
t 1
l J
Re: 10CFR50.71(a) l U.S.
Nuclear Regulatory Commission 1
Document Control Desk Washington, D.C.
20555 l
Reference:
Facility Operating License No. NPF-49
)
Docket No. 50-423 I
I
Dear Sir:
In accordance with reporting requirements of technical specifica-tions Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 89-09 covering operation for the month of August is hereby forwarded.
Please be advised that the change in both Maximum Dependable Capacity (Gross Mwe) and Maximum Dependable Capacity (Net Mwe) were effective December, 1988. Previous reports should reflect this change.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY o / ut GO S
en E.
Scace Station Superintendent Millstone Nuclear Power Station Attachment cc: W.T. Russell, Region I Administrator W.J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1,2 & 3 D.H. Jaffe, NRC Project Manager, Millstone Unit No. 3 s
(~909220017 890911 ADOCK 05000423 h"V PDR R
pm 9