ML20247F577
| ML20247F577 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/31/1989 |
| From: | Elms A NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20247F581 | List: |
| References | |
| NUDOCS 8909180216 | |
| Download: ML20247F577 (4) | |
Text
___ _____ _ _ _ _ _ _ _ _ _ _ _ _
t t488III NRC CPERATING STATUS REPORT COMPLETED BY REACTOR ENGINEERING ttI4IIi 1.
DOCKET.... 50-423 DPERATINS STATUS L REPORTINS PER100...Ad6uST 1989 DUTAGE + ONLINE HOURS... 0.0
+ 744.0 = 744,0
- 3. UTILITY CONTACT.................A. L. ELMS 203-444-5388 88Ii!IIIitiIt 4.
LICENSED THERMAL P0WER.........................................
3411 8 MILLSTONE $
- 5. NAMEPLATE RATING (GROSS MWE)...................................
1,253 MW t UNIT 3 4
6.
DESIGN ELECTRICAL RATINS (NET MWE).............................
1,153.6 8***Ii48tiIIt 7.
MAXIMUM DEPENDA5LE CAFACITY (BROSS MWE)........................
1,184.2 B. Mr.XIM'JM DEPENDABLE CAPACITY (NET MWE)..........................
1,137.0 l
9.
IF CHANSES DCCUR AB0VE SINCE LAST REFORT, REASONS ARE...........
Change in nu: lear unit rating due to capability audit - effective 12-88.
- 10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)...............N/A c
- 11. REASON FOR RESTRICTION, IF ANY....N/A l
MONTH YEAR TO DATE CUMULATIVE 10 DATE
=
=r
======
- 12. HOURS IN REPORTINS PERIOD 744.0 5,831.0 29,447.0
- 13. NUMEER OF HOURS THE REACTOR WAS CRITICAL 744.0 3,987.6 22,947.4
- 14. REACTOR RESERVE SHUTDOWN HOURS 0.0 29.0 723.9
- 15. HOURS GENERATOR ONLINE 744.0 3,910.7 22,457.3
- 16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 17. BROSS THERMAL ENERBY GENERATED (MWH) 2,463,752.0 12,766,519.0 74,314,660.4 l,346,343.0 25,605,736.5
- 18. GROSS ELECTRICAL ENER6Y GENERATED (MWH)
E43,867.0 i
- 19. NET ELECTRICAL ENERSY GENERATED (MdH) 808,463.8 4,133,454.9 24,411,716.8
- 20. UNIT SERVICE FACTOR 100.0 67.1 76.3
- 21. UNIT AVAILABILITY FACTOR 100.0 67.1 76.3
- 22. UNIT CAPACITY FACTOR (USING MDC NET) 95.6 62.3 72.6
- 23. UNIT CAPACITY FACTOR (USING DER NET) 94.2 61.4 71.9
- 24. UNIT FORCED DUTAGE RATE 0.0 10.7 9.7
- 25. UNIT FDRCED DUTAGE HDURS 0.0 469.2 2,416.2 SHUTDOWNS SCHEDULED DVER NEXT SIX MONTHS (TYPE, LATE, AND DURATION OF EACH)..............
N/A IF CURRENTLY SHUIDOWN, ESilrATED STARTUP DATE......N/A 8909180216 t $708Q,_ i ODgy*'
FfDR ADOCK N
i_____________________
_____._________________._______________________J
4 4
.e AVERAGE DAILY UNIT KMER LEVEL r
p.
DOCKET NO.
50-423 L
UNIT Milletone Unit 3-DATE 09-05-1989 COMPLETED BY A. L. FlMS 203-4(4-5388 MONTH AUGUST I
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL s
(MWE-NET)
(MWE-NET) 1 1.137 16 1.125 2
1.132 17 1.143 3
1.113-18 1.109 4
1.131 19 1.112 5
1.125 db 1.121 6
1'.128 21 1.107 7
1.128 22 1.118 8
1.104 23 1.112 9
1.100 24 1.107 10 893 25 1.097 11 800,_
26 1.119 12 1.117 27 1.122 13 943 28 1.124 14 835 29 1.119 15 1.131 30 1.120 31 1.118
t n o L s
m 3o8E4 cnn 2r-eee nof(
a 4s7 rvr Ii S
.)
i0A3 rer tst) 0L-0 oru atr1 -
5I9Y2 CPc reo6
.M0B(
'e Gaep1 1 dor pne0 OE DE nt teSR-t NM EN a t ir G i bPWtE b
A TO nn i
nR i TN EH eoe E-LP siv hrteU h KTEPE ute xonvN x CITML acr EfEE( E ONAOE CAP DUDCT 4
5 tne m
n
)
n amho)n o
roti0i pe mcr nt a md aSf oc=l oo r
mu p CC ccd dnx Sie seoE tu uRi(
m llan o t e
aamiirar S
te duuot vere N
sd onntnewuh O
yo haauoroDt I
SC tMM A C pP(O T
e-C M1234 5 9 UD e
E e o 3
R s N nt R
ent m
E cep a
W ive x
O LER E
P e
9
-)
)
)
D8 fn3 n
s n N9 ow(
i ni A1 or a
e a ddo l
c l ST o t p
ni p NS htc x
oL x WU tua E
i E
OG ehe (t t&
(
c.
TA e e ig r U
rT rn o H
n u
ti r S
o lr sner s) io ei v E T
a2 a
Rai I
e(
Fe rtl t n gnT a a c
N R
rn U
nanorto s
enitosi anr
- melatit rou sptelanar uio ni n u u ri r DtH o u if ge m eh s qa e e pd pt aEMRROAOO e
e-p)
RABCDEFGH y1 T(
2 se e
l t
du a
ed D
ce rh oc FS E
N FS o
O N
N 1
L'
REFUELING INFORMATION REOUEST
.,,c AUGUST 1989 1.
Name of facility: Millstone 3.
2.
Scheduled date for next refueling shutdown:
November 17. 1990.
3.
Scheduled date for restart following refueling:
January 15. 1991 4.
Will refueling of resumption of operation thereafter require a technical specification change or other license amendments?
E/.A 5.
Scheduled date for submitting licensing action and supporting information.
N/A.
6.
Important licensing considerations associated with' refueling, e.g.,
new of different fuel design or supplier, unreviewed design of performance analysis methods, significant changes in fuel design, new operating procedures:
El.h 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a): JJ_3L (b): 1s_0q 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that-has been requested or is planned, in number of fuel assemblics:
Present size - 756.
No increase reauested.
9.
The projected date of the last refueling that can be dis-charged to the spent fuel pool assuming the present licensed capacity:
End of cycle 5.
)
r
- _ - - _ - _ -