Text
_-_ _
/h UNITED STATES
["'
gi NUCLEAR REGULATORY COMMISSION 3
- E WASHINGTON, D. C. 20555 l
DETROIT EDISON COMPANY l
WOLVERINE POWER SUPPLY COOPERATIVE, INCORPORATED l
DGCKET NO. 50-341 FERMI-2 AMENDMENT TO FACILITY OPERATING LICENSE n
Amendment No. 33 License No. NPF-43 1.
The Nuclear Regulatory Commission (the Commission)'has'found that:
l A.
The application for amendment by the Detroit Edison Company (DECO or thelicensee)datedMarch 10, 1989, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with' the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of -
the Consnission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-43 is hereby amended to read as ' follows:
' Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 33, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. Deco shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
$$60M8$$$bh2 P
3.
This license amendment is effective as of the.date of its issuance.
~FOR THE NUCLEAR REGULATORY COMMISSION 7
0.1A.C dell, Acting Director Project Directorate III-1 Division of Reactor Projects - III,
-IV, V & Special Projects
Attachment:
Changes to the. Technical Specifications.
Date of Issuance: Nay 19, 1989 0
i
v ATTACHMENT TO LICENSE AMENDMENT fl0.33 FACILITY OPERATING LICENSE NO. NPF-43
-i DOCKET NO. 50-341 Replace the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by Amendment number and contains a vertical line indicating the area of change. The corresponding overleaf page is also provided to maintain document completeness.
REMOVE INSERT 3/4 3-85 3/4 3-85 3/4 3-86*
3/4 3-86*
i i
l
- 0verleaf page orovided to maintain document completeness.
No changes contained on this page.
1 1
1
-INSTRUMENTATION i-3/4.3.8 TURBINE OVERSPEED PROTECTION SYSTEM LIMITING CONDITION FOR OPERATION 3.3.8 At least one turbine overspeed protection system shall be OPERABLE.
APPLICABILITY:
OPERATIONAL CONDITIONS 1 and 2.
l ACTION:
With one turbine control. valve, or one turbine stop valve per high a.
pressure turbine steam lead inoperable and/or with one turbine low pressure stop valve or intercept valve per low pressure turbine steam lead inoperable,-restore the inoperable valve (s) to OPERABLE l
status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or close at least one valve in the affected steam lead (s) or isolate the turbine from the steam supply within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b.
With the above required turbine overspeed protection system otherwise inoperable, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> isolate the turbine from the steam supply.
SURVEILLANCE REQUIREMENTS 4.3.8.1 The provisions of Specification 4.0.4 are not applicable.
4.3.8.2 The above required turbine overspeed protection system shall be i
demonstrated OPERABLE:
a.
At least once per 7 days by cycling each of the following valves through at least one complete cycle from the running position and observing valve closure:
1.
Four high pressure turbine stop valves, 2.
Six low pressure turbine low pressure stop valves, 3.
Four high pressure turbine control valves, and 4.
Six low pressure turbine intercept valves.
b.
At least once per 18 months by performance of a CHANNEL CALIBRATION of the turbine overspeed protection instrumentation.
c.
At least once per 40 months
- by dismantling and inspecting at least I
one of each of the above valves and performing a visual and surface inspection of all valve seats, disks, and stems and verifying no unacceptable flaws or excessive corrosion.
If unacceptable flaws or excessive corrosion are found, all other valves of that type shall be inspected.
- The' initial surveillance test interval is extended on a one time basis to the first refueling outage.
FERMI - UNIT 2 3/4 3-85 Amendment No. 33
, INSTRUMENTATION-3/4.3.9 FEEDWATER/ MAIN TURBINE TRIP SYSTEM ACTUATION INSTRUMENTATION LIMITING CONDITION'FOR OPERATION 3.3.9 The feedwater/ main turbine trip system actuation instrumentation channels shown in Table 3.3.9-1 shall be OPERABLE with their trip setpoints set consistent.with the values shown in the Trip Setpoint column of
. Table 3.3.9-2.
APPLICABILITY:
As shown in Table,3.3.9-1.
ACTION:
a.
With a:feedwater/ main turbine trip system actuation instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.9-2, declare the channel inoperable and either place the inoperable channel in the tripped
' condition'until the channel is restored to OPERABLE status with its
. trip setpoint adjusted consistent with the Trip Setpoint value, or declare the associated system inoperable.
b.
With the number of OPERABLE channels one less than required by the Minimum OPERABLE Channels per Trip System requirement, restore the inoperable channel to OPERABLE status within 7 days or be in at least STARTUP within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c.
With the number of OPERABLE channels two less than required by the Minimum OPERABLE Channels per Trip System requirement, restore at least two channels to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least STARTUP within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS - 4.3.9.1 Each feedwater/ main turbine trip system actuation instrumentation channel shall be demonstrated OPERABLE by the performance.of the CHANNEL CHECK, CHANNEL FUNCTIONAL. TEST and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.9.1-1.
4.3.9.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of 1
i-all channels shall be performed at least once per 18 months.
FERMI - UNIT 2 3/4 3-86
_ _