ML20247K243

From kanterella
Jump to navigation Jump to search
Forwards Rev 9 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)
ML20247K243
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/12/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8909210113
Download: ML20247K243 (2)


Text

u L;

p.J LSAEGUAUS FORA ~.0N 1-11,.

DUKE Powen GOMPANY

' P.O. box 33189 -

CHARI.OTTE, N.C. 28242.

J HAL B. TUCKER -

TELEPHONE

===="

L

'ViMEN SEPlaATED FIGM ENCLO50HE--

004) 373-4m1

~ ~ " " * "

HANDLE THIS DOCUt/DJ AS DE00?CT'J.tia September 12, 1989

.U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555

Subject:

Catawba Nec1 car Station Docket Nos. 50-413, -414 Safeguards Contingency Plan

. Revision 9 Dated September 12, 1989 Gentlemen:

As required by 10 CFR 50.54.(p), attached are four (4) copies of Revision 9 to the Catawba. Nuclear Station Safeguards Contingency Plan. Details of changes made in Revision.9 are outlined in the attached Synopsis of Changes page.

Revision 9 does not decrease the effectiveness of the Safeguards Contingency Plan.

Since this information provides details of the physical protection system at Catawba Nuclear Station, I request that this information be withheld from public disclosure in accordance with 10 CFR 73.21.

.Very truly yours, Q

/,

'fd k < a w

Hal B. Tucker WRC09.RD1/lcs Attachment xc: w/2 copies of attachment Mr. S. D. Ebneter Regional Administrator V. S. Nuclear Regulatory Commission Region II

.T553 P.O. Box 2257 k

Atlanta, Georgia 30301 monso112 wom l

EDR ADOCK o". coo 4;;3 Y

..; 6 tirs&J.tEL T? ? INMR hM.LE UL DnMUiT AS CE00M.* -

U.. S. Nuclear Regulatory Conmission September 12, 1989 Page 2 l~

l bxc: w/o attachment W. T. Orders (NRC Resident Inspector -. Catawba)

T. E. Owen R. M. Glover R. L. Gill, Jr.

R. D. Madden GS-Security File - 801.01 CN-Security File - 127.04

_- _ _ _ - _ _ _ - _ _ - _ _ - - _ _ _ -