ML20247K239
| ML20247K239 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 07/25/1989 |
| From: | Yandell L Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20247K245 | List: |
| References | |
| NUDOCS 8907310485 | |
| Download: ML20247K239 (8) | |
Text
. - - - _ - - _. -_-
+
[
(6p\\
UNITED STATES P
- yl f j NUCLEAR REGULATORY COMMISSION
~
5
.,-C-WASHINGTON, D. C. 20555 h4 7,((
4....
NORTHERN STATES POWER COMPANY DOCKET NO. 50-282 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT NO. l' AMENDMENT TO FACILITY OPERATING LICENSE Amen # ment No. 88 License No. DPR-42 1.
The Nuclear Regulatory. Commission (the Commission) has' found that:
A.
The application for amendment by Northern States' Power Company (the licensee) dated October 24, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized
-by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Facility Operating License No. DPR-42 'a hereby amended by adding paragraph 2.B(6) to read as follows:*
"(6) Pursuut to the Act and 10 CFR Parts 30 and 70, to transfer by-product materials from other NSP job sites for the purposes of volume reduction and decontamination."
(
8907310485 890725 PDR ADOCK 05000282 P
. 3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION M(G%(.E.
QAACb Lawrence A. Yandell, Acting Director Project Directorate III-1 Division of Reactor Projects - 121, IV, V
& Special Projects Office of Nuclear Reactor Regulation
Attachment:
Page 3 of license Date of Issuance: July 25, 1989
- Page 3 is attached, for convenience, for the composite license to reflect this change.
l i
l
)
h 8
g
- ~v bh F
[
. E 'y ;.,</[g"g UNITED STATES NUCLEAR REGULATORY COMMISSION.
y WASHINGTON, D. C. 20555 g-/
f'9RTHERN STATtS POWER COMPANY DOCXET NO. 50-306
' PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 81' License No. DPR 1.
' The Nuclear' Regulatory Commission (the Commission) has found that:
A.
The application for amendment Ly Northern States Power Company (the.l.icensee) dated October 2!
M88, complies with the standards and requirements of the Atomb....;.gy Act of 1954, as amended (the Act),-and the Commission's rules and regulations set forth' in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of_the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be.
conducted in compliance with the Commission's regulations; D.
The 1ssuance of this amendment will not be inimical to the common defense'and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Facility Operating License No. DPR-42 is hereby amended by adding paragraph 2.B(6) to read as follows:*
"(6) P;rsuarit to the Act and 10 CFR Parts 30 and 70, to transfer by product materials from other NSP job sites for the purposes of volume reduction and decontamination."
.r. f. [ '
- g '.'y e
-2 4
^'
-3.-.This license amendment is effective as of the date of its issuance.
' i 1
FOR THE NUCLEAR REGULATORY COMMISSION LOJAMC CAA A
1 Lawrence A.:Yandell, Acting Director Project Directorate III-1 Division of Reactor Projects - III,.IV,.VL
& Special Projects Office of. Nuclear Reactor Regulation-
Attachment:
Page 3 of. license Date of Issuance: July 25, 1989 i
q
- Page 3 is attached, for convenience, for the composite licerse to reflect this~ change.
A TACHMENT TO LICENSE AMENDMENT NO.an J
FACILITY OPERATING LICENSE NO. DPR-42 D_0CV;ET NO. 50-282 Revise the License by removing the page identified below and inserting the attached page.
The revised page is identified by amendment number and contains marginal lines indicating the area of change.
REMOVE INSERT l l'
l 4
i
)
l I
1
(4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess bn not separate, such byproduct and special nuclear materials a.-
may be produced by the operation of the facility; (6) Pursuant to the Act and 10 CFR Parts 30 and 70, to transfer byproduct materials from other NSP job sites for the purposes of volume reduction and decontamination.
C. This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 1650 megawats j
thermal.
]
I (2) Technical Specifications j
S i
The Technical Specifications contained in Appendix A, u
as revised through amendment No. 87, are hereby incorporated l
in the license.
Th. licensee shall operate the facility in 7
accordance with the Technical Specifications, g
1 UNIT 1 LICENSE j
7 l
+:
' [pe ato,*'o v
UNITED STATES.
, [' i #, c [,g NUCLEAR REGULATORY COMMISSION
,..E WASHINGTON, D. C. 20555
- g g
ATTACHMENT TO LICENSE AMENDMENT NO. 81 FACILITY OPEkATING LICENSE NO. DPR-60 DOCKET NO. 50-306 Revise the License by removing the page identified below and inserting the attached page. -The revised page is identified by amendment number and.
contains marginal lines indicating the area of change.
REMOVE INSERT l~
l o -
L-__-
Y
}'
w 1' L
(4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to
-receive, possess and use in amounts as required any by-product.
source or special nuclear material without restriction to chemical or physical form, for sample analysis or. instrument
.and equipment calibration or associated with radioactive apparatus or components;
-(5) Pursuant to the Act and'10 CFR Parts 30 and 70, to possess but not separate, such_by-product and special nuclear materials as I
may be produced by the operation of the facility; 1
~(6) Pursuant tolthe Act and 10 CFR Parts 30 and 70, to transfer byproduct materials from other NSP job sites for the purposes of volume reduction and decontamination.
C.
This amended license shall be deemed to contain and'is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations,-and orders of the. Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
.(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 1650 megawats thermal.
(2) Technical Specifications g
The Technical Specifications contained in Appendix A, f
~
as revised through Amendment No. 80, are hereby incorporated 4
in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
j N
t E
?o UNIT 2 LICENSE
_ _ _ _ _ _