ML20247J938

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-482/89-18 on 890626-30.No Violations or Deviations Noted
ML20247J938
Person / Time
Site: Wolf Creek 
Issue date: 07/20/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20247J944 List:
References
NUDOCS 8907310385
Download: ML20247J938 (2)


See also: IR 05000482/1989018

Text

_. _ _ _ _ _ _ _ _ _ -

,

W

<

,

, :. , . ,

g ,;

q ,

>

.Wf

'

, ,

Jb

.

f

'JUL 2 01999..

i" .

i

In' Reply; Refer To:

<

Docket: '.50_-482/89-18

, ,,

.

y

,

ti

J

Wolf Creek Nuclear" Operating Corporation

,

ATTN: Mr. Bart D. Withers

.

President and Chief Executive Officer

-

P.O. Box 411

,

,

Burlington, Kansas 66839

4

Gentlemen:

'Nis. refers.totheinspectionconductedby.Mr.J.R.Boardmanofthisoffice

during..the period of--June 26-30,1989,.of activities authorized by NRC

Operating License'NPF-42.for the Wolf Creek Generating Station. and to the

.

discussion of;our findings ~ with Mr. J. A. Bailey'and other members of your

staff at1the conclusion of the inspection.

' Areas examined duhing the inspection included the program for the control of

emergency diesel generator: fuel oil during storage and information relating to

the containment building temperature profile.. Within.these areas.-the

' nspection consisted of selective ' examination of procedures' and representative

i

'

records.. interviews with personnel, and observations by the-NRC. inspector. The

, inspection findings are documented in the enclosed inspection report.

,,

Within the sco'pe'of the inspection, no violations or deviations were

-

identified.

Ve have also examined actions you.have>taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of-.the enclosed' report.

Shouldlyou have any questions concerning this inspection, we will be pleased to

discuss them with you.

, . .

.

Sincerely,

Original Firmi 23

l. L. Mi!hoan

James _1. Milboan, Director

l

Division of Reactor Projects

L

Enclosure:

Appendix - NRC. Inspection Report

50-482/89-18 w/ attachments

cc w/ enclosure:

(see next page).

,

  • RIV:PSS
  • C:PSS
  • D:DRS

4h

D

  • P

'JBoardman

TFStetka

LJCallan

JLNilhoan

.

/. /89

/ /89

/ /89

} / /89

[60

'

  • Previously concurred

890731038U 690720

' t

PDR

ADOCK 05000482

b=_ n__ . _

_L__

I

- - -

rk

.

,

-

ifg

,-

l3f:{-f. - +

-

2

I;

,Jy

,

4' ,

Wolf Creet Nuclear Operating

-2-

j

!

u

(Corporation

V[c

pi'

<

Wolf" Creek Nuclear Operating Corporation

O4

- ATTN: Otto'Maynard, Manager

'

.

.

of Licensing'

'

P.0a Box 411

Burlington, Kansas 66839

' Wolf Creek Nuclear Operating Corporation

ATTN: Gary Boyer, Plant Manager

P.O.' Box411

.1

jf,

Burlington, . Kansas 66839

Kansas . Corporation Comission

ATTN: Robert D. Elliott, Chief Engineer

fourth Floor,' Docking State Office. Building

Topeka, Kansas 66612-1571

Kansas Radiation Control Program Director

'

' bec to D118 (IE01)

bec distrib. by RIV:

'*RRI

  • R. D. Martin, RA
  • Section Chief (DRP/D)
  • DRP
  • RPB-DRSS

R. DeFayette, RIII

  • RIV File

SRI, Callaway,.RIII

  • MIS System
  • RSTS Operator
  • Project Engineer (DRP/D)

Lisa Shea, RM/ALF

  • DRS-
  • D. V.' Pickett, NRR Project Manager (MS:

13-D-18)

  • J. Boardman
  • T. Stetka

l

  • w/766

.

1 .

.I,

v

.

.

.

_ _ _ _ - _ _

. - _ _ _ _ - - -