s 4'
S 4
Comm:nw alth Edison One First National Plaza Chicago, Illino:s Address Reply to: Post Office Box 767 Chicago, Illinois 60690
+
March 21, 1989 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Quad Cities Station Units 1 and 2 Application for Amendment to Facility Operating Licenses DPR-29 and DPR-30 Appendix A, Technical Specifications NRC_Iloclet Nos. 51-254Ed 50-265 I
i l
References (a):
J.C. Wright letter to C rdell Reed dated l
l dated April 29, 1988 t asmitting Inspection l
Report Nos. 50-254/8800'. and 50-265/88008.
(b):
A.B. Davis letter to Cordell Reed dated December 8, 1988 entitled " Discretionary Enforcement Relating to the Inoperability of High Pressure Coolant Injection (HPCI) due to Testing and Resultant Requirement to Test the Automatic Depressurization System (ADS) Valves".
Dr. Murley:
Pursuant to 10 CFR 50.90, Commonwealth Edison proposes to amend Appendix A, Technical Specification to Facility Operating Licensee DPR-29 and DPR-30 for the Quad Cities Nuclear Power Station.
In response,to the recommendation provided during an NRC Inspection in April,_1988 (Reference (a))
and the Discretionary Enforcement related to Technical Specification 4.5.C.2 (Reference (b)), the proposed changes revise the High Pressure Coolant Injection (flPCI) and Reactor Core Isolation Cooling (RCIC) testing requirements to be consistent with the requirements of NUREG-0123, Revision 3, Standard Technical Specifications for Genere.1 Electric Boiling Water Reactors, gg4ons!!8888$g4 Il P
1
q T.F..
Murley '
. March'21,'1989
)
\\
l In addition, operability requirements have been revised to be consistent with actual system design requirements. These changes are listed in Attachment 1 and further described in Attachments 2 and 3.
This Technical Specification revision commitment is being tracked as TAC No. 9001 under:tas j
{
NRC system.
. The proposed changes'have been reviewed and approved by both On-site and Off-Site review in accordance with Commonwealth. Edison Company's i
procedures. The proposed amendments have.been reviewed.in.accordance with 10' j
CFR 50.92fc) and determined that no significant hazards consideration exists.
This evaluation is docwnented in Attachment 4.
Commonwealth Edison is notifying the' State of Illinois of our application for this snendment by transmitting a copy of.this letter ' and its attachments to the designated State Official.
i Please direct any questions you may hat e regarding this. matter, to this office.
y very truly yours, j
I l
,/
R. Stols J
Nuclear Licensing 1. administrator 1m Attaciunents 1:
Proposed Changes to Appendix A Technical Specifications for Quad Cities 1 and 2 2:
Summary of Changes 3:
Description and Bases for Amendment Request 4:
Evaluation of No Significant Hazards i
cc Regional Administrator - Region III Of fice of Nuclear Facility Safety (IDNS)
D. Muller - NRR T.M. Ross - Project Manager, NRR 5578k