ML20247H784

From kanterella
Jump to navigation Jump to search
Amends 67 & 61 to Licenses NPF-35 & NPF-52,modifying Tech Spec Tables 3.3-7 & 4.3-4 to Change Elevation at Which Seismic Monitor Located
ML20247H784
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/18/1989
From: Matthews D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20247H791 List:
References
NUDOCS 8907310129
Download: ML20247H784 (7)


Text

. _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _

fa arag fe j%,

UNITED STATES

' f g

NUCLEAR REGULATORY COMMISSION To

j W ASHINGTON, D. C. 20555

%.....,o DUKE POWER COMPAy NORTH CAROLINA ELECTRIC MEMBERSHIP CORPORATION SALUDA RIVER ELECTRIC COOPERATIVE, INC.

DOCKET NO. 50-413 CATAWBA NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 67 License No. NPF-35 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Catawba Nuclear Station, Unit 1 (the facility) Facility Operating License No. NPF-35 filed by the Duke Power Company acting for itself, North Carolina Electric Membership) Corporation and Saluda River Electric Cooperative, Inc.,

(licensees dated April 26, 1989, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities ruthorized by this amenoment can be conducted without endangering 'ne health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; i

D.

The issuance of this amendment will not be inimical to the common j

defense and security or to the health and safety of the public; and l

I E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

8907310129 990718 PDR ADOCK 05000413 P

PNU

- 2.

Accordingly, the license is hereby amended by page' changes to the Technical Specifications as indicated in the attachments to this license amendment, and Paragraph 2.C.(2) of Facility Operating License' No. NPF-35 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in-Appendix A, as revised through Amendment No. 67, are hereby incorporated into the license.

The licensee shall operate the facility in accordance with the-Technical Specifications and the Environmental Protection Plan.-

3.

This license amendment is effective as of its 'date of. issuance..

FOR. THE NUCLEAR REGULATORY COMMISSION

/s/

Dayid.B.'Matthews, Director Project Directorate 11-3 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance:

July 18,1989 l

OFFICIAL RECORD COPY f LA J'I-3 PM:PDII-3 DEST:ES 4 OGC D:PDII-3 M

KJabbour:bd G. Bagchi

(>m$ua,44hDMatthews 06/F /89 06//4/89 06/ /4 89 06/u /89 CS/ /89 Car.):Tu A 07/?/t9 '

54p pro @

b tv-h

d

  1. pan

^I ou

'o

~.,,

UNITED STATES '

i

[

g NUCLEAR REGULATORY COMMISSION

}

p WASHINGTON, D. C. 20555

%...../

DUKE POWER COMPANY i

NORTH CAROLINA MUNICIPAL POWER AGENCY NO. 1 j

PIEDM0NT MUNICIPAL POWER AGENCY

]

DOCKET N0. 50-414 CATAWBA NUCLEAR STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE 1

Amendment No. 61

]

License No. NPF-52 i

l 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Catawba huclear Station, Unit 2

)

(the facility) Facility Operating License No. NPF-52 filed by the l

Duke Power Company acting for itself, North Carolina Municipal Power

]

Agency No. I and Piedmont Municipal Power Agency, (licensees) dated 1

April 26, 1989, complies with the standards and requirements of the i

Atomic Energy Act of 1954, as amended (the Act), und the Comission's j

rules and regulations as set forth in 10 CFR Chapter I; i

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by i

this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and 1

1 E.

The issuance of this anendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

l l

.- 2.

Accordingly, the license is hereby anended by page changes to the Technical Specifications as indicated in the attachments to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NFF-52 is hereby amended to read as follows:

]

(2) Technical Specifications The Technical Specificaticia contained in Appendix A, as revised through Amendment No.

61, are hereby incorporated into the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/s/

David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects-1/II Office'of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance: July 18, 1989 OFFICIAL RECORD COPY LA Q JI-3 PM:

I-3 DEST:ESGB OGC D:PDII-3 Mkoo KJabbour:bd GBagchi Mul-

/(DMatthews

)

06// /89 06/j4/89 06/ /89 06/tt /89 0 ON l

Osn.s gja,sy so are et(4Ll4

1a i

ATTACHMENT-TO LICENSE AMENDMENT NO. 67 FACILITY OPERATING LICENSE NO. NPF-35

)

DOCKET NO.-50-413-AND.

TO LICENSE AMENDMENT NO. - 61 l

FACILITY OPERATING LICENSE N0'. NPF-52 DOCKET NO.-50-414

{

l Replace the following' pages of the Appendix "A" Technical Specifications lwith the enclosed pages.

The revised pages are identified by Amendment nunber and 1

contain vertical lines indicating the areas of change.

l s

Amended Page 3/4 3-57 3/4 3-58 i

i 4

l l

i 4

i

-j

'l

)

l l

i

=___-_- -

>1 j

i TABLE'3.3,

1 SEISMIC MONITORING INSTRUMENTATION I

MINIMUM MEASUREMENT INSTRUMENTS INSTRUMENTS AND SENSOR LOCATIONS RANGE OPERABLE

1. Triaxial Time-History Accelerographs
a. 1MIMT 5070 (Remote Sensor A)

-1 g to + 1 g 1

Containment Base Slab j

1

b. IMIMT 5080 (Remote Sensor B)

-1 g to + 1 g 1

Containment Vessel Elev 619'5"

c. 1MIMT 5090 (Starter Unit) 0.005 g to 0.05 g 1

Containment Base Slab g

2.-Triaxial Peak Accelerographs

a. 1MIMT 5010 - Containment Bldg.

O g to + 2 g 1:

Elev 588' + 6 1/8"

[

)

b. 1MIMT 5020 - Containment Bldg.

O g to + 2 g l'

Elev 567'2 "

c. 1MIMT 5030 - Auxiliary Bldg.

O g to + 2 g 1

'i Elev 543'

3. Triaxial Seismic Switch 1MIMT 5000 - Containment 0.025 g to 0.25 g 1*

Base Slab

4. Triaxial Response-Spectrum Recorders
a. 1MIMT 5040 - Containment 0 to 34 g at 1*

Base Slab 2 to 25 Hz

b. 1MIMT 5050 - Containment Bldg.

O to 34'g at 1

Elev 579'3 "

2 to 25 Hz c.1MIMT 5060 - Auxiliary Bldg.

O to 34 g at 1

Elev 577' 2 to 25 Hz I

  • With reactor control room indication.

CATAWBA - UNITS 1 & 2 3/4 3-57 Amendment No.'67l(Unit 1)

Amendment No. 61 (Unit 2)

TABLE 4.3-4 SEISMIC MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS ANALOG CHANNEL CHANNEL CHANNEL OPERATIONAL INSTRUMENTS AND SENSOR LOCATIONS CHECK CALIBRATION TEST

1. Triaxial Time-History Accelerographs
a. 1MIMT 5070 (Remote Sensor A)

M*

R SA Containment Base Slab

b. 1MIMT 5080 (Remote Sensor B)

M*

R SA Containment Vessel Elev 619'5"

c. 1MIMT 5090 (Starter Unit)

N. A.

R SA Containment Base Slab

2. Triaxial Peak Accelerographs
a. 1MIMT 5010 - Containment Bldg.

N. A.

R N. A.

Elev 588' + 6 1/8" l

b. 1MIMT 5020 - Containment Bldg.

N.A.

R N.A.

Elev 567' 2 "

c. 1MIMT 5030 - Auxiliary Bldg.

N.A.

R N.A.

Elev 543'

3. Triaxial Seismic Switch IMIMT 5000 - Containment M

R SA Base Slab **

4. Triaxial Response-Spectru-Recorders
a. 1MIMT 5040 - Containment Base M

R SA Slab **

b. 1MIMT 5050 - Containment Bldg.

N.A.

R N.A.

Elev 579' 3 "

c.1MIMT 5060 - Auxiliary Bldg.

N.A.

R N. A.

Elev 577'

  • Except seismic trigger.
    • With reactor control room indications.

CATAWBA - UNITS 1 & 2 3/4 3-58 Amendment No. 67 (Unit 1)

Amendment No. 61 (Unit 2)

- - _ _ _ _ _ _ _ _ _ _ _ _ -