ML20247H695
| ML20247H695 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 05/22/1989 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20247H702 | List: |
| References | |
| NUDOCS 8905310293 | |
| Download: ML20247H695 (2) | |
See also: IR 05000461/1989017
Text
_ _
_
_ _ _ _ _
_ _ _ _ _ _ _ _
_ _ _ _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _ _
.
. _ _ _
..
.
'
.
.
m
MAY 2 21989
Docket No. 50-461
Illinois Power Company
ATTN: Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the routine safety team inspection conducted by P. R. Rescheske,
R. A. Hasse and A. M. Bongiovanni of this office on April 3 through 27, 1989,
of activities at the Clinton Power Station, authorized by NRC Operating
License No. NPF-62, and to the discussion of our findings with Mr. D. P. Hall
and others of your staff at the conclusion of the inspection.
The purpose of this inspection was to determine if field alterations and
plant modifications were being conducted in accordance with regulatory
requirements. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified
during the course of this inspection.
We request that you respond to the unresolved item identified in
Paragraph 3.b(3) of the enclosed Inspection Report concerning a potential
10 CFR 21 report.
In your response, you should address the applicability of
a 10 CFR 2i report or the justification for determining that a 10 CFR 21 report
was not warranted.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
CMil TC:,ED 5{ clClihu C. ';;rng
s905310293gg@$$$61
ADOCK
G. C. Wright, Chief
G
Operations Branch
Enclosure:
Inspection Report
No. 50-461/89017(DRS)
See Attached Distribution
I h RII
III
RIIJ
RIII
RIII
gYoiaNi5g
h
a
ps R
/
_
7
. _ _ _
_
_
.__
_ __ _ -_-__ _ _
L
.
.
.
,
\\fM1 ?? #0*
Illinois Power Company
2
Distribution
cc w/ enclosure:
. D. P. Hall, Vice President
J. S. Perry, Assistant
Vice President
R..D. Freeman, Manager,
Nuclear Station
Engineering Department
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division, Sargent & Lundy
Engineers
David Rosenblatt, Governor's
Office of Consumer Services
Sheldon Zabel, Esquire,
Schiff, Hardin, & Waite
L. Larson, Project Manager,
General Electric Cqmpany
Chairman of DeWitt County
Illinois Department of
l
Nuclear Safnty
D. Schopfer, Project Manager,
Sargent & Lundy Engineers
l
!
,
.-______.._a_m____
_m._
_ _ _ _ . _ - _ _ -