Monthly Operating Rept for Aug 1989 for Quad-Cities Unit 1
ML20247H549
Person / Time
Site: Quad Cities 
Issue date: 08/31/1989
From: Deelsnyder L, Robey R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RAR-89-64, NUDOCS 8909200015
Download: ML20247H549 (2)


Text

_ - _ _ - _ _

t

/. -

Commonwe:lth Edison

  • /

X)

~

Quad Cities Nuclear Power Station

(

- ;- $ 22710 206 Avenue North

\\

'~

/ Cordova, Ilknois 61242-9740

'N_y' Telephore 309/654 2241 RAR-89-64'

,s September 14, 1989 Director Nuclear Regulatory Regulations U.S. Nuclear Regulatory Commission Fail Station F1-137 Washington, D.C.

20555 Enclosed is Appendix C, Operating Data Report, for Unit One for the month of August, 1989. The number of gross electrical energy generated,

  1. 10, was incorrectly submitted with the Monthly Performance Report.

Please replace the original page with this page in your copy of the report.

Respectfully, COMMONWEALTH EDISON COMPANY QUAD-CITIES NUCLEAR POWER STATION 1

'R. A. Robe)

Technical Superintendent RAR/LFD/vmk Enclosure f&$

$$$923SS$Il $$$$hy ry I

s t

u

'O APPENOfX C OPERATING DATA REPORT DOCKET NO. 254 UNIT One DATg September 7, 1989 COMPLETED 8Y Lynne Deelsnyder l

TELEPHONg 309-654-2241 OPERATM STATUS 0000 030189 2400 083189 744

1. REPORT 1seS PER300:

Gross Hours IN ROPORTING PERIOO:

2511 mag. ogPENO. CAPACITY tance aesel. 769

2. CURR8NTLY AUTHORl280 POWER LEVEL t

?

Y 0540N SLOCTRICAL RATesse (Mas.aeso:

N/A

3. POWER LEVEL TO WMcCN RETRICTSO tlP ANY) IMWe>NsH:
4. AGABONS POR RESTRICTION OF ANYl:

THet MONTW YRTO OATE CUMULATIVE

5. NUMehl OF MOURS RSACTOR NAS CRITICAL.............. 744. 05550.3 123092.5 O.0 0.0 3421.9
8. REACTOR ROBERVE SMUTOOWN MouRs...................
7. MOUR$ GSNERATOR ON UNE........................ 735.2 5438.2 119097.4 O.0 0.0 909.2,
8. um? AsssRVE SMuf00Wes Moung......................
9. GROSS THERMAL ENERGY GENERAT80 (MWM)............. 145159211883237 253573315
  • 454131 3818445 821762,18
10. GROSE SLSCTRICAL ENSRGY GENER ATED (MWM).............

430917 3644578 77200A52

11. NET ELECTR4 CAL ENERGY GENERAT80 (WWMI..............

95.2 R1.I

12.
  • EACTOR SE RVICE F ACTOR.......................... 100. 0 100.0 95.2 83.4
13. AsACTOR AVAILABILITY PACTOR.....................

98.8 93.3 78.5

14. umi ssRVICE P ACTOR..............................

98.8 93.3 79.1

15. UNIT AVAILASI LITY P ACTOR..........................
14. umT CAPACITY P ACTOR euesne ss0Cl..................... 7 5. 3 81.3 66.2 73.4 79.2 64.5
17. umT CAPACITY PACT 0n tuono 0mip Mnet.................

1.2 6.7 5.4 te. umT PORCs0 0uTAGE RATE..................

19. SMUTD0WesS SCMSOUL80 0vtR NEXT S woNTMS (TYPt. DATE. AND OWRATION CP SACHl:
20. tP SMUT 00nN AT END OF REPORT PERICO. ESTIMATED DATE OP STARTuP:_
21. umTS IN Tt3T STATUS (PRIOR TO CouwERCI AL OPERATION):

POROCAsT ACHIEVED INITtAL CRITICALITY imTIAL ELECTRICITY Comme 8ACIAL OPERATleef 1.1M