Requests Addl Info Re Util 890317 Application for Amends to Licenses DPR-57 & NPF-5,per Generic Ltr 87-09
ML20247H156
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/17/1989
From: Crocker L
Office of Nuclear Reactor Regulation
To: Hairston W
GEORGIA POWER CO.
References
GL-87-09, GL-87-9, TAC-72766, TAC-72767, NUDOCS 8905310173
Download: ML20247H156 (4)


Text

-__

r*4g fg UNITED STATES

[

g NUCLEAR REGULATORY COMMISSION i

7.

E WASHINGTON, D. C. 20655

%*****)

May 17, 1989 Docket Nos. 50-321 i

and 50-366 I

Mr. W. G. Hairston, III Senior Vice President -

Nuclear Operations Georgia Power Company 1

P.O. Box 1295.

Birmingham, Alabama 35201

Dear Mr. Hairston:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON AMENDMENT APPLICATION TO INCORPORATE THE PROVISIONS OF GENERIC LETTER 87-09 FOR HATCH 1

UNITS 1 AND 2 (TACs 72766 AND 72767)

The basis for accepting Specification 3.0.4-related amendments under Generic

. Letter 87-09 is predicated on two assumptions, namely,:

1) that the remedial measures prescribed by the Technical Specification ACTION STATEMENTS for which the exception will be granted provide a sufficient level of protection to i

permit operational mode changes and safe long-term operation consistent with the licensing basis described in the Updated Safety Analysis Reports for Hatch Units 1 and 2; and 2) that it will be the exception when plant startup commences with important safety features inoperable, irrespective of the exceptions granted in response to applications under Generic Letter 87-09.

We have reviewed the amendment application to incorporate the provisions of Generic Letter 87-09 in the Technical Specifications for Hatch Units 1 and 2, submitted by your letter of March 17, 1989.

In order, for the NRC staff to conclude that the safety basis relative to the above stated assumptions is satisfied, we request that for each proposed Technical Specification exception to be granted under Generic Letter 87-09, you affirm that remedial measures prescribed for the afft.cted ACTION STATEMENTS are consistent with the Updated Safety Analysis Report and its sopporting safety analyses.

In addition, we request that you identify and affirm those administrative controls (e.g.,

maintenance program provisions, plant operating procedures, management directives, onsite safety reviews, etc.) that have been established to limit the use of the Specification 3.0.4 exceptions granted. Your affirmation should address training necessary for ensuring that plant operators are made aware of, and are instructed to exercise the controls promulgated in limiting the use of such exceptions.

DFvJ-8905310173 890517 DR p

ADOCK 05000321 PDC

d Mr. W. G. Harristoa, III May 17, 1989 Please advise, within five days after receipt of this letter, when we may expect to receive your response. Should there be any questions concerning this request, please let me know.

The request in this letter affects fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Since rely, A%

~

Lawrence P. Crocker, Project Manager Project Directorate 11-3 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation cc: See next page

Mr.' W. G. Harriston, III' May:17, 1989 Please advise, within five days after receipt of this letter, when we may expect to receive your response. Should there be any questions concerning I

this request, please let me know.

The request in this letter affects fewer'than ten respondents; therefore, OMB clearance is not required under P.L.96-511..

Sincerely,

/

f5 Lawrence P. Crocker, Project Manager Project Directorate 11-3 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION)

-Docket J11e e NRC & Local PDRs PDII-3 Reading OFo r i

S. Varga, 14-E-4

,/,

G. Lainas l

D. Matthews M. Rood L. Crocker l

OGC-WF E. Jordan, MNBB-3302 ACRS (10), 9-A-2 B. Grimes J. Stefano,13-H-15

[RAI RE GL 87-09]

(AgDfI-3 PM:PD I-3 D:PDII-3 MRotid LCrocker:bd DMatthews 05//J/89 -

05//7/89 5//7/89 i

_1___.__._.

Mr. W. G. Harriston Edwin 1. -Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 r

cc:

G. F. Trowbridge, Esq.

Mr. R. P. Mcdonald.

.Shaw, Pittman, Potts and Trowbridge Executive Vice President -

2300 N Street, N. W.

Nuclear Operations

. Washington,-D.C. 20037 Georgia Power Company P.O. Box-1295 Mr. L. T.~Gucwa Birmingham, Alabama 35201 Engineering Department Georgia: Power Company Mr. Alan R. Herdt, Chief P. O. Box 1295 Project Branch #3 Birmingham, Alabama 35201 U.S. Nuclear Regulatory Commission 101 Marietta Street. NW, Suite 2900 Nuclear Safety and Compliance Manager Atlanta, Georgia 30323 Edwin I. Hatch Nuclear Plant Georgia Pot.,tr Company P. O. Box 442 Baxley, Georgia 31513-Mr. Louis B. Long-

. Southern Company Services, Inc.

P. O. Box 1295 Birmingham, Alabama 35201-Resident Inspector U.S. Nuclear Regulatory Commission l

Route 1, Box 725 Baxley, Georgia 31513 Regional Administ'rator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 270' Washington Street, S.W.

1 Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Director Environmental Protection Division Department of Natural Resources 205 Butler Street, S.E.,

Suite 1252 Atlanta, Georgia 30334 Chairman Appling County Commissioners County Courthouse Baxley, Georgia 01513

-