Monthly Operating Repts for June 1989 for McGuire Units 1 & 2
ML20247H144
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 07/14/1989
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20247H138 List:
References
NUDOCS 8907280297
Download: ML20247H144 (10)


Text

- -..

.- ~

h, s

OPERATING DATA REPORT.

DOCKET ND 50-369 DATE July 14.'195 I

DPEEATIN3 STATUS.

COMFLETED BY R.A. Williaes TELEPHONE 704-373-5987'

'l.~ Unit Name: McGuire 1 2 Reporting Period: June 1, 19B9-June 30, 1989

'3. Licensed Thereal Power (MWt).

3411-i

~4'. Naseplate Rating (Bross MWe):-

1305*

Notes

  • Nameplate Rating 5.' Design Electrical Rating (Net hWe):

1180.

[6 toss MWel calculated as 6.'.Maximus Dependable Capacity (Bross MWe):

1171 1450.000 MVA x.90 power

7. Maximus Dependable Capacity (Net MWe):

1129.

factor per Page lii, q

'a, if Changes Occur in Capacity Ratings (Itees Nanter 3 Through 7) Since Last NURE6-0020.

Re, ort. Give Reasons:

9. Fower Level To Which Restricted, If Any (Net MWe):

'10. Reason For Restrictions, If any:

This Month Yr.-to-Date Cumulative

.11.'~Heurs in Reporting Period 720.0 4343.6 66455.0 12.'Nasber Of Hours Reactor Was Cr.itical 720.0 2039.4 46406.B

13. Reactor Reserve Shutdown Hours

--0--

--0--

14. Hours Generator On-Line 711.3 2824.5 45934,4

'15. Unit Reserve Shutdewn Haurs -

-+-

--0--

~16. Bross Thereal Energy Generated (MWH) 2412733 9176302 136802027

'i7. Grott Electrital Energy Generated (MWH) 219973 3167671 47266628 1E. Net Electrical Energy Generated (MWH) 789339 3033008 45096616

'19.-UnitServicefactor 98.8 65.0 69.1

20. Unit Availability Factor.

98.8 65.0 69.1

21. Unit Capacity factor (using MDC Net) 97.1 61.9 59.4
22. Unit Capac'ity Facter (Using DER Net) 92.9 59.2-57.5
23. Unit Forcee Outage Rate 1.2 34.9 13.3
24. Shutdown Scheduled Over Next 6 Harths (Type, Date, and Duration of Each):

None

-25. If Shut Down At End Of Report Period. Estieated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL DPERATION 1

8907280297 890714 PDR ADOCK 05000369 R

PDC

II w.

[..

,3 l __ $

CPERATING DATA REPORT DOCKET NO-50-369 UNIT--

McGuire 1

-DATEJuly 14. 1889 COMPLETED BY R. A. Williaes TELEPHONE 704-373-5987-MONTH'

-June,1999-

.[E AVERAGE DAILY POWER LEVEL.

EM

'AVERABE DAILY F0WER LEVEL (MWe-Net)--

(MWe-Net) 1 1131 17 1113 2:

1127 10 1103 3-11E4 19 1111

,4-1131 20 1112' 5

!!29 El 1067 6

1132' 22 1112 7

1129 23 Illt 6

1124 24

!!05 9-1130 25 1102

'10 1119 26 1108 11 '

1111 27

!!09 12

!!!5 28 1106 13 1118 29 1097 14 1113 30 560

15 1115 16 1119

1 e

nac e

otn c

iae r

2 E

tDc u

6 N

c i

o 7

I ufL)

S S

5 B

A ro R)

L R

R H

C t

rE1 e

1 L

3 E

U E

I snoL6 m

9 I

7 H

T D

T noF( 1 a

E 8 M

3 E

C I

Ii 0

S 9 R /

V E

T H

O R

' tst -

I C

A E

T C

atrG 6

I 4

1 3 U 1 L

4 T

N P

D reoE G /

0 C

E S

S E

D GaepR I

0 C 7 7

E R

I OM UME pheU 5

M 0 J ROR D

TE DEY teSRN t

(

RTU L

TA ir

(

i O

C R

EB PST b P yt b

.EEY E CNE E

UO IYS i

rne 1

OMTB N OR P

DR RS hrtel h

NAA O

DI P

T R

xonvi x

NDD H NTT N

N LO EfEEF E

)

)

T E P ACN O

OM EOT 4

5 ET T E AE I

IE NRC

(

(

KI E L E

V T

TT ITA CN L E S

E C

CS BNE OU P T U

R U

UY ROR D-M A

P D

DS UC; O

C E

E T

S m)

C RT RL EM an S

O LNE ri RE RR AIL mca EU ET UBB aSl WQ WN NRO r

p OE OO AUR ccx PR PC MTP SiEt(

S lla N

aamr O

T duuoe I

N Z

U U

onnth T

E Z

R R

haaut

)

C 9

5 NE Z

T T

tMMAO U

8 OD Z

S S

e-(

D 9

PO Z

N N

M1234

)

E 1

MC Z

I I

3 R

O

(

e C

R n

n E

u E

o W

J SMD Z

A A

i

)

O 4

YEO Z

H H

t STC a

P

(

n D

i N

m A

E a

S T

x S

NTR E

N ENO W

H CEPO e

)

O T

IVEN n

s D

N LER i

n T

O a

e

)

U M

l c

n H

TN p

ni i

S T

TD UWX x

oL a

)

R 3EOFHO/

E i

l T

O MHOSDR t

t&

p

(

(

I P

s c

x N

E ee i g E

)

U R

2 F

A A

rt rn

(

REASON u

ti

(

)

lr snern io eivoi N

a Raira O

Fe rtrl IS c

yTaEp TR tngr r

x AU nanortrE RO enitoso(

UH melatit D

ptelanar ninuurire ouifgemeh s q a e e pd pt

)

1 TYPE S

F F

aEMRROAOO e- - - -

(

RABCDEFGH

)

2 1

0 0

(

2 3

3 E

6 6

6 d

T e

A l

D 9

9 9

du 8

8 8

ed ce rh P

P oc FS NO 1

2 3

1 1

)

FS 1

t!lli!

l

a DOCKET NO:

50-369 UNIT:

McGuire 1 l

DATE:

07/14/89 i

NARRATIVE

SUMMARY

Month: June 1989 McGuire Unit 1 began the month of June at 100% full power. On 6/21 at 0110 the unit reduced to 77% power per the Dispatcher and held there until 0502 on 6/21.

The unit reached 100% full power at 1022 on 6/21 and remained there until 6/30 at 1035 when the unit experienced a runback to approximately 30% power due to Digital-Electro Hydraulic Turbine Control System problems.

At 1343 on 6/30 the turbine was manually tripped for the same reason. The Reactor remained critical. The unit returned to service at 2225 the same day and ended the month increasing power to 100%.

Prepared by:

S. C. Ballard Telephone: 704-373-8559 l

~ _ - - _ _ _ - - _ _ - _ _.

. =..

.y,

'a.

r MONTHLY REFUELING INFORMATION REQUEST.

r>

.l.

Facility name: McGuire, Unit 1 2.

Scheduled.next refueling shutdown:

Februarv 1990' 3.

Scheduled' restart following refueling: April 1990 4.

Will refueling or resumption of operation.thereafter require a technical y

- specification change or other license amendment?- No1

.If yes, what will.these be?

E If no, has reload design and. core configuration been' reviewed by Safety Review Committee regarding unreviewed safety; questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and' supporting' information: 'N/A 6.

Important licensing considerations (new or different. design or supplier, unreviewed design or performance analysis methods, significant changes in idesign'or new operating procedures).

~

'7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool: 369

'8.

Present'litensed fuel pool capacity:

1463 Size of requested or planned. increase:

9.

Projected date of last refueling which can be accoms,adat_ed by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE:

July 14, 1989 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

~

OPERATINS DATA REPORT DDCKET NO 50-370 DATE hly 14. 1990 OPERATING STATUS COMPLETED BY _f._A. Williees 1.UnitNahe:McGuire2

2. Reporting Period: hrie 1,1999-kne 30,1989
3. Licensed Thereal Foner (MWt):

3411

4. Nameplate Rating (Gross MWelt 1305a Notes +Nueplate Rating j
5. Design Electrical Rating (Net MWe):

1100 (9 toss MWe! talculated as

6. Maximus Dependable Capacity (Bross MWe):

1171 1450.000 MVA x.90 power 1

7. Maximus Dependable Capacity (Net MWe):

1129 factor per Page lii,

8. If Changes Dccur in Capacity Ratings (Items Nutber 3 Through 7) Since Last NUREG-0020.

l Feport. Give Reasons:

l

9. Pcwer Level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, li M.p 1..

l This Month Yr.-to-Late Cumulative l

l l

11. Hours in Reporting Period 720.0 4343.0 46751.0 l-

'12. Nester Of Hours Reactor Was Critical 720.0 4313.3 36072.7 l.

13. Feactor Reserve Shutdown Hours

--0--

--0--

--0--

1.

14. Hours Benerator On-Line 720.0 42B1.0 35339.0 l
15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

l

16. Eross Thersal Energy Generated (MWH) 2365375 13555159 114871263 l
17. Srcss Electrical Energy Generated (MWH) 826023 4747216 40201078 l
19. Net Electrical Energy Generated (MWH) 795141 4566376 3E556491 L
19. Unit Service factor 100.0 99.6 75.6 l-E0. Unit Availattlity Facter 100.0 99.6 75.6 l
21. Unit Capa:1ty Factor (Using MLC Net) 97.8 93.1 71 A l
22. Unit Capacity Factor (Using DER Net) 93.6 09.5 69.9 j
23. Unit Forced Dutage Rate 0.0 1.4 10.9 l
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

L Refuel Ing

.luly si _ loRQ in woolec l

l

25. If Shut Down At End Of Report Period. Esticated Date of Startup l'
26. Units In Test Status (Frior to Co uercial Operation):

Forecast Achieved i

Ir!TIAL CRITICALITY l

INITIAL ELECTRICITY COVERCIAL CFERATION

'4 w

. OPERATING DATA REPORT n~

,7. y,

DOCKET ND

'50-370.-

. L' NIT --

McGuire 2 DATEJuly 14,1989 COMPLETED ?Y R. A. Williaes TELEPHONE-704-373-5967 RONTH '

June, 1989

- QQ.

AVERABE DAILY POWER LEVEL PAQ AVERAGE DAILY POWER LEVEL

(MWe-Net)

(MWe-Net)

-1 1149 17 '

1036

-2.

1148 18 1036 3

1143 19 1113' 4

1134 20 1141

^ 5 1147 21

!!41 6

1140-22 1141 7

1140 23 1140 B

1147' 24 1136 9

1141 25

!!34 10 1043 26 1136 1036 27 1136 12 1036 28 1116 13-1036 29 1093

'14 1037 30 1067 15 1037 16 1036 l

I l

l

_E/

V E

tst -

0 R4 I

C atrG 1

7I1 L' 4

T N

reoE 3U/

0 C

E GaepR G7

.7 E

R pheU 0

C0J ROR

.teSRN

(

5 M

RTU ir O

C b P yt EEY E CNE

%MTB N OR

.hrtel i.rne MAA O

DI xonvi NDD H NTT EfEEF

)

T' E P ACN ET' T E AE 4

(

KI E L E

V CN L E S

E OU P T U

R D

M A

P O

C m

C a

r mc aSl rcc SiE S

t lla N

aamr O

T duuoe I

N onnth T

E haaut

)

C 9

5 NE tMMAO U

8

(

OD e-D 9

PO

- M1234

)

E 1

MC 3

R O

(

e C

R n

E u

E W

J S MD

)

O 4

Y EO P

S TC

(

'D S

N N

A

'E O

S T

I S

NT R T

N EN O C

W H

CE PO U

)

O

.T IV EN D

n D

N LE R E

i T

O R

a U

M l

H T N p

S T

TD UW X x

)

R 3EO FHO /

E T

O MH OSD R

(

t

(

I P

s N

E

)

R ee U

R 2

O rt RE AS ON u

(

l r S

io N

N a

O W

Fe IS O

c TR D

tngr AU T

nano RO U

enito UH H

mel a D

S ptelan ninuuri ouif gem O

s q a e

)

1 TYPE N

aEMRR

(

e-RABCD

)

2

(

E d

T e

A l

D du ed ce rh oc FS NO FS

)

1

f.

L-DOCKET NO:

50-370-UNIT:

McGuire 2 DATE:

07/14/89 l-l NARRATIVE

SUMMARY

Month: June. 1989 McGuire Unit 2 operated for' entire month of June at or near 100% full power.

Prepared by:

S. C. Ballard Telephone: 704-373-8559

7s m

'.: U. *

'O,

g. * '.

l[

4 7

m 3

l IL

+

MONTHLY REFUELING INFORMATION REQUEST-y

.k Facility name: McGuire, Unit 2 1.

2.

Scheduled next refueling shutdown:

July 1989 l3..

Scheduled restart following refueling:

September 1989'

< 4i ' Will: refueling or. resumption of operation thereafter require a technical f specification change or' other licence ~ amendment?. No,

,If.yes, what will these.be?-

'If no, has. reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed. safety questions? N/A 5.

Scheduled'date(s) for submitting proposed licensing action and supporting.

.information: N/A' 6.

Important licensing considerations-(new or different design or supplier, unreviewed.' design or' performance analysis methods, significant changes in.

design or new~ operating procedures).

!7. Number of fuel. assemblies'(a) in the core: 193 (b) in the spent fuel; pool:

518 8.

Present licensed fuel pool capacity:

1463

~

Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE:

July 14, 1989 Name~of.

Contact:

J. A. Reavis Phone: 704-373-7567