Monthly Operating Repts for Aug 1989 for Peach Bottom Atomic Power Station,Units 2 & 3
ML20247H038
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/31/1989
From: Baron M, Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CCN-89-14147, NUDOCS 8909190198
Download: ML20247H038 (14)


Text

_ _ - _ - _ _ -_ - _ ._

l CCN-89'-14147 l < .

l

! e PIfILADELPHIA ELECTRIC COMPANY 4 sh PEACH BOTlDM ATOMIC POWER STATION R. D.1, Box 208 i l '

l  %'% 8 Delta, Pennsylvania 17314 PEACH 30T1DhTHE POWIR OF EIGLLrwcs (717)4567014 D. M. Smith Vice President September 14, 1989 ,

l Docket Nos. 50-277 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washing'on, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:

Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of August 1989 fonvarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, f l

~

44TO DMS/TEC/MJB: cmc gg*v Enclosure cc: R.A. Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania T.P. Johnson, USNRC Senior Resident inspector T.E. Magette, State of Maryland W.T. Russell., Administrator, Region 1, USNRC H.C. Schwemm, Atlantic Electric J. Urban, Delmana Power INPO Records Cen:er CQ889.NRC %2-8909190198 890831 I i

PDR ADOCK 05000277 l R PDC j hah--._u- _ _ - - -__.__________m- - _ _ _ _ _ _ _ _ _ _ _ _

NRC Monthly Operations Summr.ry Peach Bottom Atomic Power Station August 1989 UNIT 2 The unit began the month in the "Run" mode at 84% power. Power was increased to above 95% and a 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> continuous run was performed. A momentary actuation of the "J" MSRV occurred because of personnel error during surveillance testing. The plant response was proper, the error was corrected and surveillance testing was completed. Power was reduced to below 30% for troubleshooting a failure on a turbine control valve pressure switch. A repair was made and the unit was returned to 100% power, where it ended the month.

1 LEG 1 The unit remained shut down during the report period with modification activities in progress.

COD 889.NRC

z L H',

Docket No. 50-277 j Attachment to j Monthly Operating i i

Report for August 1989 UNIT 2 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 2

2. Scheduled date for next refueling shutdown:

(1) Reload 7 completed (2) Reload 8 scheduled for January 6,1991

3. Scheduled date for restart following refueling:

(1) Cornpletion of Power Ascension and Operator training targeted for September 1989.

(2) Restart following refueling scheduled for April 6,1991

4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

No.

If answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licensing action and supporting information:

Not applicable.

6. Important licensing ccusiderations associated with refuelir.g, e.g., new or different fuel design or supplier, unreviewed des ~gn or performance analysis methods, significant changes in fuel design, new operating procedures:

Refueling completed.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 1734 Fuel Assemblies,58 Fuel Rods COB 89.NRC

j l l Docket No. 50-277 Attachment to Monthly Operating )

Report for August 1989 .

Page 2

]

UNIT 2 REFUELING INFORMATION (Continued)

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1997 with full core offload capability.

CC0889.NRC

l.

4 l Docket No. 50-278 Attachment to Monthly Operating l Report for August 1989 UNIT 3 REFUELING INFORMATION

1. Name of faciEty:

Pes.ch Bottom Unit 3

2. Scheduled date for next refueling shutdown:

(1) Reload 7 in progress (2) Reload 8 scheduled for August 31,1991

3. Scheduled date for restart following refueling (1) Restart following refueling forecast for October 27,1989 (2) Restart following refuelirag scheduled for October 29,1991
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

(1) Cycle 8 Reload Amendment (2) Minimum 3RM Count Amendment 5, Scheduled date(s) for submitting proposed licensing action arad supporting information:

(1) Cycle 8 Reload License Amendment submitted July 1988 (2) Minimum SRM Count Amendment submitted December 1988 (3) Rod Sequence Control System / Rod Worth Minimizer modification to reduce start-up time, submitted July 1989.

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel desigr., new operating procedures:

None expected.

CC0889.NRC

_ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . . . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ __ _ . _ _ . _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -: -________J

6 Docket No. 50-278 Attachment to Monthly Operating Report for August 1989 Page 2 UNIT 3 REFUELING INFORMATION (Continued)

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pooh (a) Core - 0 Fuel Assemblies (764 assemblies offloaded during outage)

(b) Fuel Pool- 2260 Fuel Assemblies,6 Fuel Rods

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuci assemblies. This modification began on February 20,1987. The completion date for this modification has been rescheduled for the first quarter of 1990 to accommodate the Unit 3 outage.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

With the current fuel pool capacity (prior to the completion of the fuel pool reracking modification):

September 1996 without full core offload capability.

End of next cycle with full core offload capability (est. January 1991).

With increased fuel pool capacity (subsequent to the completion of the fuel pool rcracking modification):

September 2004 without full core ofiload capability.

September 1998 with full core ofCoad capability.

CCD889.NRC

1:: ,' .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEA",H BOTTOM UNIT 2 DATE SEPTEMBER 15. 1989 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 455-7014 EXT. 3321 MONTH AUGUST 1989 OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 884 17 1030 2 803 18 1034 3 963 19 1035 4 1050 20 1051 5 1055 21 1051 6 1057 22 1083

-7 1054 23 1025 8 10L0 24 1046 9 1055 25 1053 10 1049 26 1049 11 10t3 27 1047 12 1057 28 1045 13 720 29 1053 14 824 30 1041 15 1025 31 1042 16 1038

4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278

. UNIT PEACH BOTTOM UNIT 3 OATE SEPTEMBER 15, 1989 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER 5TATION TELEPHONE (717) 456-7014 EXT. 3321 MONTH- AUGUST 1989 OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (WE-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 l

10 0 26 0 11 0 27 0

l. 12 0 28 0 l

13 0 29 0 14 0 30 0 15 0 31 0 16 0 l

l l

l i I L______---_ , . - _ . - - - - - _ - - . - - _ - --_-------J

OPERATING DATA REPORT DOCKET NO. 50 - 177 DATE SEPTEMBER 15, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 455-1014 EXT. 3321 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 2 h:0TES: UNIT 2 IN POWER ASCENSION
2. REPORTING PERIOD: AUGUST, 1989 AS OF APRIL 26, 1989 3.LICENSEDTHERMALPOWER(HWT): 3293
4. NAMEPLATE RATING (GROSS MWE): 1152
5. DESIGN ELECTRICAL RATING (NET MWE): 1065
6. HAXIMUM DEPENDABLE CAPACITY (3ROSS MWE): 1098
7. HAXIMUM DEPENDABLE CAPACITY (NET MWE): 1051
8. IF CHAPSES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWLR LEVEL TO WHICH RESTRICTED, IF ANY (NET MVE):
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TD-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5,831 132,887
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,720.6 76.917.4
13. REACTOR RESERVE SHUTDOVN HOURS 0.0 0.0 0.0 1
14. HOURS GENERATOR ON-LINE 744.0 2,201.9 74,068.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l
16. GROSS THERHAL ENERGY GENERATED (MWH) 2,359,728 4.594,176 217,404.921
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 782,690 1,428,360 71,447,590 l
18. NET ELECTRICAL ENERGY GENERATED (HWH) 754.153 1,341,792 68,333,508 PAGE 1 0F 2 l

OPERATINGDATAREPORT(CON 11NUED) DOCKET NO. 50 - 277 DATE SEPTEMBER 15. 1989 THIS HONTH YR-TO-DATE CUMULATJYE

19. UNIT SERVICE FACTOR 100.0 37.8 55.7
20. UNIT AVAILABILITY FACTOR 200.0 37.8 55.7
21. UNIT F.APACITY FACTOR (USING HDC NET) 96.4 21.9 48.9 22.UNITCAPACITYFACTOR(USIhGDEP. NET) 95.2 21.6 48.3
23. UNIT FORCED OUTAGE RATE 0.0 9.6 14.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):

REFUELING CUTAGE

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTLP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 09/1f/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 i

PAGE 2 0F 2

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ . . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . . _ _ _ _ _ . _ _ .__ ____=_:___.._____

OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE SEPTEMBER 15, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY P. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 3 5 NOTES: UNIT 3 REMA!NED SHUT DOWN
2. REPORTING PERIOD: AUGUST, 1989 WITH MODIFICATION
3. LICENSED THERMAL POWER (MVT): 3293 ACTIVITIES IN PROGRESS.

4.NAMEPLATERATING(GROSSMWE): 1152

5. DESIGN ELECTRICAL RATING (NET MWE): 1065
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
7. MAXIMUM DEPENDABLE CAPACITY (hET MWE): 1035
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) $1NCE LAST REPORT, GIVE REASONS:
9. POVER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5,831 128,783
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0 0 76,357.4 l 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 0.0 0.0 13,929.3 i 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 215,278,901 17.GROSSELECTRICALENERGYGENERATED(MWH) 0 0 70,611,432
  • -7,803 *
18. NET ELECTRICAL ENERGY GENERATED (MWH) -40,215 67,612,940 l

l l PAGE 1 0F 2 l l l

j Negative generation provided for consistency with FERC reports.

I L___._________-____ _ _ - -__ - - - - - - - - - -- - --

y .

OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 278 DATE SEPTEMBER 15, 1989 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 0.0 0.0 57.4
20. HNIT AVAILABILITY FACTOR 0.0 0.0 57.4
21. UNIT CAPACITY FACTOR (USING HDC NET) 0.0 0.0 50.7 22.UNITCAPACITYFACTOR(USINGDERNET) 0.0 0.0 49.3
23. UNIT FORCED OUTAGE RATE 0.C 0.0 13.3 l 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH.):

1

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED OATE OF STARTUP: OCTOBER 21, 1989
26. UNITS IN TEST STATUS (PRICR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 PAGE 2 0F 2

UNIT SHUT 00VNS AND POVER REDUCTIONS DOCKE1 NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE SEPTEMBER 15, 1989 REPORT MONT'H AUGUST 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-7014 EXT.3321 METHOD CF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT i (4) (5) PREVENT RECURRENCE 8 890801 S 000.0 B 4 tyA kB CONRAD CONTROL ROD PATTERP ADJUSTMENT REACTOR VAS NOT SHUT DOWN 9 890813 F 000.0 A 4 N/A CC INSTRU EHC CONTROL CARD REPLACEMENT REACTOR WAS NOT SHUT DOWN (1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE i

1

___m________________..______________. _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - - - _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _

UNIT SHUTDOWNS AND POVER REDUCTIONS DOCKET 10. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE SEPTEMSER 15, 1989 REPORT HONTH AUGUST, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT i (4) (5) PREVENT RECURRENCE 7 890801 S 744.0 C 1 N/A RC FUELXX CONTINUATION OF REFUEL OUTAGE 744.0 (1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A-EQUIPMENTFAILURE(EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER) 0 - REGULATORY RESTRICTION 4 - DTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOLRCE