Advises That 890501 Request to Withhold Submittal Re Completed Assembly Repair Program Denied.Acceptability of Fuel Assembly Repair Program Outweighs Demonstrated Concern for Protection of Any Competitive Position
ML20247G584
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/19/1989
From: Boyle M
Office of Nuclear Reactor Regulation
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8905310015
Download: ML20247G584 (4)


Text

1 1

$.usw (f(

\\,

UNITED STATES j

i g

g g

NUCLEAR REGULATORY COMMISSION j

l WASHINGTON, D. C. 20555

.%,**V /

1 1

  • ++

May 19, 198s J

i Docket No. 50-245 Mr. Edward J. Mroczka Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Comr.tny Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Mroczka:

SUBJECT:

DENIAL OF REQUEST FOR WITHHOLDING FROM PUBLIC DISCLOSURE In a letter dated May 1, 1989, the Northeast Nuclear Energy Company (NNECO)

. submitted a letter providing details of a recently completed assembly repair program et Hillstone Nuclear Power Station, Unit No.1.

That letter and the attached affidavit requested that the entire submittal be withheld from public disclosure pursuant to 10 CFR 2.790.

Your reasons for requesting our withholding of this information were that the information is proprietary to General Electric and contains trade secrett.

i He have reviewed your submittal and all of the supporting information in accordance with the requirements of 10 CFR 2.790 and have concluded that you have not provided sufficient justification for us to determine that the information sought to be withheld f' rom public disclosure contains trade secrets or proprietary information.'*0ur review could not identify what infonnation, if any, in your tubmittel could be classified as trade secrets or proprietary. Accordingly, we have concluded that the information sought to be withheld from public disclosure does not meet tLa requirements of 10 CFP 2.790.

In addition, our review has led us to the conclusion that the right of the public to be fully apprised as to the basis for the acceptability of your fuel assembly repair program outweighs the demonstrated concern for the protection of any competitive position. Therefore, your reauest to withhold your May 1, 1989, submittal from public disclosure is denied.

Within 30 days from the receipt of this letter, your May 1,1989 submittal on the fuel assembly repair program will be placed in the Public Document Rooms.

If, within thirty (30) dcys of the receipt of this letter, you request withdrawal of this document in accordance with 10 CFR 2.790 (c), your request will be considered in light of the e.pplicable statutes and regulations and a determination made whether the document will be withheld from public disclosure and returned to you.

If the document is returned to you, we request that you submit another versior, of the document that clearly indicates OFoi l

8905310015 890519 l

ADOCK0500g45 DR

f f

Mr. Edward J. Mroczka what information is to be withheld and the basis for the request for withholding.

In any case, it is the NRC's position that sufficient information be available to the public to fully demonstrate the adequacy of i

your fuel assembly repair program.

Sincerely, L

1Ltdu Michael L. Boyle, Project Manager Project Directorate I-4 Division of Recctor Projects I/II Office of Nuclear Reactor. Regulation ec: See next page i'

l j

i Mr. Edward J. Mroczka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit No I cc:

Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Manager of Quality Assurance Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 96141-0270 Kevin McCarthy, Directcr Regional Administrator Radiation Control Unit Region I Derartment of Environmental Protection U. S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary First Selectmen Energy Division Town of Waterford Office of Policy and Management Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Station Superintendent W. J. Raymond, Resident Inspector Hillstone Nuclear Power Station Hillstone Nuclear Power Station Northeast Nuclear Energy Company c/o U. S. Nuclear Regulatory Commission Post Office Box 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut 06357 J. P. Stetz, Unit Superintendent Millstone Unit No. 1 l

Northeast Nuclear Energy Company

{

Post Office Box 128 j

Waterford, Connecticut 06385 I

l l

l o____---_

'Mr. Edward J. Mroczka.

what information is to be withheld and the basis for the request for withholding. _In any case, it is the NRC's position that sufficient inforraation be available to the public to fully demonstrate the adequacy of your fuel assembly repair program.

Sincerely,

/s/

Michael L. Boyle, Project Manager Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION l

4yDocket F,11ec...

w.

~'NRC &' Local PDRs PDI-4 Rdg. File SVarga BBoger SNorris MBoyle BKildee, OGC-Plant File i

I

[MR.EDWARDMROCZKA]

b' LA:PDI,4)

PM:PDI-4p%M PD:PDI-4 OGC 4

SNeVris MBoyle:cb JStolz BT ee 5/17/89 5/l"/ /89 5/j/89 5/gy89 l

l l

s l

E l