ML20247G572

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/89-24 & 50-446/89-24 on 890405-0502 & Notice of Violation
ML20247G572
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/18/1989
From: Warnick R
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20247G577 List:
References
NUDOCS 8905310013
Download: ML20247G572 (6)


See also: IR 05000445/1989024

Text

_ - _ _ -. .

.. .s

..

s ,

4 ,

<

MAY I 81989

In' Reply Refer To:  ;'

Docket: 50-445/89-24

50-446/89-24

Mr. W. J. Cahill

Executive-Vice President

TU Electric  ;

400 North Olive Street, Lock Box 81

Dallas, Texas 75201

Dear Mr. Cahill:  ;

This refers to the inspection conducted by Messrs. S. P. Burris and

S. D. Bitter during the period April 5 through May 2, 1989, of

activities authorized by NRC Construction Permits CPPR-126 and

CPPR-127 for the Comanche Peak Steam Electric Station, Units 1

and 2, and to the discussion of our findings with Mr. H. D. Bruner

and other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of selective examination of procedures and representative records,

interviews with personnel, and observation by the inspectors.

During this inspection, it was found that certain of your activities

were in violation of NRC requirements, as specified in the enclosed

Notice of Violation. A written response to this violation is

required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

f copy of this letter, the enclosures, and your response to this

letter will be placed in the NRC Public Document hoom.

,

The responser directed by this letter and the accompanying Notice ,'

! are not subject to the clearance procedures of the Gffice of

l Management and Budget as required by the Paperwork Reduction Act of

1980, PL 96-5111.

l

I

RI:IP:CPPD:NRR SRI:IP:CPPD:NRR IP:CPPD:N R AD:IP:CPPD:NRR

SBittegj/~p SBurris[ JWiebe RWarnick RW

l

, 5/jy/89 5//g /89 5/fg789 5/17/89

'0

3DR90saioo1s e9031e

g ADOCK 05o00445

9 6

\

PDC

_ _ _ _ - _ _ - _ _ - _ _

- _, _- _ _. _-_ - _ - _ _ _ - - _ _ _ _ _ _ _ _ _ _ - _ - _ . - - _ _ - _ _ _ _ _ _ ___. _____ - _ --_-_ -

'

'. 3 ,

,,%

'

., } .4

..' g.

,

M .J.

-

Cahill~ 2'

MAY. J 81989

c.

.Should.you haveLany questions concerning this inspection,fwe will be.-

pleased <tc discuss;them with you.

Sincerely,

~ . . . . . . . . . . . . . . . - - - - - .

DRIGINAL SIGNED BY R. F. WARNICE

R. F. Warnick, Assistant Director

.for Inspection Programs

Comanche Peak Project Division ,

Office of: Nuclear Reactor Regulation

. Enclosures:

Appendix A'- Notice of Violation . . .

. Appendix B . Inspection Report 50-445/89-24; 50-446/89-24 _ _

'cc: w/ enclosures.

See next page

.

,

l

_ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ .

. - - - - - _ _ _ _ - - _ - - _ _ _ _ - _ -

-

( -j

l

( -pf t! .

J

L4 ./ o

p UNITED STATES

8 n.

NUCLEAR REGULATORY COMMISSION

g WASHINGTON, D. C. 20555

l f

I\,...../ MAY I 81989 l

j

.In Reply Refer To:

Docket: 50-445/89-24

50-446/S9-24

1

Mr. W. J. Cahill

Executive Vice President

TU Electric

400 North Olive Street, Lock Box 81

Dallas, Texas 75201

Dear Mr. Cahill:

This refers to the inspection conducted by Messrs. S. P. Burris and

S. D. Bitter during the period April 5 through May 2, 1989, of

activities authorized by NRC Construction Permits CPPR-126 and

CPPR-127 for the Comanche Peak Steam Electric. Station, Units 1

and 2, and to the discussion of our findings with Mr. H. D. Bruner

and other members.of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of selective examination of procedures and representative records,

interviews with personnel, and observation by the inspectors.

During this inspection, it was found that certain of your activities

were in violation of NRC requirements, as specified in the enclosed

Notice of Violation. A written response to this violation is

required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a ,

'

copy of this letter, the enclosures, and your response to this

L letter will be placed in the NRC Public Doewnent Room.

The responses directed by this letter and the accompanying Notice

are not subject to the clearance procedures of the office of

Management and Budget as required by the Paperwork Reduction Act of

1980, PL 96-5111.

,

i

i  !

- _ _ _ _ _ - _ - _ - - _ . - - _ _ - - - _ - - - _ - - _ - _ _ _ _ _ - - - . _ _ - _ - - _ _ - - - - - - - - - - . - - - - - -

. . , . .

,'.  ;

,_

  • '

, .i '

L:

_

[W. . J..

Cahill' 2 . MAY I 81989

Should you have any questions concerning:this inspection, we will be

~

. pleased to discuss them.with you.

Sincerely,-

R P LOA

R.-F. Warnick, Assistant Director

for Inspection.Prograins

Comanche Peak Project Division

Office of Nuclear Rea'ctor Regulation

Enclosures:

Appendix A - Notice of Violation

Appendix B - Inspection Report 50-445/89-24; 50-446/89-24

cc: 'w/ enclosures

See next page

!

l

\

i

- - _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - - _ - _ . . -__

.

. - - . - . . . - . -_ - _..- _-- - - - -. --_. - - .---- - __--- -.-

h, .- ,

l{

y_K -c

l

p

'

L- . .

50-445/8.-M 50-446/ff-A[:

'

.- )

~

DISTRIBUTION: j

'

-%, . o .. , , , . , . . . . . . , . .

-

1

',LDocketTFilesf(50-445/446)f ~

NRC PDR

LPDR

CPPD-LA~

CPPD. Reading (HQ)

ADSP Reading

  • Site Reading File-

'

  • R.'Warnick'

'*J. Wiebe

  • H.'Livermore
  • MIS System, RIV-
  • RSTS-Operator, RIV.

RPB, RIV '

RIV Docket File

  • L. Shea, ARM /LFMB

J. Taylor

C. Grimes

'P. ' McKee .

-J.:Lyons

-J. H. Wilson

M. Malloy

J.' Moore, OGC-WF

M. Fields-

.J. Gilliland, RIV~

D. Crutchfield-

E. Jordan

B.. Grimes.

.B.. Hayes

, *w/766

i

- - . - - - - - ------..--_-_--.a-__---_-- -.--_-.-- --- -- - - - _ - - - ----_--__----__-,u --asa,,-,-_____--,,-,---,

,. _

.

. (

..

+ , W. J. Cahill

cc w/ enclosure:

Roger D. Walker TU Electric

Manager, Nuclear Licensing c/o Bethesda Licensing

TU Electric 3 Metro Center, suite 610

Skyway Tower Bethesda, Maryland 20814

400 North Olive Street, L.B. 81

Dallas, TX 75201 E. F. Ottney

P. O. Box 1777

Juanita Ellis Glen Rose, Texas 76043

President - CASE

1426 South Polk Street Joseph F. Fulbright

Dallas, TX 75224 Fulbright & Jaworski

1301 McKinney Street

Susan M. Theisen Houston, Texas 77010

Assistant Attorney General

Environmental Protection Division George A. Parker, Chairman

P.O. Box 12548, Capitol Station Public Utility Committee

Austin, TX 78711-1548 Senior Citizens Alliance of

Tarrant County, Inc.

GDS Associates, Inc. 6048 Wonder Drive

1850 Parkway Place, Suite 720 Fort Worth, Texas 76133

Marietta, GA 30067-8237

Lanny A. Sinkin

Christic Institute

1324 N. Capitol Street

Washington, DC 20002

Ms. Billie Pirner Garde, Esq.

Garde Law office

104 East Wisconsin Avenue

Appleton, WI 54911

Regional Administrator, Region IV

'

U.S. Nuclear Regulatory Commission

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas 76011

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas e

Heron, Burchette, Ruckert & Rothwell

1025 Thomas Jefferson St., NW

Washington, DC 20007